条子泥一期工程对条子泥发育影响及工程防护措施
引用本文:陈才俊,徐向红. 条子泥一期工程对条子泥发育影响及工程防护措施[J]. 海洋工程, 2015, 33(5): 105-112
作者姓名:陈才俊  徐向红
作者单位:江苏省沿海开发集团有限公司,南京 210003;江苏省沿海开发集团有限公司,南京 210003
摘    要:
通过历史和现场观测资料并结合遥感卫片资料,对条子泥匡围一期工程两年多的建设过程中,由工程所引起对条子沙洲西大港、东大港、条鱼港等主要的潮沟,及相应的潮盆系统和二分水的剧烈变化进行了分析研究,总结了潮沟摆动治理经验。治理方法主要为丁坝群结合砼连锁块镇压排布防护技术等。

关 键 词:条子泥  辐射沙洲  匡围  潮沟

Influence of Tiaozini First-phase Project on Tiaozini development and project protection measures
CHEN Caijun and XU Xianghong. Influence of Tiaozini First-phase Project on Tiaozini development and project protection measures[J]. The Ocean Engineering, 2015, 33(5): 105-112
Authors:CHEN Caijun and XU Xianghong
Abstract:
Analyses and studies are conducted on the dramatic changes of tidal creeks in West Major Port, and East Major Port, Tiaoyu Port, etc. in Tiaozi sandbank as well as the corresponding tidal basin system and Erfenshui caused by the project within more than two years of construction time of the Tiaozini Inning First-Phase Project. The studies are mainly based on field observation data and timely satellite data to summarize the successful administrative experience. The main treatment technologies are: the spur dikes in combination with the concrete interlocking blocks.
Keywords:Tiaozini   radial sandbanks   inning   tidal creeks