首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
In August 2005 severe flood events occurred in the Alps. A sediment routing model for steep torrent channel networks called SETRAC has been applied to six well‐documented case study streams with substantial sediment transport in Austria and Switzerland. For these streams information on the sediment budget along the main channel is available. Flood hydrographs were reconstructed based on precipitation data and stream gauges in neighbouring catchments. Different scenarios are modelled and discussed regarding sediment availability and the effect of armouring and macro‐roughness on sediment transport calculations. The simulation results show the importance of considering increased flow resistance for small relative flow depth when modelling bedload transport during high‐intensity flood events in torrents and mountain rivers. Without any correction of increased flow resistance using a reduced energy slope, the predicted bedload volumes are about a factor of 10 higher on average than the observed values. Simulation results were also used for a back‐calculation of macro‐roughness effects from bedload transport data, and compared with an independent estimate of flow resistance partitioning based on flow resistance data. Copyright © 2010 John Wiley & Sons, Ltd.  相似文献   

2.
The present study proposes a method for evaluating the effectiveness of road‐crossing drainage culverts in ephemeral streams. This approach is focused on estimating the culvert capacity in road–stream crossings and the probable runoff generated on the road from hydrological thresholds associated with hydromorphological criteria. In particular, discharges at bankfull and flood‐prone stages have been used in combination with 2.5 and 100‐year peak discharges. Different hydraulic variables have been considered for calculating the discharge through culverts under these conditions (e.g. tailwater and headwater depth, inlet control, pipe roughness, pipe cross‐area and slope, pipe outlet velocity, critical water depth, and flow rate over the road). Geomorphological factors such as bed stability, bed load transport, and channel roughness have also been considered because of their potential for obstructing the drains in this type of channel. In addition, a potential obstruction index (PIOBSTR) has been calculated, as a dependent parameter of the obstacle index (IOBST) and the potential build‐up of coarse sediments (PBCS). The study has been carried out on the Mediterranean coast in the region of Murcia (Spain), where there are numerous examples of road–stream crossings equipped with culverts in ephemeral channels that could cause highly dangerous situations for road traffic. Copyright © 2012 John Wiley & Sons, Ltd.  相似文献   

3.
A comprehensive monitoring programme focusing on bedload transport behaviour was conducted at a large gravel‐bed river. Innovative monitoring strategies were developed during five years of preconstruction observations accompanying a restoration project. A bedload basket sampler was used to perform 55 cross‐sectional measurements, which cover the entire water discharge spectrum from a 200‐year flood event in 2013 to a rare low flow event. The monitoring activities provide essential knowledge regarding bedload transport processes in large rivers. We have identified the initiation of motion under low flow conditions and a decrease in the rate of bedload discharge with increasing water discharge around bankfull conditions. Bedload flux strongly increases again during high flood events when the entire inundation area is flooded. No bedload hysteresis was observed. The effective discharge for bedload transport was determined to be near mean flow conditions, which is therefore at a lower flow discharge than expected. A numerical sediment transport model was able to reproduce the measured sediment transport patterns. The unique dataset enables the characterisation of bedload transport patterns in a large and regulated gravel‐bed river, evaluation of modern river engineering measures on the Danube, and, as a pilot project has recently been under construction, is able to address ongoing river bed incision, unsatisfactory ecological conditions for the adjacent national park and insufficient water depths for inland navigation. Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   

