首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
This paper compares the seismic demands obtained from an intensity‐based assessment, as conventionally considered in seismic design guidelines, with the seismic demand hazard. Intensity‐based assessments utilize the distribution of seismic demand from ground motions that have a specific value of some conditioning intensity measure, and the mean of this distribution is conventionally used in design verification. The seismic demand hazard provides the rate of exceedance of various seismic demand values and is obtained by integrating the distribution of seismic demand at multiple intensity levels with the seismic hazard curve. The seismic demand hazard is a more robust metric for quantifying seismic performance, because seismic demands from an intensity‐based assessment: (i) are not unique, with different values obtained using different conditioning intensity measures; and (ii) do not consider the possibility that demand values could be exceeded from different intensity ground motions. Empirical results, for a bridge‐foundation‐soil system, illustrate that the mean seismic demand from an intensity‐based assessment almost always underestimates the demand hazard value for the exceedance rate considered, on average by 17% and with a large variability. Furthermore, modification factors based on approximate theory are found to be unreliable. Adopting the maximum of the mean values from multiple intensity‐based assessments, with different conditional intensity measures, provides a less biased prediction of the seismic demand hazard value, but with still a large variability, and a proportional increase the required number of analyses. For an equivalent number of analyses, direct computation of the seismic demand hazard is a more logical choice and provides additional performance insight. Copyright © 2013 John Wiley & Sons, Ltd.  相似文献   

2.
An improved seismic hazard model for use in performance‐based earthquake engineering is presented. The model is an improved approximation from the so‐called ‘power law’ model, which is linear in log–log space. The mathematics of the model and uncertainty incorporation is briefly discussed. Various means of fitting the approximation to hazard data derived from probabilistic seismic hazard analysis are discussed, including the limitations of the model. Based on these ‘exact’ hazard data for major centres in New Zealand, the parameters for the proposed model are calibrated. To illustrate the significance of the proposed model, a performance‐based assessment is conducted on a typical bridge, via probabilistic seismic demand analysis. The new hazard model is compared to the current power law relationship to illustrate its effects on the risk assessment. The propagation of epistemic uncertainty in the seismic hazard is also considered. To allow further use of the model in conceptual calculations, a semi‐analytical method is proposed to calculate the demand hazard in closed form. For the case study shown, the resulting semi‐analytical closed form solution is shown to be significantly more accurate than the analytical closed‐form solution using the power law hazard model, capturing the ‘exact’ numerical integration solution to within 7% accuracy over the entire range of exceedance rate. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

3.
A probabilistic approach to estimate maximum inelastic displacement demands of single‐degree‐of‐freedom (SDOF) systems is presented. By making use of the probability of exceedance of maximum inelastic displacement demands for given maximum elastic spectral displacement and the mean annual frequency of exceedance of elastic spectral ordinates, a simplified procedure is proposed to estimate mean annual frequencies of exceedance of maximum inelastic displacement demands. Simplifying assumptions are thoroughly examined and discussed. Using readily available elastic seismic hazard curves the procedure can be used to compute maximum inelastic displacement seismic hazard curves and uniform hazard spectra of maximum inelastic displacement demands. The resulting maximum inelastic displacement demand spectra provide a more rational way of establishing seismic demands for new and existing structures when performance‐based approaches are used. The proposed procedure is illustrated for elastoplastic SDOF systems having known‐lateral strength located in a region of high seismicity in California. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

4.
Alternative non‐linear dynamic analysis procedures, using real ground motion records, can be used to make probability‐based seismic assessments. These procedures can be used both to obtain parameter estimates for specific probabilistic assessment criteria such as demand and capacity factored design and also to make direct probabilistic performance assessments using numerical methods. Multiple‐stripe analysis is a non‐linear dynamic analysis method that can be used for performance‐based assessments for a wide range of ground motion intensities and multiple performance objectives from onset of damage through global collapse. Alternatively, the amount of analysis effort needed in the performance assessments can be reduced by performing the structural analyses and estimating the main parameters in the region of ground motion intensity levels of interest. In particular, single‐stripe and double‐stripe analysis can provide local probabilistic demand assessments using minimal number of structural analyses (around 20 to 40). As a case study, the displacement‐based seismic performance of an older reinforced concrete frame structure, which is known to have suffered shear failure in its columns during the 1994 Northridge Earthquake, is evaluated. Copyright © 2008 John Wiley & Sons, Ltd.  相似文献   

