地基下沉倾斜危楼双向顶升纠偏实践
引用本文:陈国政 陈守平 陈守安. 地基下沉倾斜危楼双向顶升纠偏实践[J]. 探矿工程, 2007, 34(2): 4-9
作者姓名:陈国政 陈守平 陈守安
作者单位:中国有色金属工业西安勘察院基础托换工程公司,陕西西安710054
摘    要:某3层砖混结构楼房,因地基下沉且不稳定导致向南东倾斜成为危房,经采用静压桩托换地基加固补强控制地基稳定后,进行双向顶升纠偏设计、施工与试验,通过成果分析治理是成功的。介绍了纠偏设计与施工技术。

关 键 词:危楼 静压桩托换 地基加固 顶升纠偏
收稿时间:2006-06-30
修稿时间:2006-06-30

Application of Two-direction Rectification of Deviation by Jack-up for Dangerous Inclining Building with Foundation Subsidence
CHEN Guo-zheng,CHEN Shou-ping,CHEN Shou-an. Application of Two-direction Rectification of Deviation by Jack-up for Dangerous Inclining Building with Foundation Subsidence[J]. Exploration Engineering:Rock & Soil Drilling and Tunneling, 2007, 34(2): 4-9
Authors:CHEN Guo-zheng  CHEN Shou-ping  CHEN Shou-an
Abstract:Because of the ground subsidence, a 3-storeyed masonry-concrete building became dangerous with southeast inclination. Static pressure pile underpinning was used to reinforce the foundation. After consolidation, the design, construction and test of two-direction rectification by jack-up were made, and it was proved successful. The design and construction of rectification of deviation were introduced.
Keywords:dangerous building   static pressure pile underpinning   ground reinforcement   rectification of deviation by jack-up