首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 109 毫秒
1.
DESIGN OF SLIT DAMS FOR CONTROLLING STONY DEBRIS FLOWS   总被引:3,自引:0,他引:3  
1 INTRODUCTION Stony debris flows are natural, highly concentrated water-sediment mixture, which forms wherever the simultaneous availability of water, debris material and an adequate slope, steeper than o10 are satisfied (Gregoretti, 2000). In mountainous regions of Taiwan, due to vast development and utilization of hills, stony debris flows are important from the point of disaster prevention, since they occur frequently and often bring about heavy loss of lives and properties. Therefo…  相似文献   

2.
Blocking is one of the important features when a beam dam intercepts debris flow, while self-cleaning is another when managing suspended debris flow. Both features determine the debris flow control benefits of beam dam but the latter often is not considered in practical engineering design. In this paper, a series of specially designed flume experiments were done to simulate blocking and self-cleaning processes. The blocking ratio and deposition features were measured to contrast the blocking and self-cleaning performance before and after artificial self-cleaning. The experimental results reveal that the beam dam net opening, particle diameter of sediment, sediment concentration, and gradient of the channel are the main factors affecting blocking performance. A new criterion of blocking performance of beam dams that considers the interaction of multiple factors and can provide guidance to practical project design is proposed. For all three types of blocking, sediment deposited upstream of a beam dam can be effectively transported downstream by erosion from post-debris-flow floods, Self-cleaning performance is most efficient for temporary blocking, followed by partial-blocking, and total-blocking. The efficiency of self-cleaning largely depends on the change of the sediment deposit due to erosion. Finally, a discussion is given for the optimal design of an open-type check dam and the feasibility of synergistic effects of self-cleaning in combination with artificial cleaning. Some supporting artificial silt-cleaning should be implemented in practice. A beam dam will, thus, have more storage capacity with which to control the next debris flow event.  相似文献   

3.
There are two kinds of Sabo dams in order to control sediment transport by debris flow and flash floods in mountainous area, which are closed and open-type's dams. In Japan, open-type's Sabo dams are constructed taking into account the continuity of sediment routing from upstream to downstream reach in a basin. A plan to construct a 20 m high grid-type Sabo dam which can capture a sediment volume of 400,000 m3 is proposed in the Amahata river basin in Japan. Hydraulic model tests are conducted to decide on the section for a dam (Section A, B) and the grid size such as clearance of vertical/horizontal bars for evaluating the plan. Several runs of flume tests are conducted and the sediment control function of the Sabo darn is discussed using several experimental data such as dimensionless sediment runoff rate from Sabo dam, temporal changes of bed profile and mean diameter and so on. It was found that sediment deposition in sediment storage area of Sabo dam was affected by curved channel, and that next the grid size of steel bars and thirdly the section of a dam was able to capture sediment in storage area of Sabo dam. Sediment was controlled well in the section B and in the grid size of 1.0×d95, and the problems related to sediment runoffafter sediment capturing in Sabo dam are pointed out.  相似文献   

4.
以显示动力学和接触碰撞理论为基础,应用ANSYS/LS-DYNA程序,对常规的泥石流重力拦挡坝和带支撑的新型拦挡坝进行了单个球体撞击下的多参数数值模拟计算及对比分析。结果表明:无论有无支撑,混凝土坝身的破坏模式均为由撞击区域应力骤增导致的局部混凝土压碎,但支撑使坝身迎击面应力分布均匀,提高了材料利用率;支撑能够显著减小混凝土坝顶动位移,最大减幅在30%以上,甚至可达近65%,坝身刚度得到大幅度提高;当撞击高度一定时,支撑间距越小,混凝土坝顶动位移越小;若设置了支撑,则可适当减小混凝土坝身厚度,其减小比例以1/3为宜;撞击力主要由混凝土坝身承担,其刚度显著大于支撑总刚度;撞击高度越高或者支撑间距越小,则混凝土坝底支反力所占比重相对越低,支撑的加强作用也就越显著。  相似文献   

