首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 281 毫秒
1.
分期设计洪水频率与防洪标准关系研究   总被引:16,自引:4,他引:12       下载免费PDF全文
现行分期设计洪水模式估算的分期设计洪水值均小于或等于年最大设计值,达不到规定的防洪标准。采用Gumbel-Hougaard Copula函数描述两个分期的分期最大洪水之间的相关性结构,并构造边缘分布为P-Ⅲ分布的分期最大洪水联合分布,建立分期最大洪水与年最大洪水的关系式,讨论分期设计洪水频率与防洪标准应满足的关系,探讨能够满足防洪标准的新的分期设计洪水模式。应用示例表明,新模式主汛期设计值相对年最大设计值小幅度增加,而非主汛期设计值则小于年最大设计值,既满足不降低防洪标准的要求又能够起到优化设计洪水的作用,为分期设计洪水研究提供了一条新的思路。  相似文献   

2.
讨论了洪水对洪泛区或滞蓄洪区中非防洪工程建设项目影响评价方法,包括洪灾直接经济损失和间接经济损失的估算方法,洪灾发生时含有有毒物质的非防洪工程建设项目对环境的影响,以及对地下水的污染等影响评价方法.这些方法是洪水对非防洪工程建设项目影响评价的核心,也是整个影响评价的重点和难点所在.这些方法可为制定洪水对洪泛区非防洪工程建设项目影响评价指南或规范提供科学依据.  相似文献   

3.
The disign of flood warning — flood response systems is often performed as part of the overall engineering analysis of flood damage mitigation schemes. However, an important part of the flood response component of such systems is human perception of the flood hazard and its implication for the responses undertaken. This human dimension is examined from three viewpoints, the perception of the flood, the issues in the warning dissemination process, and the implications for the actions undertaken by individual flood plain occupants in response to a warning. Evidence is provided to show how the human characteristics of the flood plain occupants can signigicantly affect the benefits derived from a flood warning — flood response system. The importance of these non-engineering aspects of the problem leads to recommendations for closer collaboration between traditional technical experts and social scientists. The cooperation should extend beyond the assessment of the reduction in flood damages expected from a particular flood warning scheme into actual design of the dissemination process and response mechanisms.  相似文献   

4.
Flooding is widely believed to be the most common natural disaster in Europe, and the changing climatic conditions are estimated to increase its adverse impacts. Effective flood strategies require thorough consideration of the factors underlying the flood generation mechanism and a widened display of mitigation priorities for spatially exhaustive assessments. Flood potential maps generated herein for indicating potential flood areas prove to be among powerful tools for comprehensive flood assessments. In the presented study, a countrywide characterization is achieved in this context by analyzing catchment units, which constitute the river basin systems in Turkey, through a series of spatial indices adapted from different factors effective in flood generation. The study aims to contribute to depicting priorities for in-depth flood assessments and to the re-orientation of subsequent control measures. The flood potential maps obtained for river catchments and designating individual locations with comparably higher flood potentials are expected to set light to the selection of case studies for local flood research in Turkey while contributing to decision making and policy implementation on flood control at the macroscale.  相似文献   

5.
Flooding is a serious hazard across Europe, with over 200 major floods documented in the last two decades. Over this period, flood management has evolved, with a greater responsibility now placed on at-risk communities to understand their risk and take protective action to develop flood resilience. Consequently, communicating flood risk has become an increasingly central part of developing flood resilience. However, research suggests that current risk communications have not resulted in the intended increase in awareness, or behavioural change. This paper explores how current risk communications are used by those at risk, what information users desire and how best this should be presented. We explore these questions through a multi-method participatory experiment, working together with a competency group of local participants in the town of Corbridge, Northumberland, the UK. Our research demonstrates that current risk communications fail to meet user needs for information in the period before a flood event, leaving users unsure of what will happen, or how best to respond. We show that participants want information on when and how a flooding may occur (flood dynamics), so that they can understand their risk and feel in control of their decisions on how to respond. We also present four prototypes which translate these information needs into new approaches to communicating flood risk. Developed by the research participants, these proposals meet their information needs, increase their flood literacy and develop their response capacity. The findings of the research have implications for how we design and develop future flood communications, but also for how we envisage the role of flood communications in developing resilience at a community level.  相似文献   

