首页 | 本学科首页   官方微博 | 高级检索  
     检索      

岩溶地区地下水位变动带隧道涌水问题的思考
引用本文:郑克勋,裴熊伟,朱代强,吴述彧,郭维祥.岩溶地区地下水位变动带隧道涌水问题的思考[J].中国岩溶,2019,38(4):473-479.
作者姓名:郑克勋  裴熊伟  朱代强  吴述彧  郭维祥
作者单位:中国水电顾问集团贵阳勘测设计研究院有限公司岩土工程公司,贵阳 550081/中国电建集团贵阳勘测设计研究院有限公司,贵阳 550081
摘    要:通过鸡冠山隧道涌水实例及广泛收集岩溶地区隧道涌水案例,总结出岩溶地区隧道季节变动带涌水具有反应时间快、水量大、泥沙重的特点,并综合分析地下水季节变动带隧道的水文地质特征,将其划分为一般山岭隧道及向斜构造地下水位变动带两种类型,且对两种类型涌水机理进行了阐述。岩溶地区隧道前期勘察应重点划分隧道岩溶地下水系统及地下水动力分带,查明岩溶发育特征与规律;施工期和运行期应结合岩溶揭露情况和涌水情况开展针对性的补充勘察,做好降雨、涌水过程和涌水压力监测,判断和预测最大外水压力和涌水量。针对涌水问题,提出封堵和排泄两种处理思路:施工开挖揭露的岩溶现象不可盲目封堵,需尽可能维持原通道的通畅,针对可能涌水的隧道衬砌设计不可仅考虑围岩结构,应充分考虑外水压力,做好围岩固结灌浆;常规隧道“环形排水系统+中心沟”排水系统可靠性差,针对大流量涌水,多采用泄水洞排水。 

关 键 词:岩溶隧道    季节性涌水    水文地质特征    岩溶管道置换    泄水洞

Thoughts on tunnel water inrush in changing zones of groundwater level in karst areas
ZHENG Kexun,PEI Xiongwei,ZHU Daiqiang,WU Shuyu and GUO Weixiang.Thoughts on tunnel water inrush in changing zones of groundwater level in karst areas[J].Carsologica Sinica,2019,38(4):473-479.
Authors:ZHENG Kexun  PEI Xiongwei  ZHU Daiqiang  WU Shuyu and GUO Weixiang
Institution:Key Laboratory of Karst Dynamics, MNR&GZAR / Institute of Karst Geology, CAGS, Guilin ,Guangxi 541004, China
Abstract:Based on analyses of the water inrush cases in the Jiguanshan tunnel and other examples in karst areas, it is summarized that water inrush in seasonal variation zones of tunnels can be characterized by fast response, large water volume and heavy sediment load. Based on hydrogeological features of tunnels in seasonal variation zones of groundwater, they are divided into two types, general mountain tunnels and tunnels associated with synclinal structural groundwater level variation zones. The mechanisms of water inrush are presented for both types. During the preliminary investigation of tunneling in karst areas, the demarcation of karst groundwater systems and groundwater dynamic zones should be focused on to understand the characteristics of karst development. During construction and operation periods, supplementary investigation should be carried out in combination with karst exposure and water inrush, which includes rainfall monitoring, water inrush and pressure monitoring to predict the maximum water pressure and inflow. Regarding water inrush, two treatment methods, i.e. dredging and blocking, are proposed and explained. The karst caves exposed during construction should not be simply blocked and the original passage should be well maintained. The lining design of the tunnel with possible water inrush should not only consider the surrounding rock structure, but also the external water pressure. Consolidation grouting should be applied where necessary. Due to the poor reliability of the regular annular drainage system and central ditch , in case of the large inflow of water, drainage tunnel should be used to drain water. 
Keywords:karst tunnel  seasonal water-inrush  hydrogeological characteristics  replacement of karst pipeline  drainage tunnel
本文献已被 CNKI 等数据库收录!
点击此处可从《中国岩溶》浏览原始摘要信息
点击此处可从《中国岩溶》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号