5.
《国际泥沙研究》2023,38(2):265-278
Ecological engineering plays an increasingly significant role in mountain hazard control, but the effect of species selection and arrangement (e.g., row spacing and stem spacing) on debris flow suppression is still unclear. To further understand the interception efficiency of shrub arrangement parameters on debris flow and explore the difference with slow hydraulic erosion, sixteen sets of small-scale flume experiments with different stem and row spacings were done to study the effects of shrubs on debris flow severity, flow rate, velocity, and particle size. The results suggest that, for a dilute debris flow, sediment interception effectiveness (27.4%–60.9%) decreases gradually as stem spacing increases. Moreover, as row spacing increases, flow velocity reduction (34.4%–44.9%) and flow reduction (18.5%–47.4%) gradually decrease; and the bulk density reduction (0.5%–5.3%) and sediment interception increase initially and then decrease. In contrast, for a viscous debris flow, the flow reduction, flow velocity reduction, and sedimentation interception decrease gradually as the stem spacing increases. As row spacing increases, the flow velocity reduction, flow reduction, and sediment interception all increase initially and then decrease. A formula for the flow velocity of dilute debris flow after the filter strip was derived based on the energy conservation law and Bernoulli's equation, confirming that debris flow movement is closely related to the degree of vegetation cover. This research strengthens the current understanding of the effectiveness of vegetation in debris flow disaster prevention and control and can guide practical applications.  相似文献   

6.
The formation of landslide dams is often induced by earthquakes in mountainous areas.The failure of a landslide dam typically results in catastrophic flash floods or debris flows downstream.Significant attention has been given to the processes and mechanisms involved in the failure of individual landslide dams.However,the processes leading to domino failures of multiple landslide dams remain unclear.In this study,experimental tests were carried out to investigate the domino failure of landslide dams and the consequent enlargement of downstream debris flows.Different blockage conditions were considered,including complete blockage,partial blockage and erodible bed(no blockage).The mean velocity of the flow front was estimated by videos.Total stress transducers(TSTs)and Laser range finders(LRFs) were employed to measure the total stress and the depth of the flow front,respectively.Under a complete blockage pattern,a portion of the debris flow was trapped in front of each retained landslide dam before the latter collapsed completely.This was accompanied by a dramatic decrease in the mean velocity of the flow front.Conversely,under both partial blockage and erodible bed conditions,the mean velocity of the flow front increased gradually downward along the sloping channel.Domino failures of the landslide dams were triggered when a series of dams(complete blockage and partial blockage) were distributed along the flume.However,not all of these domino failures led to enlarged debris flows.The modes of dam failures have significant impacts on the enlargement of debris flows.Therefore,further research is necessary to understand the mechanisms of domino failures of landslide dams and their effects on the enlargement of debris flows.  相似文献   

7.
The Tongariro Power Development Scheme (TPDS) is used to regulate flow in the headwaters of the largest catchment on the North Island of New Zealand (the Waikato). Two small dams, the Rangipo Dam and the Poutu Intake Dam, were constructed in 1973 and 1983. The flow regime of the river is managed to divert freshes into the power scheme, but allows flows larger than 100 m3 s?1 to be released, to rework and transport sediment through the catchment. Analysis of aerial photos and maps spanning 1928 to 2007, alongside field measurements, show that there have been few hydrogeomorphic adjustments since dam construction. This includes limited changes to channel geometry, channel planform and bed material organization immediately downstream of the dams. In addition, offsite effects are minimal, both 500 m downstream of each dam, and in the more sensitive, less confined reaches in the lower catchment (11 km downstream of the Poutu Intake dam). The limited changes can be attributed to the locations of the dams within reaches characterised by bedrock gorges and confined within terraces. These locations act to flush sediments and impose margins that allow minimal adjustment of the channel. Bed material within this reach is characterised by the presence of a boulder lag. This is sourced from long-term incision into lahar deposits, and acts to limit the rate of incision, creating a steep and stable base upon which active fractions are transported. Just as importantly, significant storage in the low-relief volcanic plateau located in the upper catchment acts to disconnect and store the high sediment yields generated by active volcanic cones in the western sub-catchment upstream of the dams. This limits the rate of sediment supply to regulated reaches. Findings from this study show that analysis of reach-scale controls is essential in framing dam site locations in relation to the distribution of reaches and landscape units across the catchment. In this instance, tributary inputs downstream of the dams do not replenish the sediment and flow removed at the dam locations, as has been observed in other regulated systems. Rather, the river itself is resilient to change and flow variability is well managed allowing geomorphically effective floods to occur. Landscape setting is a key consideration in determining the hydrogeomorphic impact of flow regulation.  相似文献   