5.
According to the most modern trend, performance‐based seismic design is aimed at the evaluation of the seismic structural reliability defined as the mean annual frequency (MAF) of exceeding a threshold level of damage, i.e. a limit state. The methodology for the evaluation of the MAF of exceeding a limit state is herein applied with reference to concentrically ‘V’‐braced steel frames designed according to different criteria. In particular, two design approaches are examined. The first approach corresponds to the provisions suggested by Eurocode 8 (prEN 1998—Eurocode 8: design of structures for earthquake resistance. Part 1: general rules, seismic actions and rules for buildings), while the second approach is based on a rigorous application of capacity design criteria aiming at the control of the failure mode (J. Earthquake Eng. 2008; 12 :1246–1266; J. Earthquake Eng. 2008; 12 :728–759). The aim of the presented work is to focus on the seismic reliability obtained through these design methodologies. The probabilistic performance evaluation is based on an appropriate combination of probabilistic seismic hazard analysis, probabilistic seismic demand analysis (PSDA) and probabilistic seismic capacity analysis. Regarding PSDA, nonlinear dynamic analyses have been carried out in order to obtain the parameters describing the probability distribution laws of demand, conditioned to given values of the earthquake intensity measure. Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

6.
This paper evaluates a recent record selection and scaling procedure of the authors that can determine the probabilistic structural response of buildings behaving either in the elastic or post‐elastic range. This feature marks a significant strength on the procedure as the probabilistic structural response distribution conveys important information on probability‐based damage assessment. The paper presents case studies that show the utilization of the proposed record selection and scaling procedure as a tool for the estimation of damage states and derivation of site‐specific and region‐specific fragility functions. The method can be used to describe exceedance probabilities of damage limits under a certain target hazard level with known annual exceedance rate (via probabilistic seismic hazard assessment). Thus, the resulting fragility models can relate the seismicity of the region (or a site) with the resulting building performance in a more accurate manner. Under this context, this simple and computationally efficient record selection and scaling procedure can be benefitted significantly by probability‐based risk assessment methods that have started to be considered as indispensable for developing robust earthquake loss models. Copyright © 2013 John Wiley & Sons, Ltd.  相似文献   

7.
In a companion paper, an overview and problem definition was presented for ground motion selection on the basis of the conditional spectrum (CS), to perform risk‐based assessments (which estimate the annual rate of exceeding a specified structural response amplitude) for a 20‐story reinforced concrete frame structure. Here, the methodology is repeated for intensity‐based assessments (which estimate structural response for ground motions with a specified intensity level) to determine the effect of conditioning period. Additionally, intensity‐based and risk‐based assessments are evaluated for two other possible target spectra, specifically the uniform hazard spectrum (UHS) and the conditional mean spectrum (CMS, without variability).It is demonstrated for the structure considered that the choice of conditioning period in the CS can substantially impact structural response estimates in an intensity‐based assessment. When used for intensity‐based assessments, the UHS typically results in equal or higher median estimates of structural response than the CS; the CMS results in similar median estimates of structural response compared with the CS but exhibits lower dispersion because of the omission of variability. The choice of target spectrum is then evaluated for risk‐based assessments, showing that the UHS results in overestimation of structural response hazard, whereas the CMS results in underestimation. Additional analyses are completed for other structures to confirm the generality of the conclusions here. These findings have potentially important implications both for the intensity‐based seismic assessments using the CS in future building codes and the risk‐based seismic assessments typically used in performance‐based earthquake engineering applications. Copyright © 2013 John Wiley & Sons, Ltd.  相似文献   

8.
This paper presents a new methodology based on structural performance to determine uniform fragility design spectra, i.e., spectra with the same probability of exceedance of a performance level for a given seismic intensity. The design spectra calculated with this methodology provide directly the lateral strength, in terms of yield‐ pseudo‐accelerations, associated with the rate of exceedance of a specific ductility characterizing the performance level for which the structures will be designed. This procedure involves the assessment of the seismic hazard using a large enough number of seismic records of several magnitudes; these records are simulated with an improved empirical Green function method. The statistics of the performance of a single degree of freedom system are obtained using Monte Carlo simulation considering the seismic demand, the fundamental period, and the strength of the structure as uncertain variables. With these results, the conditional probability that a structure exceeds a specific performance level is obtained. The authors consider that the proposed procedure is a significant improvement to others considered in the literature and a useful research tool for the further development of uniform fragility spectra that can be used for the performance‐based seismic design and retrofit of structures.  相似文献   

