首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 671 毫秒
1.
An understanding of the temporal variation in reservoir sedimentation and identification of the main sources of sediment are necessary for the maintenance of sustainable reservoirs. For this purpose, field measurements, sampling, and fingerprinting of reservoir sediment were undertaken from July 2005 to November 2007. Source fingerprinting of reservoir sediment was conducted using cesium‐137 (137Cs). The relative contributions of gully bank and forest road, and forest floor material to reservoir sediment were calculated using a mixing model. Bank and forest road material, estimated to make up about 96% of the reservoir sediment, was the dominant source. Enormous reservoir sedimentation, which amounted to about 60% of the total reservoir sedimentation during the observation period, occurred during a heavy rainstorm with an 80‐year recurrence time. To maintain the sustainability of the reservoir in this study, therefore, temporal and spatial preparation strategies for heavy rainstorms and bank and forest road erosion should be considered. However, spatial information on sediment sources from 137Cs fingerprinting is limited. To better identify the sediment sources spatially and temporally, further studies applying soil erosion models and more detailed field studies are needed. Copyright © 2013 John Wiley & Sons, Ltd.  相似文献   

2.
I INTRODUCTIONThe number of dam constructions has increased during the last decades, pafticularly in the tropics andsemi-arid areas where high sediment yields are prominent, and therefore also the problems of reservoirsedimentation. In 1900 there were 42 large dams, i.e. higher than 15 m, while in 1950 and 1986 therewere 5,268 and about 39,000 respectively (ICOLD, 1988). In the period 1975 to 1990, the regions withthe largest increase of large dams were Central and South America, Asia …  相似文献   

3.
泥沙问题是三峡工程建设与运行中的关键技术问题之一,只有妥善处理好泥沙问题,才能保证三峡工程长期有效使用,维持水库功能的全面发挥。本文首先结合实测水文、河道地形观测资料,对三峡水库运行近20年来的泥沙淤积特性及水库排沙比进行了较为全面的分析研究,并与已有研究成果进行了对比;其次,围绕防洪、航运以及坝前段的泥沙淤积等方面,进一步分析了水库淤积产生的影响。结果表明:三峡水库蓄水以来,在不考虑区间来沙的情况下,三峡水库共淤积泥沙20.484亿t,近似年均淤积1.102亿t,水库排沙比为23.6%,水库年均淤积量为原论证预测值的33%。其中,库区干流段累计淤积泥沙17.835亿m3(变动回水区冲刷0.694亿m3;常年回水区淤积18.529亿m3),淤积在水库防洪库容内的泥沙为1.648亿m3(干、支流分别淤积1.517亿m3和0.131亿m3),占水库防洪库容的0.74%,“十一五”攻关阶段研究得出的多年平均淤积量及排沙比较实测值均偏大,变动回水区冲淤则出现反向的...  相似文献   

4.
Based on long-term measurements at three gauging stations, Toudaoguai, Fugu and Hequ, and one meteorological station, this article discusses the features of discharge (Q) and sediment concentration (Cs) of a river reach of the Yellow River with a reservoir located in the Loess Plateau. The impacts of the local sub-watershed between Toudaoguai and Fugu gauging stations on sediment budget to the Yellow River have been analyzed. In addition, the deposition processes in the Tianqiao Reservoir have been investigated. Results show over 80% of the precipitation that falls in the local subwatershed is unable to contribute to the Yellow River runoff process. It is found that the annualmaximum sediment concentration is usually less than 30 kg/m^3 during flood seasons at Toudaoguai Gauging Station, but the sediment concentration varies dramatically at Fugu Gauging Station. About 35% of the sediment eroded in the sub-watersheds between Toudaoguai and Fugu gauging stationswas produced from the Huangfuchuan sub-watershed which has a drainage area accounting only for 10% of the drainage area between Toudaoguai and Fugu gauging stations. The Tianqiao Reservoir generally has deposition during the summer flood season, and scouring during the non-flood season.On average, over 85% of deposited sediment in the reservoir occurs in the 12 km long lower reservoir reach. The volume of annual deposition in the reservoir mainly depends on the volume of water from the local region between Hequ and Fugu gauging stations.  相似文献   

