首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 447 毫秒
1.
《国际泥沙研究》2022,37(5):687-700
Globally, between 1950 and 2011 nearly 80,000 debris flow fatalities occurred in densely populated regions in mountainous terrain. Mitigation of these hazards includes the construction of check dams, which limit coarse sediment transport and in the European Alps number in the 100,000s. Check dam functionality depends on periodic, costly maintenance, but maintenance is not always possible and check dams often fail. As such, there is a need to quantify the long-term (10–100 years) geomorphic response of rivers to check dam failures. Here, for the first time, a landscape evolution model (CAESAR-Lisflood) driven by a weather generator is used to replicate check dam failures due to the lack of maintenance, check dam age, and flood occurrence. The model is applied to the Guerbe River, Switzerland, a pre-Alpine catchment containing 73 check dams that undergo simulated failure. Also presented is a novel method to calibrate CAESAR-Lisflood's hydrological component on this ungauged catchment. Using 100-year scenarios of check dam failure, the model indicates that check dam failures can produce 8 m of channel erosion and a 322% increase in sediment yield. The model suggests that after check dam failure, channel erosion is the remobilization of deposits accumulated behind check dams, and, after a single check dam failure channel equilibrium occurs in five years, but after many check dam failures channel equilibrium may not occur until 15 years. Overall, these findings support the continued maintenance of check dams.  相似文献   

2.
The effects of check dams on the bed stability of torrential channels have been analysed in several tributary basins of the Segura and Guadalentín rivers (South‐East Spain). In order to illustrate the large variability in channel bed‐forms and bed sediment sizes along the stream, 52 reaches of 150 m in length were surveyed. This variability is due to the behaviour of check dams, which depends on bedrock control, bed slope, channel roughness, lateral sediment input and a highly variable sediment transport capacity. Though the purpose of check dams is to diminish the boundary shear stress, reducing the longitudinal slope, and to stabilize the channel bed, downstream they reduce the volume of channel‐stored material, favouring local scour processes, and upstream they can destabilize the sidewalls. The results enable us to evaluate the impact of every check dam on the bed morphology, distinguishing the structures installed in limy marl areas (e.g. catchment of the Cárcavo rambla, Cieza) and in schist and slate terrains (e.g. catchment of the Torrecilla rambla, close to Lorca). In the first type, bedrock and moderately thick granular beds predominate downstream from the check dams, so that the length of bedrock reaches and increase of roughness due to scour processes are the best indicators to verify its geomorphological effectiveness. On the other hand, the metamorphic areas drained by ramblas and gullies produce great quantities of gravel that are retained by check dams, creating more uniform and permeable beds, where the balance between sedimentation and scouring, and the ratio τc84/τ0 (RBS), appear to be the parameters most frequently adopted to estimate the bed stability. Analysis of slope adjustments and the application of other indices to estimate the bed substrate stability (LRBS, SRI) and the structural influence of the dams (SIBS) corroborate the differences in bed stability found in the corrected reaches in each catchment. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

3.
In Mediterranean semi‐arid conditions, the availability of studies monitoring channel adjustments as a response to reforestation and check dams over representative observation periods, could help develop new management strategies. This investigation is an integrated approach assessing the adjustments of channel morphology in a typical torrent of southern Italy after land‐use changes and check dam construction across a period of about 60 years. A statistical analysis of historical rainfall records, an analysis of land‐use changes in the catchment area and a geomorphological mapping of channel adjustments were carried out and combined with field surveys of bed surface grain‐size over a 5‐km reach including 14 check dams. The analysis of the historical rainfall records showed a slight decrease in the amount and erosivity of precipitation. Mapping of land‐use changes highlighted a general increase of vegetal coverage on the slopes adjacent to the monitored reaches. Together with the check dam network installation, this increase could have induced a reduction in water and sediment supply. The different erosional and depositional forms and adjustments showed a general narrowing between consecutive check dams together with local modifications detected upstream (bed aggradation and cross‐section expansion together with low‐flow realignments) and downstream (local incision) of the installed check dams. Changes in the torrent bends were also detected as a response to erosional and depositional processes with different intensities. The study highlighted: the efficiency of check dams against the disrupting power of intense floods by stabilizing the active channel and the influence of reforestation in increasing hillslope protection from erosion and disconnectivity of water and sediment flows towards the active channel. Only slight management interventions (for instance, the conversion of the existing check dams into open structures) are suggested, in order to mobilize the residual sediment avoiding further generalized incision of the active channel and coast line erosion. Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   

