1.
Flushing sediment through a reservoir has been practiced successfully and found to be inexpensive in many cases. However, the great amount of water consumed in the flushing operation might affect the water supply. To satisfy the water demand and water consumed in the flushing operation, two models combining the reservoir simulation model and the sediment flushing model are established. In the reservoir simulation model, the genetic algorithm (GA) is used to optimize and determine the flushing operation rule curves. The sediment‐flushing model is developed to estimate the amount of the flushed sediment volume, and the simulated results update the elevation‐storage curve, which can be taken into account in the reservoir simulation model. The models are successfully applied to the Tapu reservoir, which has faced serious sedimentation problems. Based on 36 years historical sequential data, the results show that (i) the simulated flushing operation rule curves model has superior performance, in terms of lower shortage index (SI) and higher flushing efficiency (FE), than that by the original reservoir operation; (ii) the rational and riskless flushing schedule for the Tapu reservoir is suggested to be set within an interval of every 2 or 4 years in the months of May or June. Copyright © 2003 John Wiley & Sons, Ltd.  相似文献   

2.
1 INTRODUCTIONIn recent years, the concePt of long-term sustained use of reservoirs has been addressed because areservoir is very much considered to be a nonrenewable resource (Morris and Fan, l998). Technically,many options for reservoir sedAnentation control can be utlized to pursue the sustainable develoPment ofwater resources. In general, reduction of incoming sedimen yields from watersheds is often emPloyedin conjunction with hydraulic methods such as flushing or density currnt vot…  相似文献   

3.
Large dam construction for irrigation, hydropower, water supply, and flood control in tropical to sub-tropical areas increased markedly after 1950. Many of the dams built during this period have filled with sediment and no longer perform to their original design specifications; in many cases, forecast dam life was greatly overestimated. This study investigates the useful life of Burdekin Falls Dam (BFD), northeastern Australia and compares the findings with other tropical reservoirs. Using two independent methods it is estimated that between 61 and 65 million m3 of sediment has been deposited in the reservoir over the 24 years of operation through 2011. This sediment volume equates to an average of 0.15% of capacity lost per year since construction was completed. If current sediment loads/climate regimes persist, reservoir capacity will be reduced by 50% after 345 years. However, the useful life of the BFD reduces to just 276 years when drawdown data are considered; these data show reservoir use would be affected once 40% of storage was filled with sediment, with a 60% drawdown return period of 1 in 15 years. When compared to similar large tropical to sub-tropical reservoirs, the BFD has a slightly longer reservoir useful life than dams in India and a much longer half-life than for both similar-sized and larger dams in China, Brazil, and Iran. Properties of the BFD that promote a longer useful life include a lower trap efficiency, relatively low annual sediment load delivered to the reservoir, limited sediment deposition behind the dam wall (and uniform distribution of deposited sediment), and the export of highly turbid annual floodwaters before settling and deposition of any remaining sediment within the reservoir.  相似文献   

4.
Although water and soil conservation activities reduce reservoir sedimentation, it is inevitable that reservoirs fed by rivers transporting high amounts of sediment will experience sedimentation. The Ghezel-Ozan and Shah-Roud rivers, which flow to the Sefld-Roud reservoir dam, are both highly sediment-laden and transport significant amounts of sediment in both bed load and suspended load forms to the reservoir. Hence, it seems that the only practical way to remove the sediment from the reservoir is to flush it out using the Chasse method. In the present paper, field measurements of Chasse operation characteristics taken in previous years are presented, and a numerical model that simulates this process is introduced. After calibrating the model using field measured data, the calculated results (for reservoir pressure flushing and released sediment volume) of the numerical model were compared with other measured data for the same Chasse operation and the results agree well. Finally, using the numerical simulation results, the best approaches to ensure highly effective flushing while conserving reservoir water are presented (at least for the Sefid-Roud dam). The operation of the bottom outlet gates, the shape of the output hydrograph, and the reservoir water level variation during flushing were optimized. In addition, the numerical model and related parameters, which need to be calibrated, are discussed.  相似文献   