8.
Large dam construction for irrigation, hydropower, water supply, and flood control in tropical to sub-tropical areas increased markedly after 1950. Many of the dams built during this period have filled with sediment and no longer perform to their original design specifications; in many cases, forecast dam life was greatly overestimated. This study investigates the useful life of Burdekin Falls Dam (BFD), northeastern Australia and compares the findings with other tropical reservoirs. Using two independent methods it is estimated that between 61 and 65 million m3 of sediment has been deposited in the reservoir over the 24 years of operation through 2011. This sediment volume equates to an average of 0.15% of capacity lost per year since construction was completed. If current sediment loads/climate regimes persist, reservoir capacity will be reduced by 50% after 345 years. However, the useful life of the BFD reduces to just 276 years when drawdown data are considered; these data show reservoir use would be affected once 40% of storage was filled with sediment, with a 60% drawdown return period of 1 in 15 years. When compared to similar large tropical to sub-tropical reservoirs, the BFD has a slightly longer reservoir useful life than dams in India and a much longer half-life than for both similar-sized and larger dams in China, Brazil, and Iran. Properties of the BFD that promote a longer useful life include a lower trap efficiency, relatively low annual sediment load delivered to the reservoir, limited sediment deposition behind the dam wall (and uniform distribution of deposited sediment), and the export of highly turbid annual floodwaters before settling and deposition of any remaining sediment within the reservoir.  相似文献   

9.
Time lag between reduction of sediment supply and coastal erosion   总被引:1,自引:0,他引:1  
The disruption of sediment supply from river to coast by dam development has been a topic of global concern.In Japan,among the top 30 dams in terms of height,14 dams were constructed prior to 1970 and another 6 dams before 1980.However,the coastline erosion did not surface up as a grievous problem until the 1980s.According to the River Bureau of Japan,the overall erosion rate along the coastline of Japan was 0.72×10~6 m~2/yr prior to 1980,but sharply increased to 1.6×10~6 m~2/yr since 1980.Therefore,there was a time lag between the disruption of sediment supply by dam and beach erosion.This paper presents a case study on what may have delayed the response of beach to the effect of dam construction.  相似文献   

10.
A sabo dam has a purpose to block the path of debris flow. However, when overflow occurs, a sabo dam works as a weir, a vertical obstruction, where the fluid must flow over. Many empirical formulas and discharge coefficients for weirs relating flow depth to discharge have been proposed to calculate overflow discharges. However, only a few studies about overflow discharge coefficients are available in the case of debris flow. In this paper, experiments and numerical simulations were done to estimate debris flow discharge coefficients by considering the sediment concentration. In the numerical simulation, a complete overflow equation and a free overfall equation were implemented to calculate debris overflow discharges at a sabo dam. To determine the discharge coefficients for each equation, single factor regression analysis was used. Laboratory experiments were done to calibrate and to compare with the simulation. Study results showed that the discharge coefficients increase as the sediment concentration increases. This finding suggests debris flow discharge coefficients are derived to calculate the debris overflow discharges at a sabo dam.  相似文献   

11.
Impulsive force of debris flow on a curved dam   总被引:8,自引:0,他引:8  
Although Sabo dams are an efficient method for river and basin management, traditional Sabo dams have a great impact on ecology and landscape. Moreover, such dams are hit and often damaged by great impulsive force when they block the debris flow. Therefore, alternative shapes for Sabo dam deserve thorough investigation. In this investigation, a curved dam was designed by changing the upstream-dam-surface geometric shape to reduce the impulsive force of the debris flow, with enhanced stability and reduced concrete mass being the anticipated outcomes. In this study, the flume and laboratory facilities simulated the impulsive force of the debris flow to the Sabo dams. Three geometric forms, including vertical, slanted and curved Sabo dams, were used to determine the impulsive force. Impulsive force theories of the debris flow were derived from the momentum equation and the Bernoulli equation. In these, the impulsive force was balanced by the friction force of the Sabo dam and the opposite force of the load cell behind the dam as it was hit by the debris flow. Positive correlations were found when comparing the experimental data with the theoretical results. These findings suggest that our impulsive force theory has predictive validity with regard to the experimental data. The results from both theory and experimental data clearly show that curved darns were sustained less force than the other darns under the same debris flow. This comparison demonstrates the importance of curved geometry for a well-designed Sabo dam.  相似文献   

12.
Sediment causes a serious problem in relation to dam function. A cooperative sediment sluicing operation has been under way since 2017 to prevent sediment from accumulating in dams in the Mimi River,Miyazaki, Japan. To achieve a smooth and stable operation, it is very important to determine the sediment source and a sediment transport system to maintain the dam’s function. In the current study, the source and transport of sediment from the Mimi River basin have been analyzed with X-ray diffracti...  相似文献   

