首页 | 本学科首页   官方微博 | 高级检索  
     检索      

北京朝阳广场深基坑支护技术
引用本文:刘兴旺,周葛源.北京朝阳广场深基坑支护技术[J].探矿工程,2006,33(10):8-13.
作者姓名:刘兴旺  周葛源
作者单位:[1]北京市机械施工有限公司,北京100045 [2]江西省地质矿产勘查开发局902探矿工程大队,江西新余338000
摘    要:北京朝阳广场深基坑支护设计尝试采用上部复合土钉墙,下部桩加预应力锚杆的支护形式。上部复合土钉墙较桩锚支护节约成本。土钉墙设计中第三道土钉替换为预应力土钉,有效地限制了土钉墙顶部位移。土钉墙顶面及桩顶连梁上布置变形监测点,采用量距法及经纬仪挑直线的测量方法进行变形监测,实测变形的数据均在规范允许范围内。

关 键 词:深基坑支护  复合土钉墙  预应力锚杆  钢腰梁  护坡桩  支护结构设计  变形监测
收稿时间:2006/8/11 0:00:00
修稿时间:2006/8/11 0:00:00

Bracing of Deep Foundation Pit Applied in Chaoyang Square Construction Project
LIU Xing-wang,ZHOU Geyuan.Bracing of Deep Foundation Pit Applied in Chaoyang Square Construction Project[J].Exploration Engineering(Drilling & Tunneling),2006,33(10):8-13.
Authors:LIU Xing-wang  ZHOU Geyuan
Abstract:The article introduces the application of bracing of deep foundation pit in Chaoyang Square. The compound soil nailed wall and pre-stressed anchor rod was adopted for the upside and underside wall separately. Soil nailed wall was economical. And in the design, the third layer of soil nail wall was replaced with pre-stressed soil nail to effectively restrict the displacement of the top of soil nailed wall. Monitoring spot was laid on the top of soil nailed wall and the top of pile to measure distortion with theodolite, and all the data measured is in permitted scope of criterion.
Keywords:bracing of deep foundation pit  compound soil nailed wall  pre-stressed anchor rod  steel beam  slope-shoringpile  shoring structure design  deformation monitoring
点击此处可从《探矿工程》浏览原始摘要信息
点击此处可从《探矿工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号