Settlement analysis of the Shuibuya concrete-face rockfill dam
Authors:Wei Zhou  Junjie HuaXiaolin Chang  Chuangbing Zhou
Institution:State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Hubei Province, China
Abstract:Settlement is one of the most important deformation characteristics of a high concrete-face rockfill dam (CFRD) and is regarded as a key indicator of dam safety. The time-dependent settlement behavior of the Shuibuya CFRD is studied on the basis of in situ settlement-monitoring records and displacement back-analysis. The goal of this work is to characterize actual deformation of the dam and to verify the back-analysis method used in this paper. The settlement-monitoring records were from seven control stations at the crest and 38 monitoring points inside the body of the dam and covered the construction period, the initial filling of the reservoir and 2 years of operation. A displacement back-analysis for parameters is performed by hybrid generic algorithms (HGAs) and finite element method (FEM). Comparative studies of monitoring data and back-analysis show good agreement between measured settlements and computed settlements. Furthermore, the deformation in the next 3 years is predicted on the basis of back-analysis. Overall, it is demonstrated that the deformation of the Shuibuya CFRD is basically stable and that the technique used to control the dam deformation is successful.
Keywords:High concrete-face rockfill dam  Settlement  Monitoring  Back-analysis  Shuibuya  Creep deformation
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号