Reconstructions of ancient delta systems rely typically on a two-dimensional (2D) view of prograding clinothems but may miss their three-dimensional (3D) stratigraphic complexity which can, instead, be best documented on modern delta systems by integrating high-resolution geophysical data, historical cartography, core data and geomorphological reconstructions offshore. We quantitatively compare three precisely positioned, high-resolution multi-beam bathymetry maps in the delta front and pro delta sectors (0.3 to 10 m water depth) of Po di Pila, the most active of the modern Po Delta five branches. By investigating the detailed morphology of the prograding modern Po Delta, we shed new light on the mechanisms that control the topset to foreset transition in clinothems and show the temporal and spatial complexity of a delta and its pro delta slope, under the impact of oceanographic processes. This study documents the ephemeral nature of the rollover point at the transition between sandy topset (fluvial, delta plain to mouth-bar) and muddy seaward-dipping foreset deposits advancing, in this case, in >20 m of water depth. Three multibeam surveys, acquired between 2013 and 2016, document the complexity in space and time of the topset and foreset regions and their related morphology, a diagnostic feature that could not be appreciated using solely 2D, even very high-resolution, seismic profiles. In addition, the comparison of bathymetric surveys gathered with one-year lapses shows the migration of subaqueous sand dunes on the clinothem topset, the formation of ephemeral cut-and-fill features at the rollover point (few m below mean sea level), the presence of collapse depressions derived by sagging of sediments and fluid expulsion (possibly induced by storm waves) on the foreset, and splays of sand likely reflecting gravity flows on the lower foreset. Though the modern Po Delta is anthropogenic in many respects, its subaqueous clinothem can be studied as a scale model for ancient clinothems that are less resolved geometrically and far less constrained chronologically. 相似文献
In many arid ecosystems, vegetation frequently occurs in high-cover patches interspersed in a matrix of low plant cover. However, theoretical explanations for shrub patch pattern dynamics along climate gradients remain unclear on a large scale. This context aimed to assess the variance of the Reaumuria soongorica patch structure along the precipitation gradient and the factors that affect patch structure formation in the middle and lower Heihe River Basin (HRB). Field investigations on vegetation patterns and heterogeneity in soil properties were conducted during 2014 and 2015. The results showed that patch height, size and plant-to-patch distance were smaller in high precipitation habitats than in low precipitation sites. Climate, soil and vegetation explained 82.5% of the variance in patch structure. Spatially, R. soongorica shifted from a clumped to a random pattern on the landscape towards the MAP gradient, and heterogeneity in the surface soil properties (the ratio of biological soil crust (BSC) to bare gravels (BG)) determined the R. soongorica population distribution pattern in the middle and lower HRB. A conceptual model, which integrated water availability and plant facilitation and competition effects, was revealed that R. soongorica changed from a flexible water use strategy in high precipitation regions to a consistent water use strategy in low precipitation areas. Our study provides a comprehensive quantification of the variance in shrub patch structure along a precipitation gradient and may improve our understanding of vegetation pattern dynamics in the Gobi Desert under future climate change.
The Three Gorges Project is the world's largest water conservancy project. According to the design standards for the 1,000‐year flood, flood diversion areas in the Jingjiang reach of the Yangtze River must be utilized to ensure the safety of the Jingjiang area and the city of Wuhan. However, once these areas are used, the economic and life loss in these areas may be very great. Therefore, it is vital to reduce this loss by developing a scheme that reduces the use of the flood diversion areas through flood regulation by the Three Gorges Reservoir (TGR), under the premise of ensuring the safety of the Three Gorges Dam. For a 1,000‐year flood on the basis of a highly destructive flood in 1954, this paper evaluates scheduling schemes in which flood diversion areas are or are not used. The schemes are simulated based on 2.5‐m resolution reservoir topography and an optimized model of dynamic capacity flood regulation. The simulation results show the following. (a) In accord with the normal flood‐control regulation discharge, the maximum water level above the dam should be not more than 175 m, which ensures the safety of the dam and reservoir area. However, it is necessary to utilize the flood diversion areas within the Jingjiang area, and flood discharge can reach 2.81 billion m3. (b) In the case of relying on the TGR to impound floodwaters independently rather than using the flood diversion areas, the maximum water level above the dam reaches 177.35 m, which is less than the flood check level of 180.4 m to ensure the safety of the Three Gorges Dam. The average increase of the TGR water level in the Chongqing area is not more than 0.11 m, which indicates no significant effect on the upstream reservoir area. Comparing the various scheduling schemes, when the flood diversion areas are not used, it is believed that the TGR can execute safe flood control for a 1,000‐year flood, thereby greatly reducing flood damage. 相似文献