4.
Levee effects upon flood levels: an empirical assessment   总被引:1,自引:0,他引:1  
This study used stream gauge records to assess the impact of levees on flood levels, providing an empirical test of theoretical and model predictions of the effects on local flood response. Focusing upon a study area in Illinois and Iowa for which levee records were available, we identified 203 gauges with ≥ 50 years hydrological record, including 15 gauges where a levee was constructed during the period of record. At these sites, step‐change analysis utilizing regression residuals tested levee‐related stage changes and levels of significance and quantified the magnitudes of stage changes. Despite large differences in stream sizes, levee alignments, and degree of floodplain constriction, the post‐levee rating‐curve adjustments showed consistent signatures. For all the study sites, stages for below bankfull (non‐flood) conditions were unaffected by levee construction. For above bankfull (flood) conditions, stages at sites downstream of their associated levees also were statistically indistinguishable before versus after levee construction. However, at all sites upstream of levees or within leveed reaches, stages increased for above bankfull conditions. These increases were abrupt, statistically significant, and generally large in magnitude – ranging up to 2.3 m (Wabash River at Mt. Carmel, IL). Stage increases began when discharge increased above bankfull flow and generally increased in magnitude with discharge until the associated levee(s) were overtopped. Detailed site assessments and supplementary data available from some sites helped document the dominant mechanisms by which levees can increase flood levels. Levee construction reduces the area of the floodplain open to storage of flood waters and reduces the width of the floodplain open to conveyance of flood flow. Floodplain conveyance often is underestimated or ignored, but Acoustic Doppler Current Profiler (ADCP) measurements analysed here confirm previous studies that up to 70% or more of the total discharge during large floods (~3% chance flood) can move over the floodplain. Upstream of levees and levee‐related floodplain constriction, backwater effects reduce flow velocities relative to pre‐levee conditions and, thus, increase stages for a given discharge. The empirical results here confirm a variety of theoretical predictions of levee effects but suggest that many one‐dimensional model‐based predictions of levee‐related stage changes may underestimate actual levee impacts. Copyright © 2011 John Wiley & Sons, Ltd.  相似文献   

5.
For most of the year, a dry‐bed desert wash is void of water flow. Intensive rain events, however, could trigger significant flash floods that bring about highly complicated hydrodynamics and morphodynamics processes within a desert stream. We present a fully coupled three‐phase flow model of air, water, and sediment to simulate numerically the propagation of a flash flood in a field‐scale fluvial desert stream, the so‐called Tex Wash located in the Mojave Desert, California, United States. The turbulent flow of the flash flood is computed using the three‐dimensional unsteady Reynolds‐averaged Navier–Stokes equations closed with the shear stress transport k ? ω model. The free surface of the flash flood at the interface of air and water phases is computed with the level‐set method, which enables instantaneous tracking of the water surface as the flash flood propagates over the dry bed of the desert stream. The evolution of the desert fluvial stream's morphology, due to the action of the propagating flash flood on the mobile bed, is calculated using a Eulerian morphodynamics model based on the curvilinear immersed boundary method. The capabilities of the proposed numerical framework are demonstrated by applying it to simulate a flash flood event in a 0.65‐km ‐long reach of the Tex Wash, the intricate channel morphology of which is obtained using light imaging detection and ranging technology. The simulated region of the stream includes a number of bridge foundations. The simulation results of the model for the flash flood event revealed the formation of a highly complex flow field and scour patterns within the stream. Moreover, our simulation results showed that most scour processes take place during the steady phase of the flash flood, that is, after the flash flood fills the stream. The transient phase of the flash flood is rather short and contributes to a very limited amount of erosion within the desert stream.  相似文献   

6.
Field data are essential in evaluating the adequacy of predictive equations for sediment transport. Each dataset based on the sediment transport rates and other relevant information gives an increased understanding and improved quantification of different factors influencing the sediment transport regime in the specific environment. Data collected for 33 sites on 31 mountain streams and rivers in Central Idaho have enabled the analysis of sediment transport characteristics in streams and rivers with different geological, topographic, morphological, hydrological, hydraulic, and sedimentological characteristics. All of these streams and rivers have armored, poorly sorted bed material with the median particle size of surface layer coarser than the subsurface layer. The fact that the largest particles in the bedload samples did not exceed the median particle size of the bed surface material indicates that the armor layer is stable for the observed flow discharges (generally bankfull or less, and in some cases two times higher than bankfull discharge). The bedload transport is size‐selective. The transport rates are generally low, since sediment supply is less than the ability of flow to move the sediment for one range of flow discharges, or, the hydraulic ability of the stream is insufficient for entrainment of the coarse bed material. Detailed analyses of bedload transport rates, bedload and bed material characteristics were performed for each site. The obtained results and conclusions are used to identify different influences on bedload transport rates in analyzed gravel‐bed rivers. Copyright © 2008 John Wiley & Sons, Ltd.  相似文献   

