首页 | 本学科首页   官方微博 | 高级检索  
     

矿山地质环境风险管理的多目标决策
引用本文:柴波, 唐朝晖, 李远耀. 2014: 矿山地质环境风险管理的多目标决策. 工程地质学报, 22(s1): 11-18. DOI: 10.13544/j.cnki.jeg.2014.s1.003
作者姓名:柴波  唐朝晖  李远耀
作者单位:1.中国地质大学武汉环境学院 武汉 430074;;2.中国地质大学武汉工程学院 武汉 430074;;3.中国地质大学武汉地质调查研究院 武汉 430074
基金项目:国家自然科学基金项目(编号:41202247),国家矿山地质环境治理专项重点工程项目(广西凤山石灰岩矿山地质环境治理项目)资助
摘    要:矿山地质环境风险决策是一个涉及诸多利益群体的多目标决策问题。为了在矿山开发和关闭中有效地控制地质环境风险,我们提出了由风险在可接受水平内、风险控制工程效益达到最大和矿区规划科学合理3个目标组成的多目标决策问题,并采用层次分析法求解该决策问题。最后,将决策过程用于广西凤山城区内某废弃石灰岩矿山,综合设计单位、政府部门和当地群众的意见后,完成了矿山地质环境治理方案的决策。决策结果认为,采用P1(削坡、清理危岩、坡面锚固)、P2(截水+落石平台拦截+监测)、P3(坡面整形+岩壁雕刻+部分生态恢复)和P4(风险教育)的组合是最优治理方案。研究成果不仅有效地指导了该石灰岩矿山的地质环境治理工程,也对发展矿山关闭理论和风险管理具有重要作用。

关 键 词:矿山地质环境  风险管理  多目标决策  矿山关闭
收稿时间:2014-05-25
修稿时间:2014-07-01

MINE GEO-ENVIRONMENT RISK MANAGEMENT BASED ON MULTIPLE CRITERIA DECISION MAKING
Chai Bo, Tang Zhaohui, Li Yuanyao. 2014: MINE GEO-ENVIRONMENT RISK MANAGEMENT BASED ON MULTIPLE CRITERIA DECISION MAKING. JOURNAL OF ENGINEERING GEOLOGY, 22(s1): 11-18. DOI: 10.13544/j.cnki.jeg.2014.s1.003
Authors:Chai Bo  Tang Zhaohui  Li Yuanyao
Affiliation:1.School of Environmental Studies, China University of Geosciences, Wuhan 430074;;2.Engineering Faculty, China University of Geosciences, Wuhan 430074;;3.Institute of Geological Survey, China University of Geosiences, Wuhan 430074
Abstract:Mine geo-environment risk decision making is a consultation process to meet multiple objects from multi-stakeholder. In order to control mine risk in the mine life cycles, the decision making was employed to approach three objects which were meeting acceptable risk, getting the most benefit from control engineering and making reasonable plan for mine closure. Then, the hierarchical analysis was applied to multiple criteria decision making in risk management of mine geo-environment. Lastly, the consultation process was used to determine the engineering proposal that control the geo-environment risk of a limestone mine in Fengshan, Guangxi. The process considered some information from multi-stakeholder including design organization, government and local people. It indicates that the optimal engineering proposal has four parts, i.e. P1 with cutting slope, clearing up unstable rock and anchoring; P2 with drainage, rockfall platform and monitoring; P3 with smoothing slope surface, carving and vegetation; P4 with risk education. It is not only a guidance to rebuilt environment of the limestone mine, but also has positive affect to develop mine closure.
Keywords:Mine geo-environment  Risk management  Multiple criteria decision making  Mine closure
点击此处可从《工程地质学报》浏览原始摘要信息
点击此处可从《工程地质学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号