4.
Dam removal has been demonstrated to be one of the most frequent and effective fluvial restoration actions but at most dam removals, especially of small dams, there has been little geomorphological monitoring. The results of the geomorphological monitoring implemented in two dams in the rivers Urumea and Leitzaran (northern Spain) are presented. The one from the River Urumea, originally 3.5 m high and impounding 500 m of river course, was removed instantaneously whereas that in the River Leitzaran, 12.5 m high, and impounding 1500 m of river course, is in its second phase of a four‐stage removal process. Changes in channel morphology, sediment size and mobility and river bed morphologies were assessed. The monitoring included several different techniques: topographical measurements of the channel, terrestrial laser scanner measurements of river bed and bars, sediment grain size and transport; all of them repeated in four (May, August, November 2011 and May 2012) and five (July and September 2013, April and August 2014 and June 2015) fieldwork campaigns in the River Urumea and River Leitzaran, respectively. Geomorphic responses of both dam removals are presented, and compared. Morphological channel adjustments occurred mainly shortly after dam removals, but with differences among the one removed instantaneously, that was immediate, whereas that conducted by stages took longer. Degradational processes were observed upstream of both dams (up to 1.2 m and 4 m in the River Urumea and River Leitzaran, respectively), but also aggradational processes (pool filling), upstream of Inturia Dam (2.85 m at least). Less evident aggradational processes were observed downstream of the dams (up to 0.37 m and 0.50 m in the River Urumea and River Leitzaran, respectively). Flood events, especially a 100 year flood registered during the monitoring period of Mendaraz Dam removal, reactivated geomorphological processes as incision and bank erosion, whereas longitudinal profile recovery, grain‐size sorting and upstream erosion took longer. Copyright © 2016 John Wiley & Sons, Ltd.  相似文献   

5.
Abstract

Reservoir silting is one of the principal problems affecting the performance of dams in Algeria from the standpoint of reservoir capacity for storage. Foum El Kherza Reservoir (also known as Foum El Gherza), near Biskra Town, Algeria, is subject to dredging operations with the intent of recovering 70% of its initial storage capacity of 47 hm3 (million cubic metres). The forecasting of sediment volume trapped in the reservoir is essential to plan the future use of this resource and to sustain irrigation for the palm groves characteristic of the region. However, there are currently no sediment data, nor a sediment rating curve, for predicting sediment inflow based on hydrological data. This paper describes the optimization of a cumulative trapped sediment curve for Foum El Kherza Reservoir based on 44 years of daily inflows, by using a spreadsheet optimization tool, Microsoft Excel® Solver to calibrate the cumulative sediment load against the cumulative sediment inflow as documented by eight bathymetric surveys since the dam construction.

Editor D. Koutsoyiannis; Associate editor A. Montanari

Citation Tebbi, F.Z., Dridi, H., and Morris, G.L., 2012. Optimization of cumulative trapped sediment curve for an arid zone reservoir: Foum El Kherza (Biskra, Algeria). Hydrological Sciences Journal, 57 (7), 1368–1377.  相似文献   

