首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 46 毫秒
1.
地铁行车速度对盾构隧道运营沉降的影响分析   总被引:1,自引:0,他引:1  
姜洲  高广运  赵宏 《岩土力学》2015,36(11):3283-3292
地铁行车荷载经轨道-道床-隧道结构传至地基,在土体内部产生循环动应力以及超孔隙水压力是引起盾构隧道沉降的重要原因。通过车-轨-隧道-地基竖向耦合动力模型分析隧道差异沉降对列车运行荷载的影响,以上海地铁一号线体育馆站附近区间隧道为工程背景建立三维数值模型,结合塑性累积应变及累积孔压经验公式进行计算,对比分析软土盾构隧道下卧土层有、无纵向差异沉降两种情况下,地铁行车速度对隧道运营沉降的影响。结果表明:列车运行速度越快,下卧土体波动越大,但衰减越快。地基差异沉降对其长期运营存在明显不利影响,随着列车速度增大,这种影响也愈加明显。当地基差异沉降小,轨道平顺条件好时,隧道长期沉降随地铁行车速度的增大而减小;当地基差异沉降突出,轨道存在明显不平顺时,隧道运营沉降随行车速度增大而显著增加。  相似文献   

2.
Nowadays, the issue of predicting soil settlement has gradually become an important research area. The theory of predicting soil settlement under static load is comparatively mature, while the method of predicting soil settlement under dynamic loading is still at the exploratory stage. This paper aimed to find a suitable model to satisfy the prediction of long-term settlements of subway tunnel. The settlement monitoring data of Subway Line 1 in Shanghai were taken as the case. In this paper, current nonlinear prediction methods of settlement were summarized. The fitting method was introduced and applied in the settlement data of Shanghai subway tunnel; correlation coefficient r of the fitting results can keep a high level in most cases, illustrating the validity of segmentation simulation. Two kinds of prediction methods and its utilizing methods were introduced in this paper, i.e., Grey Model (1, 1) and Auto-Regressive and Moving Average Model (n, m). The settlement trend of Subway Line 1 in Shanghai was predicted by GM (1, 1) and ARMA (n, m) model. The results show that ARMA (n, m) model is more precise than the GM (1, 1). As a new method in settlement prediction field, ARMA (n, m) model is prospective in the future.  相似文献   

3.
离心模型中的固结时间是原型固结时间的1/n2,能够在较短的时间内模拟软土地基的长期沉降。以上海地铁4号线修复段双线盾构隧道为研究对象,利用离心模型试验研究了隧道的纵向长期沉降及稳定性特性,预测了15-20a之后完好段、连接段和修复段隧道纵向沉降量和沉降分布。最后,得出了连接段两端差异沉降最大的结论。并提出隧道与修复段的连接刚度应采用刚性连接,以提高连接点附近隧道适应变形能力的修复意见。  相似文献   

4.
马险峰  陈斌  田小芳  王俊淞 《岩土力学》2012,33(12):3604-3610
随着地铁网络不断完善,越来越多的新建盾构隧道近距离穿越既有隧道,然而对于盾构隧道近距离穿越既有隧道影响的研究尚不够完善。以上海典型软弱地层为背景,通过离心模型试验,研究了不同注浆率下的盾构上穿越施工对既有隧道以及周围地层的影响。选用排液法在离心场中模拟盾构施工,在不停机状态下成功模拟隧道开挖卸载、地层损失和注浆效应。分析了在不同的注浆率条件下,既有隧道在上穿越施工期和工后长期的位移、周围孔压和纵向应力的变化规律。试验结果表明,新建隧道近距离上穿越既有隧道时,隧道开挖的卸载效应等会导致既有隧道的隆起,但随着注浆率增大,既有隧道的隆起量减小。但过高注浆率对周围土体扰动较大,从而导致工后既有隧道的沉降也越大。  相似文献   

