首页 | 本学科首页   官方微博 | 高级检索  
     检索      

大型复杂地质体三维数值模型构建方法比较研究
引用本文:陈庆发,杨家彩,高 远,牛文静,陈大鹏,刘俊广.大型复杂地质体三维数值模型构建方法比较研究[J].岩土力学,2016,37(Z2):753-760.
作者姓名:陈庆发  杨家彩  高 远  牛文静  陈大鹏  刘俊广
作者单位:1. 广西大学 资源与冶金学院,广西 南宁 530004;2. 中南大学 资源与安全工程学院,湖南 长沙 410083; 3. 山东金岭矿业股份有限公司,山东 淄博 255000
基金项目:国家自然科学基金青年科学基金(No. 41402306);广西科学研究与技术开发计划项目(桂科攻1598017-5)。
摘    要:真实地质体三维数值模型构建是进行岩体工程数值分析面临的难题,开展大型复杂地质体三维数值模型构建方法比较研究具有重要意义。以3DMine数字化模型为基础,提出了3DMine-FLAC3D耦合建模方法和3DMine-Surfer-Rhino- ANSYS-FLAC3D多软件耦合建模方法,详细阐述了各建模方法具体步骤,深入分析了各建模方法优缺点及适用性,通过对比各建模方法的优势与短板,取长补短,改进了3DMine-FLAC3D耦合建模方法存在的缺陷,解决了复杂地质体三维数值模型构建难题。以广西铜坑矿锌多金属矿体开采为背景,利用大型复杂地质体三维数值建模方法,构建了锌多金属矿三维数值模型,分析了矿体上行开采地表沉陷规律。研究成果对准确构建大型复杂地质体三维数值模型具有重要指导作用。

关 键 词:复杂地质体  三维数值模型  多软件耦合  三维建模  对比分析  
收稿时间:2014-11-30

Comparative study of construction method for 3D numerical model of large complex geologic body
CHEN Qing-fa,YANG Jia-cai,GAO Yuan,NIU Wen-jing,CHEN Da-peng,LIU Jun-guang.Comparative study of construction method for 3D numerical model of large complex geologic body[J].Rock and Soil Mechanics,2016,37(Z2):753-760.
Authors:CHEN Qing-fa  YANG Jia-cai  GAO Yuan  NIU Wen-jing  CHEN Da-peng  LIU Jun-guang
Institution:1. College of Resources and Metallurgy, Guangxi University, Nanning, Guangxi 530004, China; 2. School of Resources and Safety Engineering, Central South University, Changsha, Hunan 410083, China; 3. Shandong Jinling Mining Limited Liability Company, Zibo, Shandong 25509, China
Abstract:3D numerical model construction of real geological body is the challenge faced by numerical analysis in rock mass engineering, resulting in that the comparative study between different constructing methods of 3D numerical models of large and complex geological body has great significance. Based on 3DMine digital model, the coupling modeling methods of 3DMine-FLAC3D and 3DMine-Surfer-Rhino-ANSYS-FLAC3D are put forward; and then the concrete steps of every modeling method are described in detail. Besides, the advantages, disadvantages and applicability of every modeling method are further analyzed. Through contrasting the advantages and short boards between each modeling method and learning from each other, the defects that exist in coupling modeling method of 3DMine-FLAC3D are improved; and the constructing problem of 3D numerical model of complex geologic body is solved as well. With the background of zinc-polymetallic ore body in Guangxi Tongkeng Mine, the 3D numerical modeling method of large and complex geologic body is utilized to construct the 3D numerical model of zinc-polymetallic mine and analyze the surface subsidence law for ascending mining. Research achievements play an important guiding role in accurately constructing the 3D numerical model of large and complex geological body.
Keywords:complex geologic body  3D numerical model  multiple software coupling  3D modeling  comparative analysis  
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号