6.
《国际泥沙研究》2022,37(5):675-686
In the Brazilian drylands, there are tens of thousands of small dams. Despite their paramount importance to the rural population, they are rarely monitored. Water demand increases with time while, simultaneously, siltation reduces reservoir water capacity and availability. Reservoir siltation models are, therefore, mandatory to manage the numerous ungauged small dams in these drylands. The objective of the current study is to improve sediment trap efficiency (TE) modeling by including resuspension as a key probabilistic process. The Shannon entropy was used to estimate the sediment resuspension probability, which was merged with the Camp model and generated the RETSED entropy model. To validate the RETSED model, an experimental check dam (ECD, 300 m³), located in the Gilbués desertification site, Brazil, was monitored hourly during one hydrological year (July 2018–July 2019). Measurements show that the annual volumetric decline of the check dam was 12%; and that the average trap efficiency equaled 86%. Only 9.5% of the hourly sediment concentration outflow exceeded the average plus one standard deviation, showing that the reservoir is well mixed; a fact which highlights the relevance of the resuspension process. Three empirical models failed to mimic the experimental results: Churchill (TE = 99%), Brune (TE = 75%), and Maryland (TE = 94%). According to the RETSED entropy model, the resuspension probability during the experiment was 10% and TE = 81%, a value only 6% below the measured one. The Camp model simulated TE = 89%, only 3% higher than the measured value, but confirmed the Camp model's tendency to overestimate TE due to a disregard of resuspension. The deterministic model showed low sensitivity concerning the hydrodynamic effects, whereas the entropy formulation proved to be more consistent with physical behavior: the resuspension probability clearly increased and trap efficiency decreased with rising reservoir discharge.  相似文献   

7.
Sediment flushing and the morphological responses to the procedure of check dam removal are still unclear. Following laboratory experiments that revealed three stages (deepening, widening, and volume release) of check dam adjustment, a check dam built in 2007 at Landao Creek in central Taiwan was adjusted in 2015 by removing central bars and cutting 2.5 m from the middle two piers (stage 1 + 2), with the purpose of regulating sediment transfer and keeping the thalweg at the center of the channel, while also preventing hill slope toe erosion. In 2019, four central piers were removed (stage 3) to increase the volume of sediment released. Annual surveys were conducted after the initial adjustment in 2015 through to 2020 using unmanned aerial vehicles (UAVs). The check dam adjustments revealed that the channel had narrowed and stabilized as indicated by regenerating riparian vegetation. Additionally, distinct terraces had formed on the hill slope toes of the creek channel in proximity to the check dam. The meander upstream weakened following the dam adjustments. This study combining laboratory experiments with actual field observation contributed immensely to check dam decommissioning. Additionally, this study illustrated how an adjustable check dam may aid regulation of sediment transport and thereby sediment balance. It can be adjusted accordingly based on the prevailing channel condition.  相似文献   

8.
Severe soil erosion occurs on the Loess Plateau in China, which makes the Yellow River the most sediment-laden river in the world. Construction of about 60,000 sediment check dams has remarkably controlled soil erosion on the Loess Plateau and reduced the sediment load of the middle and lower Yellow River. Nonetheless, little is known about the mechanism of erosion control and vegetation development of sediment check dams. The function of a single check dam mainly is trapping sediment, while the function of a train of check dams comprising dozens of or over hundreds of check dams in a gully encompasses controlling bed incision and reducing erosion energy. A formula was proposed to calculate the potential energy of bank failure and slope failure in a gully, which essentially constitutes the erosion energy. The erosion energy increases when gully incision occurs, which is induced by the incision of the Yellow River and its tributaries on the Loess Plateau. Sediment deposition in many gullies due to construction of check dams reduces the erosion energy to almost zero, which in turn greatly reduces soil erosion and sediment yield. Construction of check dams promotes vegetation development. The vegetation-erosion dynamics model was used to study the effect of check dams on vegetation development. Simulation results show that reforestation without check dam construction might result in an increase of vegetation cover in the first ten years and then a drop of vegetation cover to less than 10% in the later years. The check dams provide a foundation for vegetation development.  相似文献   