5.
结合南京地铁某盾构施工区间,对纵向地表沉降进行了理论分析,提出了盾构掘进对纵向地表的影响范围,总结了盾构推进不同阶段引起地表沉降量占总沉降量的百分比。针对引起地表沉降因素的复杂性和不稳定性,将纵向地表沉降视为随机过程,基于延迟差分方程建立模型进行动态预报,并与实测数据进行比较。结果表明,该方法具有较高的准确性。  相似文献   

6.
BP神经网络-灰色系统联合模型预测软基沉降量   总被引:24,自引:1,他引:23  
彭涛  杨岸英  梁杏  袁琴 《岩土力学》2005,26(11):1810-1814
目前软基沉降预测多采用指数曲线和双曲线延伸法,其结果不够理想,神经网络在此方面的运用也存在一定的局限,虽然GM(1,1)模型在软基沉降预测领域已得到运用,但在已有的案例中所使用的等时距模型都没有明确说明所采用的插值方法。以深圳湾西部通道填海软基沉降预测分析为例,建立BP神经网络-灰色系统联合模型来探讨解决这一问题的方法。采用BP神经网络逼近非线性插值方法构建等时距时间序列数据,在此基础上建立沉降变形时间序列的GM模型,并建立相应的时间响应函数,预测沉降量。计算实例表明,该模型短期沉降预测结果比较准确,其最终沉降预测结果具有一定的工程参考价值。  相似文献   

7.
王芳  贺少辉  刘军  曹瑞琅 《岩土力学》2012,33(Z2):289-296
在盾构隧道基础上结合浅埋暗挖法可以有效地解决地铁车站和盾构隧道施工之间的矛盾。北京地铁14号线试验段采用外径为10 m的土压平衡盾构修建,试验段上的车站结合PBA法(洞桩法)扩挖而成。综合运用预测地表沉降的经验公式、相关统计资料和规范,以及数值模拟方法,对大断面盾构隧道结合洞桩法修建地铁车站的施工过程进行地表沉降分析。结合北京地铁车站地表沉降控制基准值和现有地铁车站地表沉降统计数据,提出较为合理的地表沉降控制标准,并按照三级控制的管理方法,分级分步进行地表沉降控制,研究结果对指导工程施工有一定的参考价值。  相似文献   

8.
魏纲  张金菊  魏新江 《岩土力学》2006,27(Z2):825-828
利用径向基函数网络理论,采用Matlab软件进行编程,对盾构隧道引起的轴线上方地面长期沉降进行预测。在实际操作中,将训练(即拟合)和仿真(即预测)融为一体,使预测结果具有较高的精度。6个算例分析结果表明,径向基函数网络方法可以较好地预测盾构隧道引起的地面长期沉降。  相似文献   

9.
以某软土地区邻近地铁车站及盾构隧道的双侧深基坑工程为背景,运用ABAQUS数值计算软件对邻近地铁车站及盾构隧道的双侧深基坑施工进行数值模拟,研究了双侧深基坑施工过程对基坑坑内土体隆起与坑外土体沉降的影响,分析了双侧深基坑施工过程中地铁车站及盾构隧道变形情况,得出地铁车站及盾构隧道变形规律。计算结果表明:基坑内侧土体隆起最大值为54.3 mm;围护结构X向位移最大值为32.8 mm,Y向位移最大值为26.8 mm;车站竖向位移最大值发生在A1区开挖至坑底工况,最大值为6.8 mm,而车站水平位移最大值为7.6 mm;弯矩累计增量最大值155.9 kN·m/m,经计算,施工过程对车站主体结构影响很小;盾构隧道X向水平位移最大值为4.7 mm;而盾构隧道沉降最大值为3.8 mm,发生在A1区开挖至坑底工况。   相似文献   

