首页 | 本学科首页   官方微博 | 高级检索  
     

云南泸西县云鹏水电站坝基基础工程处理
引用本文:马云. 云南泸西县云鹏水电站坝基基础工程处理[J]. 云南地质, 2007, 26(2): 249-252
作者姓名:马云
作者单位:云南国土建设工程公司玉溪分公司,云南,玉溪,653100
摘    要:大坝基础帷幕灌浆工程中采用新技术、新工艺,使工程质量大幅提高,也使这些新技也能在实践中得到发展和完善,为工程良好的质量和效益打下了坚实的基础。

关 键 词:基础帷幕灌浆  自上而下循环  自动灌浆记录  云鹏水电站  泸西 云南
文章编号:1004-1885(2007)02--
收稿时间:2006-11-08
修稿时间:2006-11-08

THE PROCESSING ENGINEERING OF DAM BASE OF YUNPENG HYDROPOWER STATION OF LUXI, YUNNAN
MA Yun. THE PROCESSING ENGINEERING OF DAM BASE OF YUNPENG HYDROPOWER STATION OF LUXI, YUNNAN[J]. Yunnan Geology, 2007, 26(2): 249-252
Authors:MA Yun
Affiliation:Yuxi Branch, Yunnan Company of Land Construction Engineering (Ltd
Abstract:In the curtain grouting engineering of dam base, the new technology was used, which not only evidently improved the quality of engineering, but also developed the new technology in the practice. It has laid a solid foundation of the good quality and benefit of engineering.
Keywords:Curtain Grouting of Base    Small - Hole Diamond Drilling   Closed Hole    Unplug   Not Waiting -Consolidation   Circulation Grouting Downwards   Automatic Grouting Recorder   Computerized Collection and Sort Out the Data
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号