首页 | 本学科首页   官方微博 | 高级检索  
     检索      

西藏矿产资源潜力评价遥感专题中典型问题初探
引用本文:倪忠云,何政伟,吴华,刘婷婷.西藏矿产资源潜力评价遥感专题中典型问题初探[J].国土资源遥感,2011,22(1):97-101.
作者姓名:倪忠云  何政伟  吴华  刘婷婷
作者单位:1. 成都理工大学地质灾害防治与地质环境保护国家重点实验室,成都,610059;成都理工大学地球科学学院,成都,610059
2. 成都理工大学地质灾害防治与地质环境保护国家重点实验室,成都,610059;成都理工大学地球科学学院,成都,610059;首都师范大学资源环境与地理信息系统北京市重点实验室,北京,100037
3. 西藏自治区地质调查院,拉萨,850000
基金项目:中国地质调查局地质调查项目(编号: 1212010813025)、国家自然科学基金项目(编号: 40972225)和国家“十一五”科技支撑计划项目(编号: 2008BAK49B02)共同资助。
摘    要:西藏矿产资源潜力评价项目遥感专题通过提取各1:25万标准图幅及全区遥感异常信息和编制遥感推断地质构造图,为项目地质背景编图、成矿规律研究和矿产资源预测提供了基础性图件.因西藏全区面积广阔、涉及的遥感图像时相各异、图像处理软件及方法流程复杂,加之技术人员专业背景和经验等差异,在遥感专题实施中出现了4个典型问题:①对基准面...

关 键 词:矿产资源潜力评价  坐标系统  异常信息提取  影像拼接  矿产地质特征解译
收稿时间:2010-07-15
修稿时间:2010-09-06

A Preliminary Discussion on Typical Problems in the Remote Sensing Project of Tibetan Mineral Resources Potential Evaluation
NI Zhong-yun,HE Zheng-wei,WU Hua,LIU Ting-ting.A Preliminary Discussion on Typical Problems in the Remote Sensing Project of Tibetan Mineral Resources Potential Evaluation[J].Remote Sensing for Land & Resources,2011,22(1):97-101.
Authors:NI Zhong-yun  HE Zheng-wei  WU Hua  LIU Ting-ting
Institution:1,2(1.State Key Laboratory of Geohazard Prevention & Geoenvironment Protection,Chengdu 610059,China;2.Earth Science,Chengdu University of Technology,Chengdu 610059,China;3.Key Laboratory of Resource Environment and GIS in Beijing,Capital Normal University,Beijing 100037,China;4.Geological Survey of Tibet Autonomous Region,Lhasa 850000,China)
Abstract:The main purpose of the mineral resources potential assessment research based on the remote sensing method in Tibetan region is to extract abnormal remotely sensed information, make several kinds of geological maps,and provide basic maps and data for other cooperating research groups. Four typical problems have appeared in the project because of vast area, multi-temporal remote sensing images,too much software,complex processes and technical differences in technicians’ professional background and experience. The first problem is the incorrect understanding of the datum and map projection and the ignoring of the remote sensing image map projection distortion; the second problem is deleting too much or too little interference information and incomplete spatial topological relations during the anomaly information extraction; the third problem is the inappropriate strategy of remote sensing image mosaicking and color balancing; the fourth problem is low accuracy in the interpretation of geological features of mineral resources. Focused on these four problems,this paper proposed a practical solution which ensures the successful completion of the remote sensing project.
Keywords:Mineral resources potential assessment  Coordinate system  Extraction of anomaly information  Image mosaicking  Interpretation of mineral geological feature
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《国土资源遥感》浏览原始摘要信息
点击此处可从《国土资源遥感》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号