7.
Synchronously and accurately estimating the flood discharges and dynamic changes in the fluid density is essential for hydraulic analysis and forecasting of flash floods, as well as for risk assessment. However, such information is rare for steep mountain catchments, especially in regions that are hotspots for earthquakes. Therefore, six hydrological monitoring sites were established in the main stream and tributaries of the 78.3‐km2 Longxi River catchment, an affected region of the Wenchuan earthquake region in China. Direct real‐time monitoring equipment was installed to measure the flow depths, velocities, and fluid total pressures of the flood hydrographs. On the basis of field measurements, real‐time mean cross‐sectional velocities during the flood hydrographs could be derived from easily obtainable parameters: cross‐sectional maximum velocities and the calibrated dimensionless parameter Kh . Real‐time discharges were determined on the basis of a noncontact method to establish the effective rating curves of this mountainous stream, ranging from 1.46 to 386.34 m3/s with the root mean square errors of ≤10.22 m3/s. Compared with the traditional point‐velocity method and empirical Manning's formula, the proposed noncontact method was reliable and safe for monitoring whole flood hydrographs. Additionally, the real‐time fluid density during the flood hydrographs was calculated on the basis of the direct monitoring parameters for fluid total pressures and water depths. During the flood hydrograph, transient flow behaviour with higher fluid density generally occurred downstream during the flood peak periods when the flow was in the supercritical flow regime. The observed behaviour greatly increased the threat of damage to infrastructure and human life near the river. Thus, it is important to accurately estimate flood discharge and identify for fluid densities so that people at risk from an impending flash flood are given reliable, advanced warning.  相似文献   

8.
Dominant discharge may be defined as that discharge which transports most bed sediment in a stream that is close to steady-state conditions. The concept is examined in relation to two single thread gravel-bedded streams. One stream is alluvial and free to adjust its geometry whilst in the other, channel capacity and form are partially constrained by cohesive till-banks and a heavily compacted bed. The total quantity of bedload and its calibre were measured for every flood over a six year period, so that the relationship between the grain-size of bedload and the most effective discharge could be examined in the context of thresholds for channel change. The dominant discharge concept was applicable to the alluvial stream in that the bankfull value is an effective discharge for maintaining channel capacity. The concept applied less well to the ‘non-alluvial’ stream. Although in both streams the bankfull value was exceeded for less than 0.34 per cent of the time, overbank flows are important in instigating channel change. It is only during overbank flows that the largest bed material is entrained in quantity. For within-channel flows a threshold separates flows which winnow fine matrix from those which entrain the finer bed gravels. This threshold occurred at 60 per cent bankfull. It was concluded that the dominant discharge concept can be applied to streams close to steady-state which are alluvial, competent, and free to adjust their boundaries. An important proviso is that two channel-stability domains can be recognized. These domains represent channel maintenance and channel adjustment and are defined by intrinsic thresholds in the bed material entrainment function.  相似文献   

9.
It has been thought for some time that bedload sediment transport rates may differ markedly in ephemeral and perennial rivers and, supporting this thought, there has been observation of very high rates of bedload transport by flash floods in the ephemeral river Nahal Yatir. However, until now, there has been no quantitative model resolving the observation, nor a theory capable of explaining why bedload transport rates by unsteady flash floods can be reasonably well described by bedload transport capacity formulae initially derived for steady flows. Here a time scale analysis of bedload transport is presented as pertaining to Nahal Yatir, which demonstrates that bedload transport can adapt sufficiently rapidly to capacity determined exclusively by local flow regime, and accordingly the transport capacity formulations developed for steady flows can be applied even under unsteady flows such as flash floods. Complementing the time scale analysis, a series of computational exercises using a coupled shallow water hydrodynamic model are shown to adequately resolve the observation of the very high rates of bedload transport by flash floods in Nahal Yatir. While bedload transport rates in ephemeral and perennial rivers differ remarkably when evaluated against a pure flow parameter such as specific stream power, they are essentially reconciled if assessed with a physically sensible parameter incorporating not only the flow regime but also the sediment particle size. The present finding underpins the practice of fluvial geomorphologists relating measured bedload transport to local flow and sediment characteristics only, irrespective of whether the flow is unsteady or steady. Copyright © 2010 John Wiley & Sons, Ltd.  相似文献   

