首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Application of concrete cut-off wall to reinforcement of earth-rock dam
Authors:LI Jing-long  LI Shu-cai  WANG Gang  LI Jia-chun  YU Feng
Institution:1. Geotechnical and Structural Engineering Research Center, Shandong University, Jinan 250061, China; 2. Tianqin Realty Co. , Jinan 250012, China;3. Shandong Provincial Investigation and Design Institute, Jinan 250061, China
Abstract:The concrete cutoff wall is a technology used in reinforcing sick dams more usually in recent years. The advanced FLAC3D method which is based on 3-D explicit finite difference method, is used to simulate the effect and working state of earth-rock dam reinforced by concrete cutoff wall. At the meantime, the differences in the stress and strain etc. between the rigid and plastic cut-off wall are also researched; and then that provides the reference to the use and development of this technology.
Keywords:concrete cutoff wall  earth-rock dam  reinforcement  numerical analysis  
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号