13.
《国际泥沙研究》2020,35(5):431-443
In recent years, the damage caused to human settlements in Japan by large woody debris (LWD) has been increasing. For example, the 2013 Izu Oshima typhoon resulted in a large number of fatalities and missing persons, and the Kagoshima Typhoon Disaster and Northern Kyusyu torrential downpour caused vast infrastructure damage due to the associated LWD. Current countermeasures for preventing LWD are insufficient to maintain the safety of residential areas. One type of protective barrier, the open sabo dam, has been constructed in Japan during the past 30 years. The primary function of open sabo dams is to block the flow of boulders, thereby also reducing sediment flow by reducing the gap size. However, because Japanese open sabo dams are designed specifically for boulder-trapping, the ability of these dams to trap LWD remains uncertain. In particular, many problems have been reported with respect to sediment trapping by driftwood with roots in an open sabo dam setting. The objective of this study was to examine the trapping efficiency of open sabo dams for LWD and sediment. The experimental approach clarified the influence of driftwood, without and with roots, on sediment trapping for a straight-channel flume. The flexible roots of the driftwood were shown to have a significant effect on the sediment trapping efficiency of the dam.  相似文献   

14.
《国际泥沙研究》2019,34(6):537-549
Dam removal can generate geomorphic disturbances, including channel bed and bank erosion and associated abrupt/pulsed release and downstream transfer of reservoir sediment, but the type and rate of geomorphic response often are hard to predict. The situation gets even more complex in systems which have been impacted by multiple dams and a long and complex engineering history. In previous studies one-dimensional (1-D) models were used to predict aspects of post-removal channel change. However, these models do not consider two-dimensional (2-D) effects of dam removal such as bank erosion processes and lateral migration. In the current study the impacts of multiple dams and their removal on channel evolution and sediment delivery were modeled by using a 2-D landscape evolution model (CAESAR-Lisflood) focusing on the following aspects: patterns, rates, and processes of geomorphic change and associated sediment delivery on annual to decadal timescales. The current modeling study revealed that geomorphic response to dam removal (i.e., channel evolution and associated rates of sediment delivery) in multiple dam settings is variable and complex in space and time. Complexity in geomorphic system response is related to differences in dam size, the proximity of upstream dams, related buffering effects and associated rates of upstream sediment supply, and emerging feedback processes as well as to the presence of channel stabilization measures. Modeled types and rates of geomorphic adjustment, using the 2-D landscape evolution model CAESAR-Lisflood, are similar to those reported in previous studies. Moreover, the use of a 2-D method showed some advantages compared to 1-D models, generating spatially varying patterns of erosion and deposition before and after dam removal that provide morphologies that are more readily comparable to field data as well as features like the lateral re-working of past reservoir deposits which further enables the maintenance of sediment delivery downstream.  相似文献   

15.
《国际泥沙研究》2022,37(5):687-700
Globally, between 1950 and 2011 nearly 80,000 debris flow fatalities occurred in densely populated regions in mountainous terrain. Mitigation of these hazards includes the construction of check dams, which limit coarse sediment transport and in the European Alps number in the 100,000s. Check dam functionality depends on periodic, costly maintenance, but maintenance is not always possible and check dams often fail. As such, there is a need to quantify the long-term (10–100 years) geomorphic response of rivers to check dam failures. Here, for the first time, a landscape evolution model (CAESAR-Lisflood) driven by a weather generator is used to replicate check dam failures due to the lack of maintenance, check dam age, and flood occurrence. The model is applied to the Guerbe River, Switzerland, a pre-Alpine catchment containing 73 check dams that undergo simulated failure. Also presented is a novel method to calibrate CAESAR-Lisflood's hydrological component on this ungauged catchment. Using 100-year scenarios of check dam failure, the model indicates that check dam failures can produce 8 m of channel erosion and a 322% increase in sediment yield. The model suggests that after check dam failure, channel erosion is the remobilization of deposits accumulated behind check dams, and, after a single check dam failure channel equilibrium occurs in five years, but after many check dam failures channel equilibrium may not occur until 15 years. Overall, these findings support the continued maintenance of check dams.  相似文献   

16.
1 INTRODUCTION Sedimentation in reservoirs is a significant problem. A variety of methods have been suggested to alleviate the effects of sedimentation, but none of the methods are inexpensive and entirely effective. Perhaps soil conservation is the best option, but soil conservation only leads to a reduction in sediment load. Dredging is expensive and produces a large amount of spoil. Sediment sluicing can be effective, but for large dams it takes a great deal of time to lower and re…  相似文献   