10.
Bankfull discharge is a key parameter in the context of river engineering and geomorphology, as an indicator of flood discharge capacity in alluvial rivers, and varying in response to the incoming flow and sediment regimes. Bankfull channel dimensions have significantly adjusted along the Lower Yellow River (LYR) due to recent channel degradation, caused by the operation of the Xiaolangdi Reservoir, which has led to longitudinal variability in cross‐sectional bankfull discharges. Therefore, it is more representative to describe the flood discharge capacity of the LYR, using the concept of reach‐averaged bankfull discharge. Previous simple mean methods to estimate reach‐scale bankfull discharge cannot meet the condition of flow continuity or account for the effect of different spacing between two sections. In this study, a general method to calculate cross‐sectional bankfull discharge using the simulated stage‐discharge relation is outlined briefly, and an integrated method is then proposed for estimating reach‐scale bankfull discharge. The proposed method integrates a geometric mean based on the log‐transformation with a weighted average based on the spacing between two consecutive sections, which avoids the shortcomings of previous methods. The post‐flood reach‐scale bankfull discharges in three different channel‐pattern reaches of the LYR were estimated annually during the period from 1999 to 2010 using the proposed method, based on surveyed post‐flood profiles at 91 sedimentation sections and the measured hydrological data at seven hydrometric sections. The calculated results indicate that: (i) the estimated reach‐scale bankfull discharges can effectively represent the flood discharge capacity of different reaches, with their ranges of variation being less than those of typical cross‐sectional bankfull discharges; and (ii) the magnitude of the reach‐scale bankfull discharge in each reach can respond well to the accumulative effect of incoming flow and sediment conditions. Finally, empirical relationships for different reaches in the LYR were developed between the reach‐scale bankfull discharge and the previous four‐year average discharge and incoming sediment coefficient during flood seasons, with relatively high correlation coefficients between them being obtained, and the reach‐scale bankfull discharges in different reaches predicted by the delayed response model were also presented for a comparison. These relations for the prediction of reach‐scale bankfull discharges were validated using the cross‐sectional profiles and hydrological data measured in 2011. Copyright © 2013 John Wiley & Sons, Ltd.  相似文献   

11.
The benefits of three simple modifications to the design of a Birkbeck bedload slot‐sampling system that has been continuously operating in Nahal Eshtemoa, Israel, since the early 1990s are demonstrated. The modifications include the deployment of a removable slot cover which delays the accumulation of sediment, so allowing sampling at late stages of a flood and, in conjunction with other samplers, extending the period of sampling during a flood wave; inclusion of a slot the size of which is adjustable so that that the probability of sampling the largest clast sizes in transit as bedload can be increased post‐installation, once knowledge is gained about the bedload grain‐size distribution; and a sampler side‐wall door that allows stratification and textural changes within the accumulated bedload to be identified, so promoting intelligent sampling of the deposit for grain‐size determination. Results from seven flash‐floods are presented and discussed, with recommendations for bedload monitoring, particularly in rivers where sediment flux is high and dynamic sediment records are inevitably short because of instrumental limitations. Copyright © 2006 John Wiley & Sons, Ltd.  相似文献   