9.
Seismic hazard disaggregation is commonly used as an aid in ground‐motion selection for the seismic response analysis of structures. This short communication investigates two different approaches to disaggregation related to the exceedance and occurrence of a particular intensity. The impact the different approaches might have on a subsequent structural analysis at a given intensity is explored through the calculation of conditional spectra. It is found that the exceedance approach results in conditional spectra that will be conservative when used as targets for ground‐motion selection. It is however argued that the use of the occurrence disaggregation is more consistent with the objectives of seismic response analyses in the context of performance‐based earthquake engineering. Copyright © 2015 John Wiley & Sons, Ltd.  相似文献   

10.
Previous comparison studies on seismic isolation have demonstrated its beneficial and detrimental effects on the structural performance of high‐speed rail bridges during earthquakes. Striking a balance between these 2 competing effects requires proper tuning of the controlling design parameters in the design of the seismic isolation system. This results in a challenging problem for practical design in performance‐based engineering, particularly when the uncertainty in seismic loading needs to be explicitly accounted for. This problem can be tackled using a novel probabilistic performance‐based optimum seismic design (PPBOSD) framework, which has been previously proposed as an extension of the performance‐based earthquake engineering methodology. For this purpose, a parametric probabilistic demand hazard analysis is performed over a grid in the seismic isolator parameter space, using high‐throughput cloud‐computing resources, for a California high‐speed rail (CHSR) prototype bridge. The derived probabilistic structural demand hazard results conditional on a seismic hazard level and unconditional, i.e., accounting for all seismic hazard levels, are used to define 2 families of risk features, respectively. Various risk features are explored as functions of the key isolator parameters and are used to construct probabilistic objective and constraint functions in defining well‐posed optimization problems. These optimization problems are solved using a grid‐based, brute‐force approach as an application of the PPBOSD framework, seeking optimum seismic isolator parameters for the CHSR prototype bridge. This research shows the promising use of seismic isolation for CHSR bridges, as well as the potential of the versatile PPBOSD framework in solving probabilistic performance‐based real‐world design problems.  相似文献   

11.
This paper examines four methods by which ground motions can be selected for dynamic seismic response analyses of engineered systems when the underlying seismic hazard is quantified via ground motion simulation rather than empirical ground motion prediction equations. Even with simulation‐based seismic hazard, a ground motion selection process is still required in order to extract a small number of time series from the much larger set developed as part of the hazard calculation. Four specific methods are presented for ground motion selection from simulation‐based seismic hazard analyses, and pros and cons of each are discussed via a simple and reproducible illustrative example. One of the four methods (method 1 ‘direct analysis’) provides a ‘benchmark’ result (i.e., using all simulated ground motions), enabling the consistency of the other three more efficient selection methods to be addressed. Method 2 (‘stratified sampling’) is a relatively simple way to achieve a significant reduction in the number of ground motions required through selecting subsets of ground motions binned based on an intensity measure, IM. Method 3 (‘simple multiple stripes’) has the benefit of being consistent with conventional seismic assessment practice using as‐recorded ground motions, but both methods 2 and 3 are strongly dependent on the efficiency of the conditioning IM to predict the seismic responses of interest. Method 4 (‘generalized conditional intensity measure‐based selection’) is consistent with ‘advanced’ selection methods used for as‐recorded ground motions and selects subsets of ground motions based on multiple IMs, thus overcoming this limitation in methods 2 and 3. Copyright © 2015 John Wiley & Sons, Ltd.  相似文献   

12.
In a related study developed by the authors, building fragility is represented by intensity‐specific distributions of damage exceedance probability of various damage states. The contribution of the latter has been demonstrated in the context of loss estimation of building portfolios, where it is shown that the proposed concept of conditional fragility functions provides the link between seismic intensity and the uncertainty in damage exceedance probabilities. In the present study, this methodology is extended to the definition of building vulnerability, whereby vulnerability functions are characterized by hazard‐consistent distributions of damage ratio per level of primary seismic intensity parameter—Sa(T1). The latter is further included in a loss assessment framework, in which the impact of variability and spatial correlation of damage ratio in the probabilistic evaluation of seismic loss is accounted for, using test‐bed portfolios of 2, 5, and 8‐story precode reinforced concrete buildings located in the district of Lisbon, Portugal. This methodology is evaluated in comparison with current state‐of‐the‐art methods of vulnerability and loss calculation, highlighting the discrepancies that can arise in loss estimates when the variability and spatial distributions of damage ratio, influenced by ground motion properties other than the considered primary intensity measure, are not taken into account.  相似文献   