10.
城市地铁隧道开挖引起过大的地表沉降会对隧道工程本身及地表建筑物造成危害。有效预计并合理控制隧道开挖引起的地表沉降具有重要的实践意义。以武汉地铁虎名区间隧道开挖工程为背景,运用有限元数值模拟软件MIDAS/GTS建立隧道断面开挖的数值模型,计算隧道开挖引起的地表沉降量,与实测沉降量进行拟合; 根据隧道开挖过程中对应地表及临近建筑物的实际情况,优化开挖断面围岩预处理方案,建立优化后的断面开挖模型。模拟结果表明,优化后地表沉降仍在安全范围内,可以为类似工程沉降控制提供参考。  相似文献   

11.
地表沉降是地铁盾构施工过程中最关心的工程问题之一,关乎近邻建筑物能否正常运营及盾构能否正常施工。故本文以地表沉降为关键目标进行地铁盾构参数研究。将影响地表沉降的盾构参数概括为开挖面支护压力比和等代层弹性模量。在此基础上,以长沙地铁1号线南门口—侯家塘区间为工程背景,采用FLAC3D软件对不同盾构参数下的施工过程进行数值模拟,分析了开挖面支护压力比及等代层弹性模量对地表沉降的影响,提出了研究区段的盾构参数建议值。研究同时得出了在建议盾构参数下,研究区段发生地表沉降的范围及地表沉降最大值。为长沙地铁后续建设及其他城市地铁建设盾构参数的选取提供理论依据和方法参考。  相似文献   

12.
王晓睿  姜洪建  朱坤  张丰尧  刘晓南 《地球科学》2019,44(12):4293-4298
通过经验、理论分析和数值模拟等预测方法,并结合实测数据研究分析土压盾构施工引起的地表沉降问题.分析结果表明:预测方法估算的最大沉降值总高于实测的沉降值;Oteo方法的曲线形态更优化;当隧道埋深较浅时,Loganathan-Poulos、Sagaseta、Peck和Verruijt-Booker方法均过高估算了最大沉降量,且Loganathan-Poulos、Sagaseta和Verruijt-Booker方法给出的沉降槽偏宽;数值模拟方法比分析和经验方法更有效,可以有效模拟施工过程.根据研究结果,经验、理论分析和数值模拟方法具有一定的安全储备空间,可用于软土地层中土压盾构施工引起的地面沉降预测.   相似文献   

13.
江帅  朱勇  栗青  周辉  涂洪亮  杨凡杰 《岩土力学》2022,43(1):195-204
城市地铁隧道施工不可避免地对围岩产生扰动引起地表沉降,动态预测隧道开挖引起的地表沉降是确保地表建构筑物与隧道施工安全的重要基础。针对隧道施工过程中地表沉降难以准确动态预测的问题,在定义纵向开挖度系数? 的基础上,建立横向地表沉降动态预测模型。该模型能够描述同一监测位置沉降曲线随掌子面推进而不断变化的规律,实现施工现场沉降动态预测。结果表明:在特定约束条件下,该模型能够退化为Peck模型以及随机介质理论预测模型;通过现场施工验证了该动态预测模型的准确性与适用性;基于纵向开挖度系数? 将隧道沿纵向分为强烈、中度和轻度共3个影响段,较好地反映了开挖掌子面在不同位置对同一监测截面的影响程度;通过分析建筑物和隔离桩对地表沉降曲线的影响可知,建筑物与其附近地层呈现出协同变形、共同承载的特征,在隧道一侧添加地质钻隔离桩对该侧地表沉降值的减小程度可达71.9%。研究成果对滇中引水工程现场施工与类似工程具有一定指导和借鉴意义。  相似文献   

