首页 | 本学科首页   官方微博 | 高级检索  
     检索      

宝钢轧机旋流池深基坑的监测分析
引用本文:边亦海,黄宏伟,张冬梅.宝钢轧机旋流池深基坑的监测分析[J].岩土力学,2004,25(Z2):491-495.
作者姓名:边亦海  黄宏伟  张冬梅
作者单位:同济大学,地下建筑与工程系,上海,200092
摘    要:介绍了宝钢一个采用半逆作法施工深基坑的现场监测实例.通过对地下连续墙侧向位移、孔隙水压力、土压力、钢筋应力及坑底隆起等监测结果的分析,得出一些有价值的结论,可以为类似工程的设计、施工和监测提供一些借鉴.

关 键 词:深基坑  地下连续墙  监测
文章编号:1000-7598-(2004)增-0491-05
修稿时间:2004年4月26日

Monitoring and analysis of deep excavation in whirlpool of Baogang rolling mill
Bian Yi-hai,Huang Hong-wei,Zhang Dong-mei.Monitoring and analysis of deep excavation in whirlpool of Baogang rolling mill[J].Rock and Soil Mechanics,2004,25(Z2):491-495.
Authors:Bian Yi-hai  Huang Hong-wei  Zhang Dong-mei
Abstract:A deep excavation in Bao gang, with semi-top-down construction method, is proposed. Some useful conclusions are drawn through the analysis of the measured results including displacement of diaphragm wall, pore water pressure, earth pressure, steel stress and bottom heave . It is useful for design, construction and monitoring of similar engineering.
Keywords:deep excavation  diaphragm wall  monitoring
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号