钻孔灌注桩压浆后承载性能的可靠度分析
引用本文:黄生根,沈佳虹,李萌.钻孔灌注桩压浆后承载性能的可靠度分析[J].岩土力学,2019,40(5):1977-1982.
作者姓名:黄生根  沈佳虹  李萌
作者单位:中国地质大学(武汉)工程学院,湖北 武汉430074
摘    要:钻孔灌注桩在压浆后的承载特性得到明显改善,离散程度明显降低,但目前对压浆后钻孔灌注桩的可靠度还缺乏系统研究。收集了122根未压浆的钻孔灌注桩和147根压浆后的钻孔灌注桩静载试验资料,结合可靠度分析方法中的确定性和不确定性分析方法,利用近似概率法的基于一次二阶矩法的验算点法(简称JC法)和Monte Carlo法对钻孔灌注桩压浆前和压浆后的可靠度指标进行了对比分析。结果表明:压浆后桩的可靠度指标有很大幅度提高,压浆可减少持力层对可靠度的影响,同时后压浆桩的可靠度有随桩径增大而提高的趋势,且不同荷载效应比值下可靠度随桩径变化的趋势趋于一致。

关 键 词:钻孔灌注桩  后压浆  可靠度  JC法  Monte  Carlo法  
收稿时间:2018-03-08

Reliability analysis of bearing capacity of post-grouted bored piles
HUANG Sheng-gen,SHEN Jia-hong,LI Meng.Reliability analysis of bearing capacity of post-grouted bored piles[J].Rock and Soil Mechanics,2019,40(5):1977-1982.
Authors:HUANG Sheng-gen  SHEN Jia-hong  LI Meng
Institution:Faculty of Engineering, China University of Geosciences, Wuhan, Hubei 430074, China
Abstract:The bearing capacity of bored piles is significantly improved and the dispersion of bearing capacity is reduced obviously by employing the method of grouting. However, the reliability of post-grouted bored piles is still lack of systematic research yet. In this study, the static load test data of 122 non-grouted bored piles and 147 post-grouted bored piles are collected. Then, combined with the certainty and uncertainty analysis methods in reliability analysis method, the approximate probability method based on the first-order second-moment method (JC method) and Monte Carlo method is employed to analyze the reliability indexes of these forementioned post-grouted bored piles and non-grouted ones.. The results indicate that the reliability index of post-grouting bored piles have been greatly improved compared to the non-grouting ones and the bearing stratum has less influence on the reliability of post-grouted bored piles than the reliability of non-grouted bored piles. Moreover, the reliability of post-grouted bored piles tends to increase with the increase of pile diameter and this trend between reliability and diameter remains consistent even under different load compositions.
Keywords:bored piles  post grouting  reliability  JC method  Monte Carlo method  