北京地铁转弯段施工对近邻桥基的影响研究
引用本文:吴波,刘维宁,索晓明,史玉新.北京地铁转弯段施工对近邻桥基的影响研究[J].岩土力学,2007,28(9):1904-1908.
作者姓名:吴波  刘维宁  索晓明  史玉新
作者单位:1.中铁四局集团有限公司,安徽 合肥 230023;2.北京交通大学 土建学院,北京 100044;3.铁道第三勘察设计院,天津 300142
基金项目:北京市科技计划;铁道第三勘察设计院博士后基金
摘    要:结合北京地铁10号线国贸站转弯段施工对邻近桥基影响的实际工程问题,运用ABAQUS软件,在对施工过程进行动态模拟的同时,重点研究了施工过程中19-1号桥基的变形和受力性态以及桩-土相互作用机制,并将部分计算结果与量测结果进行了比较。研究表明,施工期间桥基没有工程安全隐患,既有的施工方案是合理、可行的,并为该工程的施工提供了依据,也可供类似工程参考。

关 键 词:城市地铁施工  桩-土相互作用  ABAQUS  
文章编号:1000-7598-(2007)09-1904-05
收稿时间:2005-04-25
修稿时间:2005-04-25

Study of effect on pile foundation of Guomao Bridge induced by Guomao Metro Station construction at swerve
WU Bo,LIU Wei-ning,SUO Xiao-ming,SHI Yu-xin.Study of effect on pile foundation of Guomao Bridge induced by Guomao Metro Station construction at swerve[J].Rock and Soil Mechanics,2007,28(9):1904-1908.
Authors:WU Bo  LIU Wei-ning  SUO Xiao-ming  SHI Yu-xin
Institution:1. The Fourth Engineering Group Co., Ltd of China Railway,Hefei 230023, China; 2. School of Civil and Architectural Engineering, Beijing Jiaotong University, Beijing 100044, China; 3. The Third Survey and Design Institute of Railway, Tianjin 300142, China
Abstract:In light of the Guomao Metro Station of Beijing Metro line 10,and using ABAQUS software,the construction process and construction effect on the adjacent pile foundation19-1 of Guomao Bridge are simulated;and the deformation and force character of pile foundation as well as the interaction mechanism of pile-soil are studied.The partial results acquired by simulation and measurement are compared;and a mass of harvest is achieved.The conclusions are reached that pile foundation19-1 of Guomao Bridge is safe during construction;and existing construction;project is reliable.The basis and guidance are provided for succedent Guomao Metro Station and similar engineering construction.
Keywords:ABAQUS