6.
A miniature, 9 m-wide floodplain, developed along a gravel-washing effluent stream, shows features such as levées, crevasse splays and floodbasins which compare with their larger-scale counterparts. For sediments deposited overbank, median size decreases exponentially with distance from the channel whilst sorting increases, with coarser sediment on the outside of a meander bend. Overbank flows are only a few grain diameters in depth near the channel. This study shows potentially useful systematic relationships in floodplain sediment textures, but it involves only one of a possible variety of floodplain types dominated by overbank sedimentation. This suggests that further exploration of overbank depositional processes is desirable as an aid to field interpretation.  相似文献   

7.
Vulnerability assessment of an urban flood in Nigeria: Abeokuta flood 2007   总被引:1,自引:0,他引:1  
The paper presents the result of a vulnerability assessment of urban dwellers to a major flood hazard in Abeokuta, southwestern Nigeria in July 2007. This was achieved by means of questionnaire survey administered to 248 flood area residents. Flood vulnerability was assessed by examining exposure, susceptibility, and coping indicators in the study area. Findings of the study show that although about 50% of respondents had experienced floods, in Abeokuta or elsewhere in the past, majority (66%) did not anticipate a flood event of such magnitude to occur despite its location on a flood plain and, therefore, were unprepared for such hazard. Pre-warning of the flood event was generally lacking among flood area residents as only 8% of respondents indicated pre-warning, which was based on personal observations. Response to the flood hazard was mainly reactive for both private and public agents as flood risk reduction measures were not in place.  相似文献   

8.
《Comptes Rendus Geoscience》2005,337(1-2):203-217
Advances in flood forecasting have been constrained by the difficulty of estimating rainfall continuously over space, for catchment-, national- and continental-scale areas. This has had a concomitant impact on the choice of appropriate model formulations for given flood-forecasting applications. Whilst weather radar used in combination with raingauges – and extended to utilise satellite remote-sensing and numerical weather prediction models – have offered the prospect of progress, there have been significant problems to be overcome. These problems have curtailed the development and adoption of more complete distributed model formulations that aim to increase forecast accuracy. Advanced systems for weather radar display and processing, and for flood forecast construction, are now available to ease the task of implementation. Applications requiring complex networks of models to make forecasts at many locations can be undertaken without new code development and be readily revised to take account of changing requirements. These systems make use of forecast-updating procedures that assimilate data from telemetry networks to improve flood forecast performance, at the same time coping with the possibility of data loss. Flood forecasting systems that integrate rainfall monitoring and forecasting with flood forecasting and warning are now operational in many areas. Present practice in flood modelling and forecast updating is outlined from a UK perspective. Challenges for improvement are identified, particularly against a background of greater access to spatial datasets on terrain, soils, geology, land-cover, and weather variables. Representing the effective runoff production and translation processes operating at a given grid or catchment scale may prove key to improved flood simulation, and robust application to ungauged basins through physics-based linkages with these spatial datasets. The need to embrace uncertainty in flood-warning decision-making is seen as a major challenge for the future. To cite this article: R.J. Moore et al., C. R. Geoscience 337 (2005).  相似文献   

9.
Natural Hazards - The effective communication of flood risk offers the opportunity to ensure communities can adapt and respond appropriately to changing local conditions. At a time of diminishing...  相似文献   

