盾构隧道与矿山法隧道接合部施工工艺
引用本文:张二海,洪健,吴文涛. 盾构隧道与矿山法隧道接合部施工工艺[J]. 岩土钻凿工程, 2010, 0(1): 88-90
作者姓名:张二海  洪健  吴文涛
作者单位:铁科院(北京)工程咨询有限公司,深圳518034
摘    要:深圳地铁2号线蛇海区间采用盾构法+矿山法施工,但由于受地层及周边环境的限制,隧道接合部难以按原设计进行施工。经过研究比对,实际施工时采用了一种新的施工工艺,问题得以顺利解决,可供类似工程参考。

关 键 词:盾构隧道  矿山法隧道  接合部  施工技术

Construction Technique of Joint Section between Shield-driven Tunnel and Mined Tunnel
Zhang Erhai Hong Jian Wu Wentao. Construction Technique of Joint Section between Shield-driven Tunnel and Mined Tunnel[J]. , 2010, 0(1): 88-90
Authors:Zhang Erhai Hong Jian Wu Wentao
Affiliation:Zhang Erhai Hong Jian Wu Wentao (Beijing Engineering Consulting Ltd., China Academy of Railway Sciences)
Abstract:Shield-driven method is adopted in the construction of She-Hai metro running of Shenzhen metro line 2 combined with mining method. Due to geological condition and restriction of surrounding environment, it's of great difficulty to follow the construction procedures of joint section between shield-driven tunnel and mined tunnel based on original design. Thus, a new alternative construction technique is adopted to solve the problem through careful study and comparison of various schedules, which could provide reference for similar projects in the future.
Keywords:Shield-driven Tunnel   Mined Tunnel   Joint Section   Construction Technique