12.
Indirect, passive approaches for monitoring coarse bedload transport could allow cheaper, safer, higher‐resolution, longer‐term data that revolutionises bedload understanding and informs river management. Here, insights provided by seismic impact plates in a downstream reach of a flashy gravel‐bed river (River Avon, Devon, UK) are explored in the context of plate performance. Monitoring of a centrally‐situated plate (IP1) during an extremely wet 12‐month period demonstrated that impacts were related to discharge as a measure of transport potential (R2 = 0.38) but that factors other than transport limitations are important. Analysis of discrete flow events revealed consistent rising‐limb and falling‐limb impact spikes biased toward the latter for larger events. Such patterns may result from disruption of the upstream armour layer (rising limb) and supply enhancements related to both upstream mass bank failures and/or flood routing of non‐local sediment sources (falling limb). Installation of additional impact plates indicated that plate IP1 was indeed dominantly related to instantaneous discharge, that a three‐plate lateral array somewhat better explained impact variability (R2 = 0.49), and that the bedload track shifts laterally with discharge. Aggregating event‐total IP1 impacts against volumetric discharge further increases explanation as intra‐event and stochastic bedload factors are subsumed but left 26% unexplained variance related to the unsampled bedload mass, inter‐event supply differences, and attributes of plate performance. Annualising the data created an impact‐based 'effective discharge’ for this extremely wet year that was closer to morphological bar‐full in magnitude than bankfull, but the preceding results imply this outcome is related as much to supply limitations as transport limitations. Overall, passive approaches offer a liberating prospect for bedload monitoring, capable of producing insights only achievable through high resolution, extended time periods. Such results could potentially inform threshold conditions and geomorphological effectiveness of flows for future river management strategies. Copyright © 2015 John Wiley & Sons, Ltd.  相似文献   

13.
In the Erlenbach stream, a pre‐alpine steep channel in Switzerland, sediment transport has been monitored for more than 25 years. Near the confluence with the main valley river, stream flow is monitored and sediment is collected in a retention basin with a capacity of about 2000 m3. The basin is surveyed at regular intervals and after large flood events. In addition, sediment transport has been continuously monitored with piezoelectric bedload impact and geophone sensors since 1986. In 2008–2009, the measuring system in the Erlenbach stream was enhanced by installing an automatic system to obtain bedload samples. Movable metal baskets are mounted on a rail at the downstream wall of the large check dam above the retention basin, and they can be moved automatically into the flow to take bedload transport samples. The wire mesh of the baskets has a spacing of 10 mm to sample all sediment particles coarser than this size (which is about the limiting grain size detected by the geophones). The upgraded measuring system permits to obtain bedload samples over short sampling periods and to measure the grain size distribution of the transported material and its variation over time and with discharge. The analysis of calibration relationships for the geophone measuring system confirms findings from very similar measurements which were performed until 1999 with piezoelectric bedload impact sensors; there is a linear relationship between impulse counts and bedload mass passing over the sensors. Findings from flume experiments are used to discuss the most important factors which affect the calibration of the geophone signal. The bedload transport rates as measured by the moving baskets are among the highest measured in natural streams, with values of the order of several kilograms per meter per second. Copyright © 2012 John Wiley & Sons, Ltd.  相似文献   

14.
Automatic and continuously recording samplers are deployed in a Hertfordshire gravel-bed stream to show that bedload transport is related to stream power. The pattern is similar to that already established for North American channels but, because the record is so detailed, it is possible to identify the cause of the considerable scatter that is normal in such relationships. A major factor is the occurrence of rhythmic pulses in bedload discharge that are not matched by similar fluctuations in hydraulic variables. It is suggested that these pulses reflect downstream differences in the concentration of mobile particles in a slow-moving traction carpet, and that they may be likened to kinematic waves. The record also reveals that the threshold of sediment transport—always presumed hithero to be associated with incipient motion—is related to the cessation of bedload transport in a river flood. Indeed, the mean value of stream power at the finish of bedload transport is only 20 percent of that prevailing at the moment of incipient sediment motion. Because of this, there is an inevitably poor correlation between actual bedload transport rates and those predicted by bedload equations which rely upon a single traction threshold. These new data show that the general inverse relationship between bedload discharge and water-depth : grain-size ratio proposed by Bagnold (1977, 1980) is not universal. Transport efficiency for this gravel-bed stream is typically 0.05 per cent of available stream power, which compares with 1.6 per cent for a river moving both gravel and sand, and 5 per cent for another channel where bedload is composed predominantly of sand-sized particles. It is argued that coarse and fine-grained alluvial channels may need to be considered separately. By allowing for differences in traction threshold at the beginning and end of bedload events, and by averaging bedload discharge flood by flood in order to smooth out the effect of pulses, it is possible to achieve a reasonably good prediction of average bedload transport rate in terms of stream power.  相似文献   