5.
Large dam construction for irrigation, hydropower, water supply, and flood control in tropical to sub-tropical areas increased markedly after 1950. Many of the dams built during this period have filled with sediment and no longer perform to their original design specifications; in many cases, forecast dam life was greatly overestimated. This study investigates the useful life of Burdekin Falls Dam (BFD), northeastern Australia and compares the findings with other tropical reservoirs. Using two independent methods it is estimated that between 61 and 65 million m3 of sediment has been deposited in the reservoir over the 24 years of operation through 2011. This sediment volume equates to an average of 0.15% of capacity lost per year since construction was completed. If current sediment loads/climate regimes persist, reservoir capacity will be reduced by 50% after 345 years. However, the useful life of the BFD reduces to just 276 years when drawdown data are considered; these data show reservoir use would be affected once 40% of storage was filled with sediment, with a 60% drawdown return period of 1 in 15 years. When compared to similar large tropical to sub-tropical reservoirs, the BFD has a slightly longer reservoir useful life than dams in India and a much longer half-life than for both similar-sized and larger dams in China, Brazil, and Iran. Properties of the BFD that promote a longer useful life include a lower trap efficiency, relatively low annual sediment load delivered to the reservoir, limited sediment deposition behind the dam wall (and uniform distribution of deposited sediment), and the export of highly turbid annual floodwaters before settling and deposition of any remaining sediment within the reservoir.  相似文献   

6.
A method for rapid estimation of slopes of deposited sediment in reservoirs during unstable conditions is presented. As the limiting factor determining sediment load in a reservoir is the sediment carrying capacity of a current flowing through a reservoir, it is arqued that the slope of deposited sediment must be a function of the latter. After deriving an equation relating sediment slope to stream power, the latter being regarded as representative of sediment carrying capacity, a comparison between calculated and observed sediment slopes for average annual conditions in two South African reservoirs are presented. Using this equation as basic guideline, a semi-empirical graph is then presented which relates sediment slope to a factor representing average stream power in reservoirs.  相似文献   

7.
A comprehensive understanding of the dynamics of erosion and sedimentation in reservoirs under different management conditions is required to anticipate sedimentation issues and implement effective sediment management strategies. This paper describes a unique approach combining fluvial geomorphology tools and morphodynamic modeling for analyzing the sediment dynamics of an elongated hydropower reservoir subjected to management operations: the Génissiat Reservoir on the Rhône River. Functional sub‐reaches representative of the reservoir morphodynamics were delineated by adapting natural river segmentation methods to elongated reservoirs. The segmentation revealed the link between the spatial and temporal reservoir changes and the variability of longitudinal flow conditions during reservoir management operations. An innovative modeling strategy, incorporating the reservoir segmentation into two sediment transport codes, was implemented to simulate the dynamics of erosion and sedimentation at the reach scale during historic events. One code used a bedload approach, based on the Exner equation with a transport capacity formula, and the other used a suspended load approach based on the advection–dispersion equation. This strategy provided a fair quantification of the dynamics of erosion and sedimentation at the reach scale during different management operations. This study showed that the reservoir morphodynamics is controlled by bedload transport in upper reaches, graded suspended load transport of sand in middle reaches and suspended load transport of fine sediments in lower reaches. Eventually, it allowed a better understanding of the impact of dam management on sediment dynamics. Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   