5.
For the conservation and restoration of river environment,a sediment replenishment technique, which conveys a part of the sediments excavated and/or dredged from reservoirs to the river below dams is developed and has been implemented tentatively in several dams.Sediments placed as replenishment can be flushed out and transported downstream by floodwater or dam releases.The flushed sediments are expected to contribute to the control of degradation and the variation of the low-flow channel.However,this technique is in the development stage because there are many unknown factors.Therefore,systematic investigations are necessary for practical management of the technique.In this study,the effects of the location of replenishment sediment on sediment flushing and on control of degradation were investigated by means of flume experiments.A two-dimensional numerical model was also developed to further investigate the effects of sediment augmentation on river restoration.The numerical model treats bank erosion and sediment transport over fixed beds. The simulation results were verified against the experimental results.The flushing process of replenishment sediment was investigated first,and then its effect as a countermeasure for river bed degradation was analyzed.Results are summarized as follows:(1) Augmentation at upper riffles is effective for flushing of replenishment sediment and variation of low-flow channel.(2) Amelioration of degradation can be found in the cases of two types of placement.The amelioration effect of upper riffle placement was larger than that of lower riffle placement(3) Aggradation rate of the bed near the replenishment site in the fixed bed is large in the lower riffle placement compared with the upper riffle placement.(4) The numerical model was found to be generally successful as a predictive tool.  相似文献   

6.
In 1937, the US Army Corps of Engineers cut through the “neck” of a large meander on the lower Mississippi River (below the confluence with the Ohio River) forming the Caulk Neck cutoff and creating Lake Whittington, a 26‐km long oxbow lake, in northern Mississippi. Since 1938, seasonal flooding and a boat channel connecting the lake with the Mississippi River have led to sediment accumulation in the lake, resulting in an 80‐year record of sediment quality in the river. On the basis of an age‐dated sediment core from the lake, trends in trace metals and hydrophobic organic compounds (except polycyclic aromatic hydrocarbons) follow well‐known patterns with upward trends from the 1930s to the ca 1970s, followed by downward trends to the present. Two factors contribute to these patterns: reservoir construction and changes in emissions. The construction of seven large reservoirs on the Missouri River, in particular the closure of the Fort Randall (1953) and Gavins Point (1955) Dams, greatly reduced the load of relatively clean sediment to the Mississippi River, likely contributing to downstream increases in contaminant concentrations in the Mississippi River. Increasing anthropogenic emissions also contributed to upward trends until ca 1970 when major environmental policy actions began resulting in broad decreases in emissions and downward trends in the concentrations of most of the contaminants monitored. Polycyclic aromatic hydrocarbons and phosphorus are partial exceptions to this pattern, with increases to the 1960s and variable concentrations showing no clear trend since. Published 2012. This article is a U.S. Government work and is in the public domain in the USA.  相似文献   

7.
I INTRODUCTIONThe number of dam constructions has increased during the last decades, pafticularly in the tropics andsemi-arid areas where high sediment yields are prominent, and therefore also the problems of reservoirsedimentation. In 1900 there were 42 large dams, i.e. higher than 15 m, while in 1950 and 1986 therewere 5,268 and about 39,000 respectively (ICOLD, 1988). In the period 1975 to 1990, the regions withthe largest increase of large dams were Central and South America, Asia …  相似文献   

8.
A controlled reservoir release from Llyn Celyn to the Afon Tryweryn, Wales, U.K., has been used to study suspended load and turbidity variations. Turbidity was monitored continuously at two sites and 235 suspended solids samples were obtained at these and three additional sites during the passage of the release wave. The results are compared with data for a natural tributary flood event. The reservoir release data relate to sediment source depletion and reflects changing sources along the channel. Close to the dam, fine organic matter dominates the seston which scanning electron microscopy revealed to be predominantly allochthonous organic matter, with algal fragments and inorganic diatom frustules, derived from the periphyton of the channel bed. Coulter Counter analysis showed the seston to be relatively coarse with a median particle-size of 20 μm. Within 3 km of the dam, however, minerogenic particles dominate the sediment load of which more than 90 per cent is finer than 10 μm. This represents the flushing of channel-bed accumulations derived from tributary sources. The relationships between suspended sediment concentration and turbidity during the release are characterized by a marked, anticlockwise hysteresis. This contrasts with the clockwise hysteresis for the tributary flood event, but the different relationships cannot be explained by particle-size variations alone; seston composition also appears to be an important control.  相似文献   

9.
SUSTAINRESERVOIRUSEFULLIFEBYFLUSHINGSEDIMENT¥HsiehWenShenandJihn-SungLai(Professor,UniversityofCaliforniaatBerkeley,Departmen...  相似文献   