13.
Two new closed‐form expressions representing the mean rate of exceedance of a given limit state are presented herein. These proposals overcome limitations that were identified with the original formulation of the well‐known SAC/FEMA approach. The new expressions involve new parametric functions for the modeling of the seismic hazard data and for the demand evolution for increasing values of the earthquake intensity measure. Given the carefully selected parametric form of these functions, mathematical tractability is able to be maintained to establish two new closed‐form solutions representing the mean rate of exceedance of a given limit state. The function proposed for the hazard exhibits nonlinear behavior in log‐log space and is able to represent the actual hazard data over a wider range of earthquake intensity levels. The function proposed for the demand evolution addresses issues related to the inadequate performance of the SAC/FEMA approach when force‐based demand parameters such as the shear force are considered. To illustrate the applicability of the new closed‐form solutions, the probability of occurrence of several limit states is determined for a reinforced concrete structure. Copyright © 2013 John Wiley & Sons, Ltd.  相似文献   

14.
A generalized conditional intensity measure (GCIM) approach is proposed for use in the holistic selection of ground motions for any form of seismic response analysis. The essence of the method is the construction of the multivariate distribution of any set of ground‐motion intensity measures conditioned on the occurrence of a specific ground‐motion intensity measure (commonly obtained from probabilistic seismic hazard analysis). The approach therefore allows any number of ground‐motion intensity measures identified as important in a particular seismic response problem to be considered. A holistic method of ground‐motion selection is also proposed based on the statistical comparison, for each intensity measure, of the empirical distribution of the ground‐motion suite with the ‘target’ GCIM distribution. A simple procedure to estimate the magnitude of potential bias in the results of seismic response analyses when the ground‐motion suite does not conform to the GCIM distribution is also demonstrated. The combination of these three features of the approach make it entirely holistic in that: any level of complexity in ground‐motion selection for any seismic response analysis can be exercised; users explicitly understand the simplifications made in the selected suite of ground motions; and an approximate estimate of any bias associated with such simplifications is obtained. Copyright © 2010 John Wiley & Sons, Ltd.  相似文献   

15.
The conventional integral approach is very well established in probabilistic seismic hazard assessment (PSHA). However, Monte‐Carlo (MC) simulations can become an efficient and flexible alternative against conventional PSHA when more complicated factors (e.g. spatial correlation of ground shaking) are involved. This study aims at showing the implementation of MC simulation techniques for computing the annual exceedance rates of dynamic ground‐motion intensity measures (GMIMs) (e.g. peak ground acceleration and spectral acceleration). We use multi‐scale random field technique to incorporate spatial correlation and near‐fault directivity while generating MC simulations to assess the probabilistic seismic hazard of dynamic GMIMs. Our approach is capable of producing conditional hazard curves as well. We show various examples to illustrate the potential use of the proposed procedures in the hazard and risk assessment of geographically distributed structural systems. Copyright © 2015 John Wiley & Sons, Ltd.  相似文献   

16.
Limitations associated with deterministic methods to quantify demands and develop rational acceptance criteria have led to the emergence of probabilistic procedures in performance‐based seismic engineering. The Pacific Earthquake Engineering Research performance‐based methodology is one such approach. In this paper, the impact of certain modelling decisions made at different stages of the evaluation process on the performance assessment of a typical multi‐bent viaduct is examined. Modelling, in the context of this paper, covers hazard modelling, structural modelling and loss modelling. The specific application considered in this study is a section of an existing viaduct in California: the I‐880 interstate highway. Several simulation models of the viaduct are developed, a series of nonlinear time‐history analyses are carried out to predict demands, measures of damage are evaluated and the probability of closure of the viaduct is estimated using the specified hazard for the site. It is concluded that the methodology offers several advantages over existing deterministic performance‐based procedures. Results of the investigation indicate that the assessment methodology is particularly sensitive to the reliability of decisions made by bridge inspectors following a seismic event, and to the dispersion in the demand estimation, which in turn is influenced by several factors including soil–structure interaction effects and ground motion scaling procedures. Copyright © 2005 John Wiley & Sons, Ltd.  相似文献   