9.
There are two kinds of Sabo dams in order to control sediment transport by debris flow and flash floods in mountainous area, which are closed and open-type's dams. In Japan, open-type's Sabo dams are constructed taking into account the continuity of sediment routing from upstream to downstream reach in a basin. A plan to construct a 20 m high grid-type Sabo dam which can capture a sediment volume of 400,000 m3 is proposed in the Amahata river basin in Japan. Hydraulic model tests are conducted to decide on the section for a dam (Section A, B) and the grid size such as clearance of vertical/horizontal bars for evaluating the plan. Several runs of flume tests are conducted and the sediment control function of the Sabo darn is discussed using several experimental data such as dimensionless sediment runoff rate from Sabo dam, temporal changes of bed profile and mean diameter and so on. It was found that sediment deposition in sediment storage area of Sabo dam was affected by curved channel, and that next the grid size of steel bars and thirdly the section of a dam was able to capture sediment in storage area of Sabo dam. Sediment was controlled well in the section B and in the grid size of 1.0×d95, and the problems related to sediment runoffafter sediment capturing in Sabo dam are pointed out.  相似文献   

10.
Mining is the largest producer of solid wastes which, when released to land or into waterways, can cause harmful environmental impacts. This is mostly due to fluvial erosion, which is highly increased in mountain areas, due to abrupt slopes. We have analysed this situation at a mountain watershed (192 ha), where steep mined sites and their waste dumps are the main source of sediment in a Natural Park. This problem was tackled by building gabion check dams downstream from the mined sites. We used the DEM of Differences (DoD) method to quantify erosion and sediment yield from three waste dumps (5 ha). Their topography and substrate properties were analysed to understand the erosion problem. The sediment trapped by the check dams was quantified by electrical resistivity tomography (ERT). The rainfall characteristics triggering an episode that filled the check dams with sediment in the winter 2009–2010, were studied to confirm whether it was a case of extreme precipitation conditions. The waste dumps sediment yield (353 ± 95 Mg ha?1 yr?1) suggests severe landform instability. Analysis of topographic and substrate properties confirmed long, steep slopes combined with highly erodible materials. The check dams proved to be inefficient in controlling sediment loads, as they had only functioned for four years of 31 of existence, having trapped 13 000 ± 660 m3 of sediment, whereas we estimated that the waste dumps have yielded approximately three times more sediment for the same period. Rainfall analyses showed that neither intense nor extreme conditions (return period of 25 to 35 years) triggered the mobilization of 37 ± 2 Mg ha?1 in a month. This study highlights the fact that mining operations in similar mountainous settings, with equivalent waste dump construction and reclamation practices, are currently unfeasible. We conclude that landform stability cannot be achieved at this site without landform changes. Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   

11.
Extensive land use changes have occurred in many areas of SE Spain as a result of reforestation and the abandonment of agricultural activities. Parallel to this the Spanish Administration spends large funds on hydrological control works to reduce erosion and sediment transport. However, it remains untested how these large land use changes affect the erosion processes at the catchment scale and if the hydrological control works efficiently reduce sediment export. A combination of field work, mapping and modelling was used to test the influence of land use scenarios with and without sediment control structures (check‐dams) on sediment yield at the catchment scale. The study catchment is located in SE Spain and suffered important land use changes, increasing the forest cover 3‐fold and decreasing the agricultural land 2·5‐fold from 1956 to 1997. In addition 58 check‐dams were constructed in the catchment in the 1970s accompanying reforestation works. The erosion model WATEM‐SEDEM was applied using six land use scenarios: land use in 1956, 1981 and 1997, each with and without check‐dams. Calibration of the model provided a model efficiency of 0·84 for absolute sediment yield. Model application showed that in a scenario without check dams, the land use changes between 1956 and 1997 caused a progressive decrease in sediment yield of 54%. In a scenario without land use changes but with check‐dams, about 77% of the sediment yield was retained behind the dams. Check‐dams can be efficient sediment control measures, but with a short‐lived effect. They have important side‐effects, such as inducing channel erosion downstream. While also having side‐effects, land use changes can have important long‐term effects on sediment yield. The application of either land use changes (i.e. reforestation) or check‐dams to control sediment yield depends on the objective of the management and the specific environmental conditions of each area. Copyright © 2008 John Wiley & Sons, Ltd.  相似文献   