17.
Sediment detention basins are implemented on mountain rivers to trap solid material that may aggravate the flooding of downstream settlements.However,retention structures built in the past may unnecessarily retain sediment during non-hazardous flood events,resulting in high maintenance costs and sediment deficit downstream.In addition,the so-called spontaneous self-flushing of previously retained sediment during floods has occasionally been observed.Recent research suggests to design sediment detention basins for controlling sediment passage with a guiding channel across the deposition area upstream of a hybrid barrier.Such barriers consist of a check dam with a slot orifice and an upstream bar screen with a bottom clearance in order to benefit from a combined mechanical-hydraulic retention control.The present paper enhances this pioneering research with the help of new experimental data,including a wide range of sediment mixtures and large wood,as well as variable barrier heights.Improved design criteria are provided regarding the bar screen and the basin storage capacity.The functionality of the enhanced concept for sediment detention is illustrated by a case study on a physical model:the protection of the Villard-Bonnot village(France)against torrential hazards.  相似文献   

18.
受汶川地震影响,四川等地泥石流治理更为迫切。泥石流的暴发具有突发性,在防治工程中,相比实体坝而言,格栅坝是一种节省材料、稳定性更高的拦挡结构,使用范围越来越广,但是目前尚无成熟的格栅坝设计方法。本文参考梳齿坝的已有理论确定了支墩间距的计算方法,并结合已有实验资料提出了格栅坝格栅间距的计算公式,改变了以往不同坝体乃至同一坝内各横梁间距一致的计算方法。另外,因支墩间隔相对较小,以简支模式计算石块对横梁冲击力并不合适,本文基于固定梁模式重新推导了计算公式,其计算结果与简支梁模式比较,数值大了3倍。最后考虑坝体建成后的不同情况,提出了支墩、横梁及两侧翼墙的详细计算工况,并基于以上设计理论,对烂泥沟泥石流治理工程的部分格栅坝进行了具体设计。  相似文献   

19.
调查、搜集和研究了汶川地震中被评定为高危以上险情的147座小型水库土坝的地震破坏情况,给出了高危以上险情土坝的地震破坏程度划分为中等破坏、严重破坏和极严重破坏三个等级的原则和标准,以及土坝的地震破坏程度与地震烈度、土坝的宽高比、上游坡比、坝高的经验关系表,可发现:土坝的几何形状对其破坏程度起着重要的作用;对于6~8度地震烈度区,土坝的宽高比越小,或上游坡比越小,或坝体越高,则土坝的破坏程度越严重;对于9度以上地震烈度区,土坝通常发生极严重破坏。依据高危以上险情土坝的地震反应分析结果,给出了土坝地震破坏程度与土坝宽高比、坝高、土坝上游坡比及坝顶加速度放大系数、坝体最大动剪应力的经验关系曲线,发现在相同的地震烈度水平下,土坝的宽高比越小,或上游坡比越小,或坝高越大,且坝顶加速度放大系数越大或坝体最大动剪应力越大,则其地震破坏程度越严重;坝体最大动剪应力超过30kPa的土坝,通常发生严重或极严重破坏,坝体最大动剪应力大于100kPa的土坝,通常发生极严重破坏;土坝离发震断层越远,则其坝顶加速度放大系数越大。本文给出的高危以上险情土坝的地震破坏程度与坝体几何形状的经验关系,可为今后土坝抗震设计提供参考依据。  相似文献   

20.
The determination of sediment yield in catchments based on the sediment trapped by check dams is becoming a subject of interest.In fact,several methods have been developed in recent years to estimate the sediment retained by check dams.The complexity,precision and accuracy of each method vary greatly.In this study,we evaluate the sediment trapped by check dams comparing the Sections method respect to the Prism,Pyramid,DTMs and Trapezoid methods.We analyzed a sample of 25 check dams(α-1=90%;ε=10%) in the Saldana badlands(Spain).The results showed that the Sections method offered a volume of retained sediment between the others,which gave an absolute variation from 22%to40%.The high variability of the check dam and sediment wedge sizes made necessary to compare methods in groups combining both characteristics.No significant differences in sediment volumes could be found between the methods for very small(height(h):1.8-2.3 m;trapped volume(V):6-102 m~3) or large check dams(h 2.3 m;V:165-387 m~3),while significant differences are found for small(h 1.5 m;V:1-229 m~3) or middle-sized check dams(h:2.2-3.2 m;V:65-235 m3).Nevertheless,volume differences between groups ranged up to + 25%.For these reason,the size of the check dam,the shape of the sediment wedge and the accuracy of the measure methods must considered when selecting an appropriate method to obtain the volume of retained sediment by check dams.A correct estimation of the sediment retention is needed to evaluate the role and efficiency of check dams in restoration projects or to estimate sediment yields.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号