15.
The stability criterion of maximum flow efficiency (MFE) has previously been found inherent in typical alluvial channel flow relationships, and this study investigates the general nature of this criterion using a wider range of flow resistance and bedload transport formulae. For straight alluvial channels, in which the effect of sediment sorting is insignificant, our detailed mathematical analysis demonstrates that a flow efficiency factor ε occurs generally as the ratio of sediment (bedload) discharge Qs to stream power Ω (γQS) in the form of . When ε is maximized (i.e. Qs is maximized or Ω is minimized), maximally efficient straight channel geometries derived from most flow resistance and bedload transport formulae are found compatible with observed bankfull hydraulic geometry relations. This study provides support for the use of the criteria of MFE, maximum sediment transporting capacity and minimum stream power for understanding the operation of alluvial rivers, and also addresses limitations to the direct application of its findings. Copyright © 2002 John Wiley & Sons, Ltd.  相似文献   

16.
《国际泥沙研究》2016,(3):271-278
In order to assess the dynamics of rivers, a reliable characterization of bedload transport particularly during unsteady flow regimes is required. In contrast to highly energetic cases in hillslope areas, we aim to answer the question whether the usage of acoustic measurements can improve the characterization of bedload in small rivers draining low land mountains with comparatively low water discharge and bedload. In addition to the investigation of natural flood events, controlled floods were generated by releasing water from a reservoir into a small gravel-bed stream. The controlled releases allow for an evaluation of bedload solely from channel storage or bank erosion. For acoustical in-situ characterization of bedload transport, hydrophones were mounted onto the bottom side of steel plates, thus recording the impacts of sediments via the acoustic vibrations on the surface of the plates while at the same time minimizing the disturbing noise resulting from water turbulence. Corresponding bedload traps are removable boxes with open lids fixed in the riverbed so that bedload material registered by the hydrophone is trapped. The acoustic signals correlate well with the quantity of the transported material. During summer flood events the highest transport rates occur at the beginning of the rising limb fea-turing clockwise hysteresis. This is due to the rising transport energy of the flow and the presence of loose, unconsolidated material. During typical winter flood events bedload shows anticlockwise loops. The intensification of bedload conveyance after the runoff peak can be explained by a decreasing stability of the bed material from the beginning to the end of a transport event. Anticlockwise behavior also results from a combination of bedload exhaustion in the vicinity of the monitoring station with a delayed arrival of new material from distal sources later in the hydrograph.  相似文献   

17.
I. Takken  J. Croke  P. Lane 《水文研究》2008,22(2):254-264
This paper outlines a conceptual and methodological approach to evaluating the risk of road derived runoff delivery, which is based on the principle of hydrological connectivity. Three different types of runoff delivery pathways are identified (stream crossings, gullied pathways and diffuse pathways) and the volume of runoff that may reach the stream through these pathways during a one in 10 year 30 minute event is estimated. The methodology is applied to three catchments of contrasting forest use, both plantation and native. Results show that degree of connectivity of a road depends on catchment characteristics such as the topography, road placement, drain spacing and road and drainage density. Maps outlining the distribution of different delivery pathways within a catchment are used to assess the potential for runoff connectivity. In one of the selected study catchments, the Albert River, greatest potential connectivity can be isolated to a single road. The upper part of this road crosses many tributaries resulting in high connectivity via stream crossings, whereas the lower part of the road is located within the valley bottom, where the majority of drains will contribute runoff during a one in 10 year event through diffuse overland flow. The presented methodology is also used to highlight hot‐spots in terms of runoff and sediment delivery through the creation of risk assessment maps, which allows for the evaluation of different procedures for road rehabilitation. Using examples from the Albert River catchment, we demonstrate that minimizing diffuse overland flow can generally be achieved by the placement of additional road drains, whereas at highly connected road segments the relocation of the road might be the only option. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