17.
A probabilistic representation of the entire ground‐motion time history can be constructed based on a stochastic model that depends on seismic source parameters. An advanced stochastic simulation scheme known as Subset Simulation can then be used to efficiently compute the small failure probabilities corresponding to structural limit states. Alternatively, the uncertainty in the ground motion can be represented by adopting a parameter (or a vector of parameters) known as the intensity measure (IM) that captures the dominant features of the ground shaking. Structural performance assessment based on this representation can be broken down into two parts, namely, the structure‐specific part requiring performance assessment for a given value of the IM, and the site‐specific part requiring estimation of the likelihood that ground shaking with a given value of the IM takes place. The effect of these two alternative representations of ground‐motion uncertainty on probabilistic structural response is investigated for two hazard cases. In the first case, these two approaches are compared for a scenario earthquake event with a given magnitude and distance. In the second case, they are compared using a probabilistic seismic hazard analysis to take into account the potential of the surrounding faults to produce events with a range of possible magnitudes and distances. The two approaches are compared on the basis of the probabilistic response of an existing reinforced‐concrete frame structure, which is known to have suffered shear failure in its columns during the 1994 Northridge Earthquake in Los Angeles, California. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

18.
This paper examines the potential development of a probabilistic design methodology, considering hysteretic energy demand, within the framework of performance‐based seismic design of buildings. This article does not propose specific energy‐based criteria for design guidelines, but explores how such criteria can be treated from a probabilistic design perspective. Uniform hazard spectra for normalized hysteretic energy are constructed to characterize seismic demand at a specific site. These spectra, in combination with an equivalent systems methodology, are used to estimate hysteretic energy demand on real building structures. A design checking equation for a (hypothetical) probabilistic energy‐based performance criterion is developed by accounting for the randomness of the earthquake phenomenon, the uncertainties associated with the equivalent system analysis technique, and with the site soil factor. The developed design checking equation itself is deterministic, and requires no probabilistic analysis for use. The application of the proposed equation is demonstrated by applying it to a trial design of a three‐storey steel moment frame. The design checking equation represents a first step toward the development of a performance‐based seismic design procedure based on energy criterion, and additional works needed to fully implement this are discussed in brief at the end of the paper. Copyright © 2006 John Wiley & Sons, Ltd.  相似文献   

19.
This paper addresses two important issues of concern to practicing engineers and researchers alike in application of performance‐based seismic assessment (PBSA) methodology on buildings: (i) the number of ground motion records required to exercise PBSA—current practice (FEMA P‐58‐1) requires eleven or more pairs of motions for this purpose, and (ii) the time and effort associated with performing the number of nonlinear response history analyses required to exercise PBSA. We present a method for exercising of PBSA that employs classical linear modal analysis to develop a first estimate (i.e., a priori) of probability distribution of loss, followed by utilizing Bayesian statistics to update this estimate using estimates of loss obtained by utilizing a small number of nonlinear response history analyses of a detailed model of the building (i.e., posterior). The proposed technique is used to assess the distribution of monetary loss of two case studies, a 4‐story reinforced concrete moment‐resisting frame building and a 20‐story steel moment‐resisting frame building, both located in Los Angeles, for a ground motion hazard with 10% probability of exceedance in 50 years. The efficiency of the proposed PBSA method is demonstrated by showing the similarity between the distribution of monetary loss at each story of case study buildings obtained from the traditional/sophisticated PBSA methodology and the proposed PBSA method in this study. Copyright © 2015 John Wiley & Sons, Ltd.  相似文献   

20.
This study develops a framework to evaluate ground motion selection and modification (GMSM) procedures. The context is probabilistic seismic demand analysis, where response history analyses of a given structure, using ground motions determined by a GMSM procedure, are performed in order to estimate the seismic demand hazard curve (SDHC) for the structure at a given site. Currently, a GMSM procedure is evaluated in this context by comparing several resulting estimates of the SDHC, each derived from a different definition of the conditioning intensity measure (IM). Using a simple case study, we demonstrate that conclusions from such an approach are not always definitive; therefore, an alternative approach is desirable. In the alternative proposed herein, all estimates of the SDHC from GMSM procedures are compared against a benchmark SDHC, under a common set of ground motion information. This benchmark SDHC is determined by incorporating a prediction model for the seismic demand into the probabilistic seismic hazard analysis calculations. To develop an understanding of why one GMSM procedure may provide more accurate estimates of the SDHC than another procedure, we identify the role of ‘IM sufficiency’ in the relationship between (i) bias in the SDHC estimate and (ii) ‘hazard consistency’ of the corresponding ground motions obtained from a GMSM procedure. Finally, we provide examples of how misleading conclusions may potentially be obtained from erroneous implementations of the proposed framework. Copyright © 2014 John Wiley & Sons, Ltd.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号