Estimation of transformation of flood runoff hydrographs and water stages in the Lower Volga and its delta |
| |
Authors: | V F Polonskii T Yu Solodovnikova |
| |
Institution: | (1) Center of Russian Waterworks Inventory and State Water Cadastre, Ministry of Natural Resources of the Russian Federation, 2/ 2-a, Pryanishnikov Str., Moscow, 127550, Russian Federation |
| |
Abstract: | A system of hydrographs’ quantitative parameters for the flood discharges and stages in the Lower Volga River and its delta
was developed. Water releases from the Volzhskaya Hydropower Plant and floods in the upper sections of the Volga River delta
caused by those releases were identified and grouped in accordance with their water content; their parameters were computed
for the entire period of the runoff managing (i.e., since 1961). In addition, parameters of typical hydrographs, which were
averaged for different categories of water content, were computed and their graphical models were plotted. Quantitative and
qualitative estimates of changes in shape of the discharge hydrographs in the Lower Volga were obtained for different flood
types, while for the water stage hydrographs in the Lower Volga and its delta, only quantitative estimation was carried out. |
| |
Keywords: | |
本文献已被 SpringerLink 等数据库收录! |
|