8.
Although water and soil conservation activities reduce reservoir sedimentation, it is inevitable that reservoirs fed by rivers transporting high amounts of sediment will experience sedimentation. The Ghezel-Ozan and Shah-Roud rivers, which flow to the Sefld-Roud reservoir dam, are both highly sediment-laden and transport significant amounts of sediment in both bed load and suspended load forms to the reservoir. Hence, it seems that the only practical way to remove the sediment from the reservoir is to flush it out using the Chasse method. In the present paper, field measurements of Chasse operation characteristics taken in previous years are presented, and a numerical model that simulates this process is introduced. After calibrating the model using field measured data, the calculated results (for reservoir pressure flushing and released sediment volume) of the numerical model were compared with other measured data for the same Chasse operation and the results agree well. Finally, using the numerical simulation results, the best approaches to ensure highly effective flushing while conserving reservoir water are presented (at least for the Sefid-Roud dam). The operation of the bottom outlet gates, the shape of the output hydrograph, and the reservoir water level variation during flushing were optimized. In addition, the numerical model and related parameters, which need to be calibrated, are discussed.  相似文献   

9.
1 INTRODUCTION Increasing attention is being given to sedimentation hazards downstream from reservoirs as dams built during the past century accumulate progressively greater volumes of sediment. The sediment storage both decreases reservoir capacity and operating efficiency of the dam, and creates a 搒ediment-shadow?downstream where sediment-starved flows commonly erode channel boundaries and create long-term channel instabilities. Numerous studies have documented downstream channel change…  相似文献   

10.
This paper investigates temporal variations in fluxes of peat and other sediment in the catchment of March Haigh Reservoir, West Yorkshire. Long‐term estimates of sediment yield were derived from a study of reservoir sediments. Magnetic properties were used to correlate ten cores to a master profile dated using 210Pb and 137Cs. A 14C date suggests that most of the organic component of the sediment is allochthonous and derived from peat eroded from the catchment. Organic sediment yields suggest low catchment erosion rates between 1838 and 1963. Blanket peat erosion increased significantly after 1963, and peaked between 1976 and 1984. Estimates of total sediment yield range between 2 and 28 t km?2 a?1. These yields are significantly lower than those from some previous studies examining reservoir sedimentation in other blanket peat‐covered catchments. The low yield estimates may be due to relatively low rates of erosion in the basin, but may also be partly explained by maintenance of silt traps during the early life of the reservoir and removal of sediment by scouring. Sedimentation within the reservoir is spatially variable, and bathymetry and sediment source appear to be the dominant controls on sedimentation patterns within the reservoir. Copyright © 2005 John Wiley & Sons, Ltd.  相似文献   

11.
Open ditching is a common and relatively cheap way of providing drainage for wet upland soils prior to afforestation or improved agriculture; it is sometimes also used to channelize moorland runoff into water storage schemes. In contrast to piped under-drainage there is considerable danger of erosion in open ditches. Results are reported of investigations into the yield of bed-load from ditched catchments; compared with unditched catchments there is a considerable increase in yield and this causes costly local problems of sedimentation. However, the implications of the erosion for downstream channel changes and reservoir sedimentation in the uplands are harder to predict without further study of the storage processes affecting bed-load and of the influence of flood flows. The case studies are used to point to improvements in the design of open drainage networks.  相似文献   

12.
Abstract

Analyses of data from reservoir surveys and sediment rating curves are compared to predict sediment yield in three large reservoir watershed areas in Turkey. Sediment yield data were derived from reservoir sedimentation rates and suspended sediment measurements at gauging stations. The survey data were analysed to provide the volume estimates of sediment, the time-averaged sediment deposition rates, the long-term average annual loss rates in the reservoir storage capacity, and the long-term sediment yield of the corresponding watershed areas. Four regression methods, including linear and nonlinear cases, were applied to rating curves obtained from gauging stations. Application of the efficiency test to a power function form of a rating curve with nonlinear regression yielded the highest efficiency values. Based on the analysis of the sediment rating curves, sediment load fluxes were calculated by using average daily discharge data at each gauging station. Comparison of these two sediment yield values for each reservoir showed that the sediment yields from the suspended sediment measurements, SYGS, are 0.99 to 3.54 times less than those obtained from the reservoir surveys, SYRS. The results from the reservoir surveys indicate that all three reservoirs investigated have lost significant storage capacity due to high sedimentation rates.  相似文献   