14.
盾构隧道局部长期渗水对隧道变形及地表沉降的影响分析   总被引:3,自引:0,他引:3  
刘印  张冬梅  黄宏伟 《岩土力学》2013,34(1):290-298
研究表明,盾构隧道长期渗水会造成地表及隧道严重沉降。针对盾构隧道局部渗流难以模拟的现状,首先提出了一种既符合盾构隧道刚度要求又能实现局部接头渗水的计算方法;在稳定渗流状态对应的相同渗流量的前提下,对比分析了管片在不同接头渗水条件下隧道周围土体孔压分布、地表和隧道沉降以及隧道变形规律。分析结果表明,盾构隧道渗水接头的位置不同,孔压分布、地表和隧道沉降以及隧道的变形均有明显差异;接头位置越靠近隧道底部,渗水导致的孔压减小越显著,造成的地表及隧道沉降越显著。接头渗水不但会使隧道发生横向椭圆化变形,还会引起隧道左右两侧受力不平衡,从而造成隧道水平侧移。通过对比表明,采用接头渗水和传统的衬砌均质渗水得到的孔压分布、沉降及隧道变形规律均有显著不同;不考虑隧道局部渗水特点会对隧道结构长期性态的认识产生偏差。  相似文献   

15.
朱训国  陈枫  徐孟林  赵德深 《岩土力学》2013,34(Z1):148-154
以大连市地铁2号线202标段工程为研究对象,通过相似材料模型试验绘制不同地层随时间沉降曲线,即同一时刻不同地层沉降槽曲线和不同地层水平位移曲线,得到盾构隧道施工地层移动规律。试验结果表明,不同地层各测点的垂直位移随时间的变化可用以时间为自变量的负指数函数表示;先行隧道施工对地层产生扰动,引起地层软化,导致两条隧道之间地表沉降明显叠加,沉降较大;隧道开挖时,若存在地下结构或管线,其将受到附加剪切作用,易出现裂缝,在施工中必须做好切实可行的防护措施。  相似文献   

16.
Grey correlation-hierarchical analysis for metro-caused settlement   总被引:1,自引:0,他引:1  
Monitoring Shanghai metro tunnels and their surroundings indicates that the maximum settlement caused by metro operation for years has been more than 25 cm in soft soil of tunnel bottom, which has seriously affected the normal operation of subway, and even caused some old house cracking around subway lines. To investigate main influence factors on metro-caused settlement so as to provide the basis for the control of metro-caused settlement, the analytical hierarchy process was adopted to make their weight arrangement. With the experience analogy and grey correlation theory, the grey correlation-hierarchical analysis method was proposed to evaluate the possibility of metro-caused settlement in soft soil of tunnel bottom. The correlation of metro-caused settlement and its influence factors (such as dynamic load conditions of metro, soil conditions, burial conditions of soil prone to dynamic settlement, and hydrogeology conditions) was probed. Taking Shanghai Yangtze River Tunnel project in China (it is now the largest shield tunnel in the world) as an example, the division estimation and the comprehensive evaluation of possibility and severity for metro-caused settlement were also done. The results were observed as follows: (1) the severity of settlements caused by dynamic load of metro in soft soil of tunnel bottom at the same position increases as the speed of subway trains increases; (2) On comparison between the foundations of silty clay and clayey silt, the former is generally more prone to the metro-caused settlement under the same conditions as dynamic load conditions of metro, void ratio of soil, natural water content of soil, burial conditions, and hydrogeology conditions; (3) the grey correlation-hierarchical analysis method is more applicable than grey correlation method for the possibility estimation of metro-caused settlement in the soft soil of tunnel bottom; (4) it may provide the reference for the possibility evaluation of metro-caused settlement in other similar projects.  相似文献   

17.
佘芳涛  王永鑫  张玉 《岩土力学》2015,36(Z1):287-292
地铁隧道施工过程中,地表纵向沉降槽最大倾斜率及其出现的时机对地面和地下建筑物的安全评价非常重要。针对目前采用累积概率曲线描述纵向沉降曲线的不足,依据黄土地区地铁隧道暗挖施工引起地表纵向沉降槽特征的研究,寻求一种能反映地表纵向沉降规律的函数,引入掌子面地表位移释放率和地表纵向沉降最大斜率2个特征值,提出基于特征值的地表纵向沉降预测方法。研究结果表明,黄土地区暗挖法地铁隧道施工过程,老黄土-古土壤地层掌子面地表位移释放率和地表纵向沉降最大斜率均较大,饱和软黄土地层的较小。经过数学严密推导,提出一种考虑掌子面地表位移释放率和地表纵向沉降最大斜率的地表纵向沉降预测分析方法,分析了其随着特征值的敏感性,验证了预测方法的可靠性和合理性。研究成果对于分析和预测地铁隧道施工引起地表不均匀沉降对地面与地下建筑的影响具有重要的意义。  相似文献   

18.

