首页 | 本学科首页   官方微博 | 高级检索  
     检索      

库岸堤防工程基础开挖的爆破振动规律研究
引用本文:胡国忠,王宏图,李晓红,贾剑青,李开学,庞 成.库岸堤防工程基础开挖的爆破振动规律研究[J].岩土力学,2006,27(Z1):1036-1040.
作者姓名:胡国忠  王宏图  李晓红  贾剑青  李开学  庞 成
作者单位:重庆大学 西南资源开发及环境灾害控制工程教育部重点实验室,重庆 400044
基金项目:国家自然科学基金重点项目(No.50334060);国家自然科学基金资助项目(No.50474025);国家重点基础研究发展规划(973)项目(No.2005CB221502);教育部“春晖计划”项目;重庆大学大学生创新基金资助项目。
摘    要:以三峡堤防工程基础开挖为研究对象,对堤防工程基础开挖爆破地震波的振动监测方法和监测物理量的选择进行了研究。通过对爆破振动监测结果的回归分析,确立了爆破振动速度的传播衰减规律。结合工程实际,对基础开挖爆破产生的地震波的振动频率与爆区周围建(构)筑物的自振频率进行了对比分析;经对比分析,此次开挖工程爆破引起的振动频率远大于周围民房结构的自振频率,从而保证了周围建(构)筑物的安全。同时,结合该堤防工程开挖爆破施工,从建(构)筑物的安全振动速度和爆破振动的安全距离两个方面确定了爆破振动安全控制建议标准。研究分析表明,本次爆破工程的振动速度和安全距离都在爆破振动安全控制标准的范围内,从而说明了本次爆破工程圆满安全地完成了施工任务,保证了爆破时周边建(构)筑物的安全;其研究对指导基础开挖爆破施工和保证地面建筑物安全起到了重要作用。

关 键 词:基础开挖  爆破振动  衰减规律  安全控制标准  
收稿时间:2006-06-28

Research on blasting vibration regularity of bedrock digging of embankment project
HU Guo-zhong,WANG Hong-tu,LI Xiao-hong,LI Kai-xue,PANG Chen.Research on blasting vibration regularity of bedrock digging of embankment project[J].Rock and Soil Mechanics,2006,27(Z1):1036-1040.
Authors:HU Guo-zhong  WANG Hong-tu  LI Xiao-hong  LI Kai-xue  PANG Chen
Institution:Key Lab for the Exploitation of Southwestern Resources & the Environmental Hazard Control Engineering, Chongqing University, Chongqing 400044, China
Abstract:Based on bedrock digging of embankment project in the Three Gorges Proiject, the choice of measurement method and object of vibration by blasting earthquake wave induced by bedrock digging of embankment project were studied. Via regression analysis of the results of measurement on blasting vibration, the spread and attenuation regularity of vibration velocity of blasting were established. Combined the project, the vibration frequency of earthquake wave induced by blasting of bedrock digging and the vibration frequencies of surrounding buildings in blasting zone were contrasted and analyzed. After analyzing, the vibration frequency by blasting of this digging project was far bigger than the itself vibration frequency of structure of surrounding civilian house; consequently the safety of surrounding buildings were assured. At the same time, integrated the digging blasting construction of embankment project, the safety control standard of blasting vibration by this blasting engineering was confirmed from the two aspects such as safety vibration velocity of buildings and safety distance of blasting vibration; consequently, it is shown that the construction task of this blasting project were done safely; and the safety of surrounding buildings were assured while blasting was on. This research has played an important role in coaching blasting construction of bedrock digging and assuring the safety of ground buildings.
Keywords:bedrock digging  blasting vibration  attenuation regularity  safety control standard  
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号