13.
李涛  夏润亮  夏军强  张俊华  俞彦  吴丹 《湖泊科学》2021,33(5):1532-1540
支流作为水库综合效益发挥的重要组成部分,其河口泥沙大幅淤积会影响水库综合效益的发挥.选取多沙河流水库黄河小浪底库区畛水、石井两支流作为典型实例,在对1999-2015年汛后水库的来水来沙、水库调度、库区干支流淤积量与形态分析基础上,研究干支流淤积形态的变化,重点研究支流口门拦门沙坎抬升变化特征,结果表明:支流的分流及淤积与入库流量、含沙量及库区的淤积形态有关.入库流量越大,支流分流比小,支流淤积规模小;入库含沙量越大,支流分沙比越大,支流淤积规模越大.  相似文献   

14.
15.
Lewis and Clark Lake is located on the main stream of the Missouri River. The reservoir is formed behind Gavins Point dam near Yankton, South Dakota, U.S.A. The Lewis and Clark Lake reach extends about 40 km from the Gavins Point dam. The reservoir delta has been growing since the closure of Gavins Point dam in 1955 and has resulted in a 21% reduction of storage within the maximum pool of the reservoir. Among several sediment management methods, drawdown flushing has been recommended as a possible management technique. The engineering viability of removing sediments deposited in the lake should be examined by numerical modeling before implementing a drawdown flushing. GSTARS4 was used for this study and calibrated by using measured data from 1975 to 1995. Channel cross-section changes and amount of flushed sediment were predicted with four hypothetical flow scenarios. The flushing efficiencies of all scenarios were estimated by comparing the ratios between water consumption and flushed sediment during flushing.  相似文献   

16.
Shrink–swell soils, such as those in a Mediterranean climate regime, can cause changes in terms of hydrological and erosive responses because of the changing soil water storage conditions. Only a limited number of long‐term studies have focused on the impacts on both hydrological and erosive responses and their interactions in an agricultural environment. In this context, this study aims to document the dynamics of cracks, runoff and soil erosion within a small Mediterranean cultivated catchment and to quantify the influence of crack processes on the water and sediment supplied to a reservoir located at the catchment outlet using water and sediment measurements at a cultivated field outlet as baseline. Detailed monitoring of the presence of topsoil cracks was conducted within the Kamech catchment (ORE OMERE, Tunisia), and runoff and suspended sediment loads were continuously measured over a long period of time (2005–2012) at the outlets of a field (1.32 ha) and a catchment (263 ha). Analysis of the data showed that topsoil cracks were open approximately half of the year and that the rainfall regime and water table level conditions locally control the seasonal cracking dynamics. Topsoil cracks appeared to seriously affect the generation of runoff and sediment concentrations and, consequently, sediment yields, with similar dynamics observed at the field and catchment outlets. A similar time lag in the seasonality between water and sediment delivery was observed at these two scales: although the runoff rates were globally low during the presence of topsoil cracks, most sediment transport occurred during this period associated with very high sediment concentrations. This study underlines the importance of a good prediction of runoff during the presence of cracks for reservoir siltation considerations. In this context, the prediction of cracking effects on runoff and soil erosion is a key factor for the development of effective soil and water management strategies and downstream reservoir preservation. Copyright © 2016 John Wiley & Sons, Ltd.  相似文献   

17.
An analysis of hydrologic and geodetic data from numerous reservoirs lying in different climatic zones, has allowed the two main phases in filling the reservoir during its life to be distinguished, firstly silting of an originally deep reservoir, and secondly silting of a reservoir which has become shallow or initially was not deep. During the first phase, the reservoir plays a role as an accumulator of sediment, so that its trap efficiency for total mineral material is much reduced, and its trap efficiency for suspended load decreases to zero. This phase ends when the mean depth reaches a critical value which is specific for each reservoir. During the second phase, shallowing of the reservoir is much slower, and over short time periods it can play a role as a net exporter of sediment. A general model of reservoir sedimentation is proposed and is tested by data on the long-term and seasonal courses of siltation in selected reservoirs in the Vistula drainage basin, Poland. The rate of sedimentation is analysed for both phases of siltation, and the useful lifetime of a reservoir, which corresponds to the first phase of siltation, has been computed according to a methodology proposed.  相似文献   