18.
Flood hydrographs from ephemeral streams in arid areas provide valuable information for assessing run‐off and groundwater recharge. However, such data are often scarce or incomplete, especially in hyper‐arid regions. The hypothesis of this study was that it is possible to reconstruct a hydrograph of a specific point along an ephemeral stream with the knowledge of only the peak flow rate of a flood event at that point and that this can be done at almost every point along the stream. The feasibility of this approach lies in the shape of the recession stage of the flood hydrograph, which is known to be a repeating phenomenon. The recession stage comes immediately after the peak flow rate, when it begins its decline, and lasts until the flood is extinguished. A general shape of the flood recession stage can be provided. Because the recession stage represents ~80% of the duration of a flood event, it can provide a general idea of the flood hydrograph's shape. A simple model based on geometric progression is suggested to describe the repeating recession stage of a flood. The advantage of the proposed model is that it requires only one parameter: the recession characteristic at a fixed point along the ephemeral stream, termed recession coefficient q. By knowing the recession coefficient of a fixed point and the peak flow rate of a flood event at that point, one can plot the flood hydrograph. A good agreement is shown between the observed and computed values of the recession stage. Copyright © 2016 John Wiley & Sons, Ltd.  相似文献   

19.
Discharge characteristics in six adjacent mountainous watersheds in northern New Mexico, U.S.A., vary substantially between basins underlain by different lithologies. Relatively resistant gneisses and granites underlie two basins (drainage areas: 43 and 94 km2) that have high unit discharge (0·010 to 0·14 m3s?1 km?2), high bankfull discharge, and sustained high discharge. Less resistant sandstones and shales underlie four basins (drainage areas: 96 to 215 km2) that have relatively low unit discharge (0·001 to 0·005 m3s?1 km?2), relatively low bankfull discharge, and peak discharges that are not sustained as long as those in the crystalline terrane. Analysis of snowmelt-runoff water budgets suggests that three factors control hydrologic conditions in the basins. First, area-elevation distributions appear to control the timing and amounts of water input. These distributions probably reflect the erosional resistance of the different lithologies. Second, lithology appears to control runoff production in areas having minor amounts of storage. Third, glacial deposits in headwater regions control discharge duration and timing via storage and return flow releases. The amount of return flow released by glacial deposits, however, is probably controlled by the permeability of underlying bedrock. Therefore it appears that the duration, timing, and magnitude of discharge events in the study area are controlled both directly and indirectly by lithology. Stream power and shear stress estimates derived from bankfull discharge and bed-material size data suggest that higher bedload transport rates and larger bedload particle sizes exist in streams draining crystalline rocks than in streams draining sedimentary terrane. It appears that source-area lithology, by controlling discharge production, also influences stream power, bedload transport capabilities, and therefore total amounts of bedload transport.  相似文献   

20.
Relative to those at sub‐bankfull flow, hydraulic conditions at overbank flow, whether in the channel or on the floodplain, are poorly understood. Here, velocity conditions are analysed over an unusually wide range of flows in the arid zone river of Cooper Creek with its complex system of anastomosing channels and large fluctuations in floodplain width. At‐a‐station hydraulic geometry relationships reveal sharp discontinuities in velocity at the inbank–overbank transition, the nature of the discontinuity varying with the degree of flow confinement and the level of channel–floodplain interaction. However, despite inter‐sectional differences, velocities remain modest throughout the flow range in this low‐gradient river, and the large increases in at‐a‐station discharge are principally accommodated by changes in cross‐sectional area. Velocity distribution plots suggest that within‐channel conditions during overbank flow are characterized by a central band of high velocity which penetrates far toward the bed, helping to maintain already deep cross‐sections. Floodplain resistance along Cooper Creek is concentrated at channel bank tops where vegetation density is highest, and the subsequent flow retardation is transmitted across the surface of the channels over distances as large as 50–70 m. The rough floodplain surface affects flood wave transmission, producing significant decreases in wave speeds downstream. The character of the wave‐speed–discharge relationship also changes longitudinally, from log–linear in the upper reaches to nonlinear where the floodplain broadens appreciably. The nonlinear form is similar in several respects to relationships proposed for more humid rivers, with flood wave speed reaching an intermediate maximum at about four‐fifths bankfull discharge before decreasing to a minimum at approximately Q2·33. It does not regain the value at the intermediate maximum until the 10 year flood, by which time floodplain depths have become relatively large and broad floodways more active. Copyright © 2002 John Wiley & Sons, Ltd.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号