首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于人工神经网络的三峡库区丰都县水库塌岸预测
引用本文:张文春,陈剑平,张丽.基于人工神经网络的三峡库区丰都县水库塌岸预测[J].吉林大学学报(地球科学版),2010,40(2):378-382.
作者姓名:张文春  陈剑平  张丽
作者单位:1.吉林大学 建设工程学院,长春 130026;2.吉林建筑工程学院 测绘与勘查工程学院,长春 130021
基金项目:国家自然科学基金项目 
摘    要:为了建立一个适合于三峡库区的塌岸预测方法体系,采用具有处理非线性关系功能的人工神经网络方法对水库塌岸问题进行研究。通过训练、学习和仿真,获得预测正确率为97.2%的具有7-32-14网络结构的BP神经网络模型,采用该模型对蓄水位为175 m时丰都县各岸段进行塌岸预测,并将预测结果与传统经验公式计算法所得结果及实际监测数据进行对比。结果表明:基于人工神经网络的塌岸预测宽度与实际监测数据很接近,偏差在5 m以内;公式法计算结果与监测值平均偏差为15.9 m,而且对于部分坡段,公式法计算结果比实际监测值小8~11 m,没能预测出塌岸的真正范围。采用神经网络模型对丰都县水库进行塌岸预测,预测结果与实际监测数据平均偏差约3.8%,表明其预测结果可靠。

关 键 词:三峡水库  塌岸预测  非线性  神经网路  
收稿时间:2009-09-02

Reservoir Bank Collapse Prediction of Fengdu Couty in Reservoir Area of Three Gorges Based on Artificial Neural Network
ZHANG Wen-chun,CHEN Jian-ping,ZHANG Li.Reservoir Bank Collapse Prediction of Fengdu Couty in Reservoir Area of Three Gorges Based on Artificial Neural Network[J].Journal of Jilin Unviersity:Earth Science Edition,2010,40(2):378-382.
Authors:ZHANG Wen-chun  CHEN Jian-ping  ZHANG Li
Institution:1.College of Constrnction Engineering|Jilin University|Changchun 130026|China;
2.School of Surveying and Prospecting Engineering,Jilin Institute of Architecture and Civil Engineering,Changchun 130021,China
Abstract:In order to establish an appropriate methodology of bank collapse prediction in the Three Gorges reservoir area, the article applied the artificial neural network method to study the bank collapse prediction. The method has the function of disposing the nonlinear relation. Through training, learning and simulation, it obtained the BP neural network model with a 7-32-14 network structure, and the correct prediction rate of it was 97.2%. Then  the model was used to forecast the reservoir bank collapse of Fengdu county when the water level was 175 m. Compared the forecast results with the traditional empirical formula calculation and the actual monitor data. The comparative results showed that the bank collapse prediction based on artificial neural network were very similar to the monitor data, and the deviation was less than 5 m. The average deviation of the formula calculation results and the monitor data was 15.9 m. For part of the slope sections, the formula calculation results were 8-11 meters,which was less than the actual monitor data. It failed to predict the true scope of bank collapse. In short, the average deviation of the bank collapse prediction results using artificial neural networks is about 3.8%. It is reliable and has higher precision.
Keywords:Three Gorges reservoir  bank collapse prediction  non-liner  neural networks  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《吉林大学学报(地球科学版)》浏览原始摘要信息
点击此处可从《吉林大学学报(地球科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号