10.
Debris flows, debris floods and floods in mountainous areas are responsible for loss of life and damage to infrastructure, making it important to recognize these hazards in the early stage of planning land developments. Detailed terrain information is seldom available and basic watershed morphometrics must be used for hazard identification. An existing model uses watershed area and relief (the Melton ratio) to differentiate watersheds prone to flooding from those subject to debris flows and debris floods. However, the hazards related to debris flows and debris floods are not the same, requiring further differentiation. Here, we demonstrate that a model using watershed length combined with the Melton ratio can be used to differentiate debris-flow and debris-flood prone watersheds. This model was tested on 65 alluvial and colluvial fans in west central British Columbia, Canada, that were examined in the field. The model correctly identified 92% of the debris-flow, 83% of the debris-flood, and 88% of the flood watersheds. With adaptation for different regional conditions, the use of basic watershed morphometrics could assist land managers, scientists, and engineers with the identification of hydrogeomorphic hazards on fans elsewhere.  相似文献   

11.
Shin  Euntaek  Kim  Hyung-Jun  Rhee  Dong Sop  Eom  Taesoo  Song  Chang Geun 《Natural Hazards》2021,109(2):1539-1555
Natural Hazards - Underground space is becoming increasingly vulnerable to inundation owing to the enhanced likelihood and consequences of urban flooding. However, previous studies on flooding of...  相似文献   

12.
Feng  Boyu  Zhang  Ying  Bourke  Robin 《Natural Hazards》2021,106(1):613-627
Natural Hazards - Urbanization increases regional impervious surface area, which generally reduces hydrologic response time and therefore increases flood risk. The objective of this work is to...  相似文献   

13.
蓄滞洪区的行蓄洪启用频率和蓄水方式决定着洪水管理与可持续发展途径,影响流域经济社会的可持续发展.根据各大流域蓄滞洪区的设计启用频率,设置了未来35年内蓄滞洪区发展的3种情景:维持现状、部分水库化和部分湿地化,构建了涵盖防洪、社会经济和生态发展等因子的途径选择指标体系,运用数据包络分析法(DEA),识别了不同设计启用频率的蓄滞洪区洪水管理与可持续发展的最优途径.结果表明:① 不同设计启用频率的蓄滞洪区在建成35年内,部分湿地化情景是中国70%蓄滞洪区的最优发展途径.② 设计启用频率50年一遇是蓄滞洪区发展途径选择的边界值;当等于或低于50年一遇时,部分湿地化是其最优途径;当高于50年一遇时,维持其现状是最优途径.  相似文献   

14.
《Comptes Rendus Geoscience》2008,340(9-10):644-650
The knowledge of past catastrophic events can improve flood risk mitigation policy, with a better awareness against risk. As such historical information is usually available in Europe for the past five centuries, historians are able to understand how past society dealt with flood risk, and hydrologists can include information on past floods into an adapted probabilistic framework. In France, Flood Risk Mitigation Maps are based either on the largest historical known flood event or on the 100-year flood event if it is greater. Two actions can be suggested in terms of promoting the use of historical information for flood risk management: (1) the development of a regional flood data base, with both historical and current data, in order to get a good feedback on recent events and to improve the flood risk education and awareness; (2) the commitment to keep a persistent/perennial management of a reference network of hydrometeorological observations for climate change studies.  相似文献   

15.
刘诚  梁燕  王其松  彭石 《水科学进展》2017,28(5):770-779
磨刀门已由"径流型"向"径流-波浪型"河口转变,波浪已是该河口主要动力之一,但波浪对河口洪季水流及泄洪的影响缺少研究。在2-D潮流数学模型中添加随潮位实时变化的波浪辐射应力,建立波浪潮流耦合数学模型;波浪求解采用缓坡方程,背景水深由潮流模型实时提供,可通过比较考虑和未考虑波浪影响的河口流场来分析波浪对泄洪的影响。在年均常浪作用下,磨刀门河口洪季涨落潮阶段均有明显的波生环流结构。由于波浪作用方向向陆,波生流减弱了浅滩区的向海余流,增大了浅滩向陆余流;受浅滩向海余流减弱影响,河口动力自调整后形成归槽水流,促使深槽内向海余流增大。波浪有顶托河口泄洪之势,可改变滩槽泄洪分配比例;年均常浪的波高较小,其对潮流及泄洪的影响区域限制在浅水区,故对泄洪的负面影响有限。  相似文献   

