首页 | 本学科首页   官方微博 | 高级检索  
     

上部基坑施工对软土地铁隧道变形监测与分析
引用本文:祝宜龙,白文波. 上部基坑施工对软土地铁隧道变形监测与分析[J]. 上海国土资源, 2007, 0(4): 10-13
作者姓名:祝宜龙  白文波
作者单位:上海京海工程技术公司,上海,201206;上海京海工程技术公司,上海,201206
摘    要:新金桥广场基坑围护结构位于正在运营的地铁隧道顶部。通过有效的隧道结构变形监控指导施工使其对地铁隧道的影响控制在允许范围内,对这一成功经验进行总结,以供今后工作参考。

关 键 词:地铁  基坑  隧道结构  变形监测
收稿时间:2007-03-19
修稿时间:2007-03-19

Monitoring and Analysis of Tunnel Structure on Construction of Foundation pit above operating Metro Tunnel insoft soil ground
ZHU Yilong,BAI Wenbo. Monitoring and Analysis of Tunnel Structure on Construction of Foundation pit above operating Metro Tunnel insoft soil ground[J]. Shanghai Land & Resource, 2007, 0(4): 10-13
Authors:ZHU Yilong  BAI Wenbo
Abstract:Xin Jinqiao square pit was on the top of an operating subway tunnel.The effects of construction to the exist tunnel was monitored and the results were used to lead the construction process through controlling displacement in an accepted range.The success experience was summarized.
Keywords:subway  pit  tunnel structure  deformation monitoring of tunnel structure
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号