12.
Coarse sediment retention by check dams is analyzed for five typical catchments in the Hekou-Longmen section of the midstream of the Yellow River, which is an area of high .coarse sediment concentration. The catchments are the Huangfuchuan, Kuye, Wuding, Sanchuan and Qiushui River Basins. The amount of coarse sediment retained by check clams in these areas for different periods was measured. Sediment reduction due to check clams is compared with other soil conservation measures and the results show that check clams are the most effective to rapidly reduce the amount of coarse sediment entering the Yellow River. If the average percentage of the drainage area with check clams for the five typical catchments reaches 3.0%, the average sediment reduction ratio can reach 60%. Therefore, to rapidly and effectively reduce the amount of sediment, especially coarse sediment, entering the Yellow River, the area percentage of check clams in the Hekou-Longmen section should be kept around 3%. The Kuye and Huangfuchuan River Basins are the preferred main catchments in which such water conservation measures are implemented.  相似文献   

13.
Time lag between reduction of sediment supply and coastal erosion   总被引:1,自引:0,他引:1  
The disruption of sediment supply from river to coast by dam development has been a topic of global concern.In Japan,among the top 30 dams in terms of height,14 dams were constructed prior to 1970 and another 6 dams before 1980.However,the coastline erosion did not surface up as a grievous problem until the 1980s.According to the River Bureau of Japan,the overall erosion rate along the coastline of Japan was 0.72×10~6 m~2/yr prior to 1980,but sharply increased to 1.6×10~6 m~2/yr since 1980.Therefore,there was a time lag between the disruption of sediment supply by dam and beach erosion.This paper presents a case study on what may have delayed the response of beach to the effect of dam construction.  相似文献   

14.
DESIGN OF SLIT DAMS FOR CONTROLLING STONY DEBRIS FLOWS   总被引:3,自引:0,他引:3  
1 INTRODUCTION Stony debris flows are natural, highly concentrated water-sediment mixture, which forms wherever the simultaneous availability of water, debris material and an adequate slope, steeper than o10 are satisfied (Gregoretti, 2000). In mountainous regions of Taiwan, due to vast development and utilization of hills, stony debris flows are important from the point of disaster prevention, since they occur frequently and often bring about heavy loss of lives and properties. Therefo…  相似文献   

15.
Check dam has become an efficient measure to control sediment transport and soil erosion in the gully areas. It plays an important role in soil erosion control and agricultural production in the Loess Plateau. Due to construction of numerous check dams, it is necessary to assess the impact of check dams on runoff and sediment load at basin scale. This study applied the SWAT model to simulate monthly runoff and sediment load in the Huangfuchuan basin in the middle reaches of the Yellow River. Twenty key check dams are coupled to the SWAT model simulation in the calibration (1978–1984) and validation period (1985–1989). The determination coefficient (R 2) and the Nash–Sutcliffe coefficient (NS) were 0.94 and 0.83 for runoff, and 0.82 and 0.81 for sediment load in the calibration period, respectively. During the validation period, the R 2 and NS were 0.93 and 0.80 for runoff, and 0.90 and 0.83 for sediment load respectively. The results showed that the model simulation was acceptable. Subsequently, the calibrated model was used to examine the effect of check dams on runoff and sediment load between 1990 and 2012. It showed that the increasing check dams contributed 24.8 and 27.7% to the decrease of annual runoff and sediment load during the period of 1990–1999, whereas it reached up to 65.2% for runoff decline and 78.3% for sediment load reduction within 2000–2012. Overall, this study illustrated a case study of the dominant role of check dams on variation of runoff and sediment load in the Huangfuchuan basin.  相似文献   