16.
基于力学过程的蓄滞洪区洪水风险评估模型及应用   总被引:1,自引:0,他引:1       下载免费PDF全文
果鹏  夏军强  陈倩  李娜 《水科学进展》2017,28(6):858-867
为定量评估分蓄洪工程启用过程中蓄滞洪区的洪水风险等级,创建了基于力学过程的蓄滞洪区洪水风险评估模型。该模型采用二维水动力学模块计算蓄滞洪区的洪水演进过程,利用洪水中人体跌倒失稳公式及洪水中房屋、农作物损失的计算关系式,评估各类受淹对象的洪水风险等级。然后将二维水动力学模块计算的洪水要素与两个物理模型试验值进行对比,表明二维水动力学模块的计算精度良好。最后计算了荆江分洪工程启用时分洪区内洪水的演进过程,并评估洪灾中群众的危险等级和财产损失。计算结果表明:洪水演进至140 h时,蓄滞洪区群众、房屋、水稻和棉花的平均损失率分别为85%、59%、63%和72%。模型中提出的采用基于受淹对象失稳机制的洪水风险分析方法,比以往经验水深法划分风险等级的适用性更好,不仅能为洪水风险管理及蓄滞洪区启用标准制定提供参考,也能推广应用于溃坝或堰塞湖溃决等极端洪水风险评估。  相似文献   

17.
18.
The production of flood hazard assessment maps is an important component of flood risk assessment. This study analyses flood hazard using flood mark data. The chosen case study is the 2013 flood event in Quang Nam, Vietnam. The impacts of this event included 17 deaths, 230 injuries, 91,739 flooded properties, 11,530 ha of submerged and damaged agricultural land, 85,080 animals killed and widespread damage to roads, canals, dykes and embankments. The flood mark data include flood depth and flood duration. Analytic hierarchy process method is used to assess the criteria and sub-criteria of the flood hazard. The weights of criteria and sub-criteria are generated based on the judgements of decision-makers using this method. This assessment is combined into a single map using weighted linear combination, integrated with GIS to produce a flood hazard map. Previous research has usually not considered flood duration in flood hazard assessment maps. This factor has a rather strong influence on the livelihood of local communities in Quang Nam, with most agricultural land within the floodplain. A more comprehensive flood hazard assessment mapping process, with the additional consideration of flood duration, can make a significant contribution to flood risk management activities in Vietnam.  相似文献   

19.
A lightweight decision support system is presented, oriented also to statistics, useful for assisting weather forecasters and other parties interested in hazard assessment associated with extreme weather. The system can be used in enhancing the warning procedures, ahead of a flood or a flash flood whose probability of occurrence is based on the history of such events in a particular region. A software application has been built that integrates meteorological data with Geographical Information Systems procedures, in a unified informational aggregate. This system stores various types of data related to flood and flash flood events, so it is able to provide the user with any piece of information related to a documented event. It also catalogues any information that users provide it with, to further document a past, or an ongoing event. The system can be used to raise awareness of forecasters over a particular context, before a possibly hazardous situation, and it can also offer automatic warnings and suggestions to those interested in disaster mitigation.  相似文献   

20.
National flood discharge mapping in Austria   总被引:5,自引:0,他引:5  
This article presents the approach and the results of a study in which 30, 100 and 200 year return period flood discharges were estimated for 26,000 km of Austrian streams. Three guiding principles were adopted: combination of automatic methods and manual assessments by hydrologists to allow speedy processing and account for the local hydrological situation; combination of various sources of information including flood peak samples, rainfall data, runoff coefficients and historical flood data; and involvement of the Hydrographic Services to increase the accuracy and enhance the acceptance of results. The flood discharges for ungauged catchments were estimated by the Top-kriging approach with manual adjustment to the local flood characteristics. The adopted combination approach proved to be very efficient both in terms of the project time required and in terms of the accuracy and acceptability of the estimated flood discharges of given return periods.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号