首页 | 本学科首页   官方微博 | 高级检索  
     检索      

电动机械取心钻具反扭装置实验台设计及实验
引用本文:范晓鹏,Pavel Talalay,郑治川,张楠,于成凤,宫达.电动机械取心钻具反扭装置实验台设计及实验[J].探矿工程,2013,40(12):18-20,24.
作者姓名:范晓鹏  Pavel Talalay  郑治川  张楠  于成凤  宫达
作者单位:[1]吉林大学建设工程学院,吉林长春130026 [2]吉林大学极地研究中心,吉林长春130026
基金项目:中国地质调查局地质大调查项目“地质勘查钻探技术综合研究与应用示范”之“极地冰下基岩取心钻具反扭系统研究”(1212011220280)
摘    要:大扭矩反扭装置是研制铠装电缆冰下基岩电动机械取心钻具的主要部分之一,该装置的失效将导致钻进无法进行,甚至将造成钻具脱落等严重的孔内事故。设计了铠装电缆钻具反扭装置实验台,并就实验装置的设计思想、设计原则、主要结构参数及初步实验结果进行了详细介绍。该实验台可以测试反扭装置在不同温度冰层和不同孔径任意组合下所能提供的反扭矩大小以及产生的下滑阻力。初步实验验证,该实验台工作性能良好,可以为更好的选择反扭装置类型及最优的使用参数提供重要依据。

关 键 词:冰下基岩  反扭装置  力学模型  取心钻具
收稿时间:2013/10/24 0:00:00
修稿时间:2013/12/3 0:00:00

sub-glacial bedrock; anti-torque device; mechanical model; coring tool
FAN Xiao-peng,Pavel Talalay,ZHENG Zhi-chuan,ZHANG Nan,YU Cheng-feng and GONG Da.sub-glacial bedrock; anti-torque device; mechanical model; coring tool[J].Exploration Engineering(Drilling & Tunneling),2013,40(12):18-20,24.
Authors:FAN Xiao-peng  Pavel Talalay  ZHENG Zhi-chuan  ZHANG Nan  YU Cheng-feng and GONG Da
Institution:1. College of Construction Engineering, Jilin University, Changchun Jilin 130026, China; 2. Polar Research Center, Jilin University, Changchun Jilin 130026, China)
Abstract:Anti-torque device with high torque is one of the main parts of the electromechanical coring tools of armored ca-ble type for sub-glacial bedrock drilling, the failure of this device will cause the drilling process ceasing, even will lead to the drill falling off and other drilling accidents.The experimental stand of anti-torque device for armored cable assembly is designed;the paper introduces in detail the design concept, design principle, main structure parameters and the prelimina-ry experimental results.This experimental stand can test the anti-torque of the anti-torque device in any combination with ice of different temperature and borehole of different diameter, and can show the sliding down resistance.The preliminary experiments verify that the experimental stand works well, and it can provide an important basis for the better selection of anti-torque device type and optimal operation parameters.
Keywords:sub-glacial bedrock  anti-torque device  mechanical model  coring tool
本文献已被 维普 等数据库收录!
点击此处可从《探矿工程》浏览原始摘要信息
点击此处可从《探矿工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号