10.
IINTRODUCTIONByutilizingthenatUralpowerofflow,hydraulicflushingisaneconomicaltechniquetoremovethedepositedsedimentineitherasettlingbasinorareservoir.Inmanyreservoirsaroundtheworld,hydraulicflushinghasbeenprovenasaneffectivemethodtosustainthereservoirstoragecapacity.Hydraulicflushingprocessesmayinvolveboththeprocessesofscouringpreviousdepositsandpassingincomingsediment-ladenflow,suchasgravitycurrent,throughareservoirtobereleased.Inthisarticle,onlytheformercaseisdiscussed.Thekeythinginthef…  相似文献   

11.
1 INTRODUCTIONBed aggradation and degradation haPpen to be the most imPOrtant aspects of the alluvial processes instreams if the equilibrium conditions among water discharge, sediment flow, and channel shaPe areclistuIbed by natural or man-made factOfs, e.g., the constrUchon of a dam, change in the sediment suPplyrate, or base level changing. Reliable and quanhtative estimation of the bed aggradation or degradation isimPortant in rivertalning engineering and water management projects. …  相似文献   

12.
《国际泥沙研究》2023,38(5):698-710
Every dam or barrage construction affects the watercourse and the retention of sediment that previously was carried by the river, which can lead to siltation of the reservoir and obstruction of water intakes over time, reducing their capacities. However, the information available regarding the effect of sediment and drawdown parameters, sediment management at reservoirs, as well as different equational approaches, is scarce. The current research aims to evaluate the effect of parameters associated with numerical modeling of sediment management in reservoirs considering scenarios with different drawdowns, transport equations, sediment size distributions, and thickness of the initial sediment layer. The case study of the Aimorés Hydropower Plant (HPP) is used, applying the Delft3D-FLOW model for two-dimensional modeling. All parameters influenced the volume of mobilized sediment, among which the initial layer thickness was the parameter that resulted in the greatest changes in simulated results. In general, the results show that the uncertainties in the input parameters outweigh the uncertainties between the techniques, which found large variations in results when evaluating the use of different transport equations. These results indicate the importance of proper estimation of model parameters for predicting effects with accuracy and the need for such studies before planning and management operations are evaluated to avoid environmental harm and energy waste.  相似文献   

13.
The Tehri Dam is located in a seismotectonically active region in the Indian Himalayan belt. This 260.5 m high dam has a live water storage of 2615 × 106 m3 and is capable of generating crustal deformation corresponding to water fluctuation. Filling of the reservoir started in October 2005. Seismic data around the dam between 2000 and 2010 shows that seismicity is corresponding to drawdown levels of the reservoir rather than to higher water levels. GPS data at twelve local benchmarks were collected from 2006 to 2008 during filling and drawdown reservoir levels. The velocity vectors show ground motion to be between ~0.69–1.50 mm in the different filling-drawdown cycles with reference to the permanent station at Ghuttu. The motion appears to be inwards into the reservoir when the reservoir is filled and outwards when the reservoir is drained. This ground motion corresponds to elastic deformation and rebound due to effect of the oscillating water levels.  相似文献   

14.
1 INTRODUCTIONNdsral rivers entering reservoirs carry also sediment, partly as bedload and patly in suspension. At theentrance of the reservoir flow velocity is considerably reduced and the capability of sediment transport isdrashcally fading. Bedload maerial is deposited totally at the reservoir entrance fondng a delta, material...in suspension is cAned further intO the reservoir ulh.. it is partly deposited and partly dischargedthrough the dam towards downstreaxn (depending on the trapp…  相似文献   

15.
Cohesive sediment dynamics in mountainous rivers is poorly understood even though these rivers are the main providers of fine particles to the oceans. Complex interactions exist between the coarse matrix of cobble bed rivers and fine sediments. Given that fine sediment load in such environments can be very high due to intense natural rainfall or snowmelt events and to man‐induced reservoir or dam flushing, a better understanding of the deposition and sedimentation processes is needed in order to reduce ecohydrological downstream impacts. We tested a field‐based approach on the Arc and Isère alpine rivers combining measurements of erosion and settling properties of river bed deposits before and after a dam flushing, with the U‐GEMS (Gust Erosion Microcosm System) and SCAF (System Characterizing Aggregates and Flocs), respectively. These measurements highlight that critical shears, rates of erosion, settling velocities and propensity of particles to flocculate are highly variable in time and space. This is reflective of the heterogeneity of the hydrodynamic conditions during particle settling, local bed roughness, and nature and size of particles. Generally the deposits were found to be stable relative to what is measured in lowland rivers. It was, however, not possible to make a conclusive assessment of the extent to which the dynamics of deposits after reservoir flushing were different from those settled after natural events. The absence of any relationships between erosion and deposition variables, making it impossible to predict one from another, underlined the need to measure all of them to have a full assessment of the fine sediment dynamics and to obtain representative input variables for numerical models. While the SCAF was found to be effective, an alternative to the U‐GEMS device will have to be found for the erodibility assessment in cobble bed rivers, in order to make more rapid measurements at higher shears. Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   