18.
A 7-year sediment transport monitoring on the Upper Niger rivers was used to study the relationship between suspended sediment concentration and river discharge. During annual floods, these relationships show positive hysteresis. This paper presents the results of two models that estimate the time evolution of suspended sediment concentration using water discharge data only. The first model is based on a statistical approach using two relationships, one for the rising stage period of the flood and one for the recession period of the annual flood; the second model is a lumped conceptual one; it supposes that the sediment flux observed in the river comes from two different sources of sediment and that these two sources may be regarded as two different reservoirs. The erosion of the first reservoir represents hillslope erosion observed during the runoff season. Sediment supply from this ‘reservoir’ is limited in time because depletion occurs during the runoff season. The second reservoir is unlimited in time and quantity and its erosion represents contributions coming from bank erosion and mobilisation of deposits in the channel network.

Both of the models are compared with a simple rating curve based model. The model results show that the conceptual model has the highest efficiency to reproduce from weekly discharge only the time evolution of weekly suspended sediment concentrations, the time evolution of weekly sediment fluxes, and the global annual sediment yields.  相似文献   


19.
Abstract

A study on the suspended sediment transportation downstream from the Danjiangkou Reservoir in China has shown that the dynamics of suspended sediment grain size are complicated. During the period when the reservoir was used for flood retention, the suspended sediment median size decreased gradually; after entering the period when the reservoir was used for water storage, the median size started to increase, reaching a maximum, and then decreased again. These variations correspond to different stages of channel adjustment. At the stage with dominant downcutting, most of the downstream reservoir sediment comes from bed downcutting, and thus the suspended sediment median size becomes coarser and coarser; at the succeeding stage with dominant channel widening, a majority of the suspended sediment comes from bank erosion, and so its median size becomes finer. This phenomenon can be regarded as a reflection of the complex response of channel adjustment in the characteristics of suspended sediment transportation downstream from a reservoir.  相似文献   

20.
A sediment budget for an upland catchment–reservoir system at Burnhope Reservoir, North Pennines, UK has been developed. This provides a framework for quantifying historic and contemporary sediment yields and drainage basin response to disturbance from climate change and human activities in the recent past. Bathymetric survey, core sampling, 137Cs dating and aerial photographs have been used to assess sediment accumulation in the reservoir. The average reservoir sedimentation rate is 1·24 cm yr?1 (annual sediment yield 33·3 t km?2 yr?1 ± 10%, trap efficiency 92%). Mean annual reservoir sedimentation over the 67 year period has been estimated at 592 t ± 10%. Inputs of suspended sediment from direct catchwater streams account for 54% of sediment supply to the budget (best estimate yield of 318 t yr?1 ± 129%), while those from actively eroding reservoir shorelines contribute 328 t yr?1 ± 92%. Sediment yield estimates from stream monitoring and reservoir sedimentation are an order of magnitude lower than those reported from South Pennine reservoirs of comparable drainage basin area. Analysis of historical rainfall series for the catchment shows fluctuations in winter and summer rainfall patterns over the past 62 years. From 1976 to 1998 there has been a diverging trend between winter and summer rainfall, with a large increase in winter and a gradual decrease in summer totals. Periods of maximum variation occur during the summer drought events of the late 1970s, early 1980s and mid‐1990s. Analysis of the particle size of core sediments highlights abrupt increases in sand‐sized particles in the top 20 cm of the core. Based on the 137Cs chronology, these layers were deposited from the late 1970s onwards and relate to these diverging rainfall records and rapidly fluctuating reservoir levels. This provides evidence of potential sediment reworking within the reservoir by rapid water‐level rise after drought. Copyright © 2008 John Wiley & Sons, Ltd.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号