首页 | 本学科首页   官方微博 | 高级检索  
     检索      

大型地下洞室对穿预应力锚索失效形式与耦合模型
引用本文:江 权,陈建林,冯夏庭,陈 静,崔 洁,万祥兵,侯 靖.大型地下洞室对穿预应力锚索失效形式与耦合模型[J].岩土力学,2013,34(8):2271-2279.
作者姓名:江 权  陈建林  冯夏庭  陈 静  崔 洁  万祥兵  侯 靖
作者单位:1.中国科学院武汉岩土力学研究所 岩土力学与工程国家重点实验室,武汉 430071; 2.中国水电顾问集团 华东勘测设计研究院,杭州 310014
基金项目:国家自然科学基金资助(No. 41172284,No. 11232014);广西防灾减灾与工程安全重点实验室开放课题资助(No. 2012ZDK02)。
摘    要:以锦屏二级水电站地下厂房与主变室之间中隔墙的多根对穿预应力锚索失效实例为背景,首先总结对穿预应力锚索失效的多种现场表现形式,采用现场取证和室内试验再现的方式论证锚索钢绞线断裂的拉破坏模式。将对穿锚索视为弹脆性体,被锚固围岩视为黏弹性体,提出描述对穿预应力锚索与被锚固围岩之间相互作用关系的锚索-围岩耦合元件模型,并据此分别阐明在洞室开挖卸荷阶段和围岩时效变形阶段中预应力锚索的力学响应机制和荷载变化规律。最后,在现场调研、室内试验和机制分析基础上,综合分析导致锦屏二级水电站地下厂房与主变室之间对穿锚索失效的主要原因,并探讨对穿预应力锚索与被锚固围岩之间对立统一的矛盾关系以及大型洞室群预应力锚索支护时机问题。

关 键 词:大型地下洞室  对穿预应力锚索  锚索失效  锚索-围岩耦合元件模型
收稿时间:2012-07-23

Failure format and interactive mechanism of prestressed thru-anchor cable in a large underground caverns
JIANG Quan,CHEN Jian-lin,FENG Xia-ting,CHEN Jing,CUI Jie,WAN Xiang-bing,HOU Jin.Failure format and interactive mechanism of prestressed thru-anchor cable in a large underground caverns[J].Rock and Soil Mechanics,2013,34(8):2271-2279.
Authors:JIANG Quan  CHEN Jian-lin  FENG Xia-ting  CHEN Jing  CUI Jie  WAN Xiang-bing  HOU Jin
Institution:1. State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China; 2. East China Investigation and Design Institute, Hydro China Huadong Engineering Corporation, Hangzhou 310014, China
Abstract:This paper pays main attention on the failure performance and excavation induced interaction of prestressed thru-anchor cable by a case study. In-situ investigation had shown that there were several failure formats of prestressed thru-cable in the Jinping II underground powerhouse. The observed proof also indicated that this kind of break of thru-cables belongs to tensile failure due to unloading deformation and time-dependent rheology of underground caverns. Thus, a new cell model is purposed to describe the interactive relation between thru-anchor cables and reinforced rock. This cable-rock cell model has special structure, i.e. an elasto-brittle cell is employed to representing the mechanical behavior of thru-anchor cables, and a viscoelastic Kelvin-Hooke cell is employed to representing the mechanical response of host rock. Based on this coupled model, several mechanical parameters which influence the cable’s load are discussed, including elastic modulus of cable, elastic modulus of rock, viscoelastic modulus of rock and coefficient of rock viscosity, etc. This discussion can help us to recognize the ambivalent relationship between thru-anchor cable and reinforced surrounding rock.
Keywords:large underground cavern  prestressed thru-anchor cable  failure of anchor cable  interactive model of cable and rock
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号