16.
1 INTRODUCTION 1. 1 Dam Removal The aging of the more than 75,000 dams in the U.S., coupled with the increasing awareness of their environmental costs, has made dam decommissioning and removal a topic of current interest to the scientific community, management agencies, and the general public. It is estimated that 85% of the dams in the U.S. will be near the end of their operational lives by the year 2020 (FEMA, 1999), necessitating thorough consideration of dam removal or repair for…  相似文献   

17.
In this paper, a systematic investigation into the effect of both the type of impervious members and the reservoir bottom sediment on the dynamic response of embankment dams has been carried out using the finite and infinite element coupled method. It has been demonstrated from the numerical results that: (1) the resonant frequencies of an embankment dam—foundation system with an upstream inclined concrete apron are different from those with a central clay core; (2) the type of impervious members has a significant influence on the amplification factors of the system in the low frequency range of excitation, but has little effect in the high frequency range of excitation; (3) the foundation material of an embankment dam affects the dynamic response of the dam drastically; (4) the inclusion of the reservoir bottom sediment has a considerable effect on amplification factors of embankment dams in the case of P-wave incidences, but has little influence in the case of SV-wave vertical incidences; and (5) the reservoir bottom sediment also has a profound effect on the deformed shape of the embankment dam for both P-wave and SV-wave incidences.  相似文献   

18.
分析了河北西大洋水库沉积物中16种多环芳烃的含量及分布状况,并对其来源和生态风险进行了分析和评估.结果表明,表层沉积物多环芳烃总含量范围在422.36 - 1052.90 ng/g之间,且由库区上游到坝前逐渐升高.水库剖面沉积物中多环芳烃总含量在388.81 - 1205.56 ng,/g之间,自底层20 cm到表层多...  相似文献   

19.
The absorption of hydrodynamic pressure waves at the reservoir bottom has dominant effects on the structural response of the dam when subjected to ground motion. In the present study, a model is proposed for the absorption effects of the reservoir bottom in the earthquake analysis of dams. The model utilizes the wave reflection coefficient approach and is based on the solution of the wave equation in a sediment layer of viscoelastic material with a constant thickness overlying an elastic, semi-infinite foundation. Numerical studies were conducted to evaluate the effect of the sediment layer thickness and material properties as well as the effect of reflection of waves from the underlying rock. It is shown that the current approach of assuming the wave reflection coefficient at the reservoir bottom based on the characteristics of the sediment material and excluding the effect of the reflected waves from the underlying rock, may significantly underestimate the seismic response of the dam.  相似文献   

20.
This study examines the effect of drawdown on the timing and magnitude of suspended solids and associated phosphorus export from a 12 ha reservoir located in an urbanized watershed in southern Ontario, Canada. Water level in Columbia Lake was lowered by 1·15 m over a 2‐week period in November 2001. The total phosphorus (TP) concentrations ranged from 63 to 486 µg L?1 in Columbia Lake and 71 to 373 µg L?1 at its outflow. All samples exceeded the Provincial Water Quality Objective of 30 µg TP L?1. Outflow concentrations of suspended solids and TP increased significantly with decreasing lake level and were attributed to the resuspension of cohesive bottom sediments that occurred at a critical threshold lake level (0·65 m below summer level). Suspended solids at the outflow consisted of flocculated cohesive materials with a median diameter (D50) of c. 5 µm. Particulate organic carbon accounted for 8·5% of the suspended solids export by mass. A total mass of 18·5 t of suspended solids and 62·6 kg TP was exported from Columbia Lake, which represents a significant pulse of sediment‐associated P to downstream environments each autumn during drawdown. The downstream impacts of this release can be minimized if the water level in Columbia Lake is lowered no more than 0·5 m below summer levels. Copyright © 2004 John Wiley & Sons, Ltd.  相似文献   