16.
《国际泥沙研究》2020,35(4):408-416
The magnitude of soil erosion and sediment load reduction efficiency of check dams under extreme rainstorms is a long-standing concern. The current paper aims to use check dams to deduce the amount of soil erosion under extreme rainstorms in a watershed and to identify the difference in sediment interception efficiency of different types of check dams. Based on the sediment deposition at 12 check dams with 100% sediment interception efficiency and sub-catchment clustering by taking 12 dam-controlled catchments as clustering criteria, the amount of soil erosion resulting from an extreme rainstorm event on July 26, 2017 (named “7·26” extreme rainstorm) was estimated in the Chabagou watershed in the hill and gully region of the Loess Plateau. The differences in the sediment interception efficiency among the check dams in the watershed were analyzed according to field observations at 17 check dams. The results show that the average erosion intensity under the “7–26” extreme rainstorm was approximately 2.03 × 104 t/km2, which was 5 times that in the second largest erosive rainfall in 2017 (4.15 × 103 t/km2) and 11–384 times that for storms in 2018 (0.53 × 102 t/km2 - 1.81 × 103 t/km2). Under the “7–26” extreme rainstorm, the amount of soil erosion in the Chabagou watershed above the Caoping hydrological station was 4.20 × 106 t. The sediment interception efficiency of the check dams with drainage canals (including the destroyed check dams) and with drainage culverts was 6.48 and 39.49%, respectively. The total actual sediment amount trapped by the check dams was 1.11 × 106 t, accounting for 26.36% of the total amount of soil erosion. In contrast, 3.09 × 106 t of sediment were input to the downstream channel, and the sediment deposition in the channel was 2.23 × 106 t, accounting for 53.15% of the total amount of soil erosion. The amount of sediment transport at the hydrological station was 8.60 × 105 t. The Sediment Delivery Ratio (SDR) under the “7·26” extreme rainstorm was 0.21. The results indicated that the amount of soil erosion was huge, and the sediment interception efficiency of the check dams was greatly reduced under extreme rainstorms. It is necessary to strengthen the management and construction technology standards of check dams to improve the sediment interception efficiency and flood safety in the watershed.  相似文献   

17.
The storage capacity of reservoirs is gradually reduced due to sediment accumulation that causes changes in the area-storage capacity (ASC) curves.Establishing these curves and predicting their future change is an important issue for planners,designers and operators of dams.Many empirical and semiempirical approaches have been suggested for establishing and predicting the future changes for these curves.In this study four empirical and semi-empirical methods were evaluated and three of them were modified to be used for the prediction of changes in the ASC curves due to sedimentation,based on the existing sedimentation survey data for 11 reservoirs in the USK For evaluation,these approaches were reviewed and used to determine sedimentation depth and establishing the ASC curves for the Mosul dam reservoir (MDR),which is the biggest hydraulic structure on the River Tigris in northern Iraq.MDR started operating in 1986 with a storage capacity of 11.11 km3 and a water surface area 380 km2 at normal operation stage (330 m a.s.l.).The results obtained from these methods were evaluated using observed bathymetric survey data that had been collected in 2011 after 25 years of the operation of the dam.The evaluation results showed three methods had presented more accurate results for estimating water depth or sedimentation depth at dam site with percentage error about 1.06-3.30%.Whilst for establishing ASC curves,one method presented good agreement result with survey data.Furthermore,ASC and sedimentation depths at dam site of MDR for periods 50,75,100 and 125 years were estimated using the modified approaches and the area reduction method.The results of the modified methods provided reasonable agreement when compared with the area reduction method proposed by the U.S.Bureau of Reclamation and the agreement became better with an increase in time period.  相似文献   

