首页 | 本学科首页   官方微博 | 高级检索  
     检索      


DEFORMATION AND ROUGHNESS CHANGES OF THE MAIN CHANNEL AND FLOODPLAIN IN FLOOD EVENTS (CASE STUDY )
Authors:MAO Shimin  ProfSenior Engineer  Anhui and Huaihe River Water Resources Research Institute  Zhihuai Road  Bengbu  China JIN Zhengyue Engineer  Anhui and Huaihe River Water Resources Research Institute  Zhihuai Road  Bengbu  China ZHAN Yangzu Seni
Institution:MAO Shimin,Prof.Senior Engineer,Anhui and Huaihe River Water Resources Research Institute,Zhihuai Road 771,Bengbu,China JIN Zhengyue Engineer,Anhui and Huaihe River Water Resources Research Institute,Zhihuai Road 771,Bengbu,China ZHAN Yangzu Seni
Abstract:This paper presents an analysis of the data measured at stations along the middle reaches of the Huaihe River in the early 1950s. Its results show that the river bed changed dynamically during a flood process and the variation of the channel cross-section area could be as large as 600-700 m 2, which is 20 to 25 percentage of the cross sectional area of the main channel at bankfull stage. Moreover the channel roughness increased or decreased with erosion or deposition. In case of bed erosion, the effect of roughness change on discharge capacity was evaluated sometimes greater than that of cross-section area change. From a flood control point of view, the roughness near the peak of a flood process characterized by erosion should be given special attention.
Keywords:The Huaihe River  The channel bed deformation  Morphological process  roughness
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号