In view of the construction technology and formation deformation of the existing rivers under the subway shield interval tunnel, relying on Zhengzhou rail transit line 17 shield tunnel through the south-north water transfer channel project, using the trial tunneling method of shield tunnel test section to optimize all kinds of construction parameters, and the formation analysis and calculation of the determined digging pressure, noting the final parameters that are determined by comparison between the extractive parameters such as pulp pressure, and they are used in MIDAS GTS/NX finite unit analysis software for numerical simulation analysis, combined with on-site testing, to study the variation of different depth formation subsidence values and horizontal displacement values when passing through the south-north water transfer canal under water conditions, and put forward the reinforcement scheme of shield tunneling through the general river bed and hole. The results show that the maximum subsidence of the trunk canal shield through the bottom is 11.3 mm, and the verification parameters are reasonable and feasible. The horizontal subsidence trough of the soil above the over-soil layer at the top of the main canal embankment is distributed by Gauss. The sinking distribution can be estimated using the Peck formula, the middle of the layer subsidence trough is distributed horizontally, and the soil subsidence trough below it is inverted hump-like distribution, with the peak point directly above the center line of the two tunnels, and the vertical zero horizontal displacement surface is located in the middle line position between the two tunnels, and the horizontal zero horizontal displacement surface is located. The horizontal displacement curve of the soil layer above the soil layer is inverted S-type, the maximum displacement appears at the anti-bending point of the surface sedimentation trough curve, the horizontal displacement curve of the soil layer on the horizontal zero horizontal displacement surface is zero, and the lower soil layer curve is double-inverted S-shaped. In the construction, we should pay attention to the monitoring of the vertical subsidence and horizontal displacement of the deep soil, adjust the shield parameters and reduce the horizontal and vertical shearing effect of the deep soil on the surrounding pipeline, inner pile base and other structures during the construction of the shield.

  相似文献   

19.
盾构近距离穿越施工对已运营隧道的扰动影响分析   总被引:18,自引:2,他引:18  
邵华  张子新 《岩土力学》2004,25(Z2):545-549
基于盾构施工对周围土体及构筑物的扰动影响机理,通过实测数据对盾构近距离穿越扰动影响问题进行了定量分析,并讨论了运营隧道对各盾构施工参数的敏感性.研究结果表明盾构穿越对已建地铁隧道的扰动影响主要以隧道的竖向位移为主.随着盾构推进,隧道结构纵向上呈波浪状,其隆起峰值不断沿推进方向移动.盾尾后隧道段受盾构穿越的影响显著,但隆起峰值始终位于盾尾后.  相似文献   

20.
采用FLAC3D软件建立了交叉隧道的三维有限差分模型,以人工数定激励力模拟列车荷载,计算列车动荷载作用下土体的变形和应力。采用修正动偏应力长期沉降计算模型,结合分层总和法计算软土的沉降,预测交叉隧道的长期沉降规律。分析3种不同行车工况下地基长期沉降,工况1为一辆列车单独通过1#隧道,工况2为一辆列车单独通过2#隧道,工况3为两辆列车同时通过1#和2#隧道。对比不同的列车行驶速度、隧道衬砌刚度及厚度对隧道地基的长期影响。结果表明,由列车荷载引起的地基沉降主要集中在距隧道中心轴20 m范围内;在工况3下土体沉降大于工况1、2沉降之和;车速越快,沉降越小;衬砌刚度和厚度越小,沉降越大,且衬砌厚度对沉降的影响较大,衬砌刚度影响较小。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号