18.
The structure and dynamics of vegetation in valley bottoms are both strongly associated with fluvial processes and landform dynamics. All of these associations are disrupted by the installation of engineering control works. We use survey and analysis methods developed previously to investigate the impact of the installation of check‐dams within the confined headwaters of steep seasonally‐flowing streams (fiumaras) in Calabria, southern Italy, on active channel form, sediment calibre, and the richness, cover and development of riparian vegetation. Based on detailed field measurements along transects across the active channel, estimates of indices of vegetation extent (GCC), development (WCH) and their cross‐sectional variability (coefficients of variation of both indices at each survey site CVGCC, CVWCH), the number of species present (Ns), channel shape (w/d – the width/depth ratio), cross‐sectional area (CSA), downstream gradient (slope), surface bed sediment calibre (D50) and subsurface fine sediment content (percentage less than 250 µm by weight) were obtained for 60 transects located immediately upstream (U), downstream (D) and at intermediate sites (I) around 20 check‐dams located in four different headwater catchments. Analysis of this data set suggests that statistically significant changes in channel form and sediment calibre upstream of check‐dams are associated with more consistent vegetation development across the active channel, including an increase in species richness relative to other transects, but notable increases in vegetation cover and development only arise where the physical characteristics of the channel are notably different from intermediate and downstream channels. Because of the naturally steep profile of the study torrents, intermediate sections between check‐dams tend to be more similar in form to channels located immediately downstream of check‐dams than those located upstream, leading to similar structural properties in the riparian vegetation. The intermediate transects support considerably more species than downstream reaches, but the conditions upstream of the check‐dams appear to be so favourable for riparian vegetation development that species richness exceeds that found in intermediate reaches. Despite the confined headwater locations, these contrasts in form, sediment and vegetation development around check‐dams are strong and consistent across the study catchments, over‐riding more subtle contrasts in species richness and sediment calibre between catchments. Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

19.
Large dam construction for irrigation, hydropower, water supply, and flood control in tropical to sub-tropical areas increased markedly after 1950. Many of the dams built during this period have filled with sediment and no longer perform to their original design specifications; in many cases, forecast dam life was greatly overestimated. This study investigates the useful life of Burdekin Falls Dam (BFD), northeastern Australia and compares the findings with other tropical reservoirs. Using two independent methods it is estimated that between 61 and 65 million m3 of sediment has been deposited in the reservoir over the 24 years of operation through 2011. This sediment volume equates to an average of 0.15% of capacity lost per year since construction was completed. If current sediment loads/climate regimes persist, reservoir capacity will be reduced by 50% after 345 years. However, the useful life of the BFD reduces to just 276 years when drawdown data are considered; these data show reservoir use would be affected once 40% of storage was filled with sediment, with a 60% drawdown return period of 1 in 15 years. When compared to similar large tropical to sub-tropical reservoirs, the BFD has a slightly longer reservoir useful life than dams in India and a much longer half-life than for both similar-sized and larger dams in China, Brazil, and Iran. Properties of the BFD that promote a longer useful life include a lower trap efficiency, relatively low annual sediment load delivered to the reservoir, limited sediment deposition behind the dam wall (and uniform distribution of deposited sediment), and the export of highly turbid annual floodwaters before settling and deposition of any remaining sediment within the reservoir.  相似文献   

20.
Risk analysis for clustered check dams due to heavy rainfall   总被引:7,自引:1,他引:6  
Check dams are commonly constructed around the world for alleviating soil erosion and preventing sedimentation of downstream rivers and reservoirs.Check dams are more vulnerable to failure due to their less stringent flood control standards compared to other dams.Determining the critical precipitation that will result in overtopping of a dam is a useful approach to assessing the risk of failure on a probabilistic basis and for providing early warning in case of an emergency.However,many check dams are built in groups,spreading in several tributaries in cascade forms,comprising a complex network.Determining the critical precipitation for dam overtopping requires a knowledge of its upstream dams on whether they survived or were overtopped during the same storm,while these upstream dams in turn need the information for their upstream dams.The current paper presents an approach of decomposing the dam cluster into(1)the heading dam,(2)border dams,and(3)intermediate dams.The algorithm begins with the border dams that have no upstream dams and proceeds with upgraded maps without the previous border dams until all the dams have been checked.It is believed that this approach is applicable for small-scale check dam systems where the time lag of flood routing can be neglected.As a pilot study,the current paper presents the analytical results for the Wangmaogou Check Dam System that has 22 dams connected in series and parallel.The algorithm clearly identified 7 surviving dams,with the remaining ones being overtopped for a storm of 179.6 mm in 12 h,which is associated with a return period of one in 200 years.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号