首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Analysis of structure calculations for branch pipes subject to high hydraulic pressures of Huizhou pumped storage station
Authors:ZHENG Jing-xing
Institution:Guangdong Investigation Design and Eesearch Institute of Water Conservancy & Electric Power, Guangzhou 510170, China
Abstract:The reinforced concrete branch pipe subject to high hydraulic pressures of Huizhou storage pumped station, because of its PD value exceeding 6000, complex structure form, complex hydrological geology and engineering geology, is the key and formidable problem of the project. Based on permeable tunnel design theory, the followings are computed separately: the branch pipe excavation country rock crustal stress field in the construction period; the steady seepage of high pressure branch pipe, the concrete line’s stress-strain and country rock safety in the operation period; the concrete line’s stress and strain in the emptying inspection period of high pressure branches. The high pressure branch’s reinforce steel is also computed.
Keywords:permeable tunnel  concrete branch pipe  high pressure water  Huizhou pumped storage station  
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号