预应力管桩在汕头地区施工中几个问题的探讨
引用本文:林志文. 预应力管桩在汕头地区施工中几个问题的探讨[J]. 探矿工程, 2007, 34(2): 13-15
作者姓名:林志文
作者单位:广东省地勘局722地质大队,广东汕头515021
摘    要:通过对汕头地区预应力管桩历年来的施工实例资料分析,根据汕头地区工程地质条件的特点和实践经验,对预应力管桩的设计、施工提出几点探讨性意见。

关 键 词:汕头地区 预应力管桩 桩侧摩阻力 桩端阻力 极限承载力 贯入度 终压值
收稿时间:2006-12-07
修稿时间:2006-12-07

Study on Application of Pre-stressed Tubular Pile in Shantou District
LIN Zhi-wen. Study on Application of Pre-stressed Tubular Pile in Shantou District[J]. Exploration Engineering:Rock & Soil Drilling and Tunneling, 2007, 34(2): 13-15
Authors:LIN Zhi-wen
Abstract:Based on the case analysis on pre-stressed tubular pile construction in Shantou district in these years, according to the characters of engineering geological condition and working experience, some discussion on design and construction of pre-stressed tubular pile are made.
Keywords:Shantou district   pre-stressed tubular pile   skin friction of pile   pile end resistance   ultimate bearing capacity   penetration    stop pressing value