首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
【目的】研究海上沉桩贯入软土地基诱发的挤土效应。【方法】利用有限元大变形RITSS程序,通过大量的参数分析,对海洋地基桩基础贯入引起的挤土效应、土体破坏机理、周围土体的水平和隆起位移,以及挤土效应的影响范围展开系统研究。【结果】将数值模型与锥形桩(圆锥贯入仪)经典理论解进行比对,获得了较好的一致性。对大量数值仿真结果进行统计,获得在海洋地基中沉桩时土体的径向位移和垂直隆起高度的定量化描述,桩周土在1~3倍圆桩半径范围内最大水平位移为0.26R。【结论】提出关于水平位移和隆起高度的计算公式,能够预测沉桩对临近土体扰动的影响范围,能较为准确地评估多桩系统中沉桩对临近桩基础的影响。  相似文献   

2.
When transparent soil technology is used to study the displacement of a slope, the internal deformation of the slope can be visualized. We studied the sliding mechanism of the soil-rock slope by using transparent soil technology and considering the influence of the rock mass Barton joint roughness coefficient, angle of the soil mass, angle of the rock mass and soil thickness factors on slope stability. We obtained the deformation characteristics of the soil and rock slope with particle image velocimetry and the laser speckle technique. The test analysis shows that the slope sliding can be divided into three parts: displacements at the top, the middle, and the bottom of the slope; the decrease in the rock mass Barton joint roughness coefficient, and the increase in soil thickness, angles of the rock mass and soil mass lead to larger sliding displacements. Furthermore, we analyzed the different angles between the rock mass and soil thickness. The test result shows that the displacement of slope increases with larger angle of the rock mass. Conclusively, all these results can help to explain the soil-rock interfacial sliding mechanism.  相似文献   

3.
A field monitoring system was established in an active river bank landslide in the Three Gorges area, China, and a consecutive monitoring for about 5 years were conducted to understand the displacement characteristics of flexible piles and the surrounding soil. It was found that piles deformed elastically under reservoir operation, and the soil in front of piles was gradually separated from piles. The movement of the pile heads exceeded that of the soil between and behind piles. This phenomenon was further studied by a large-scale physical model test to gain insights into the pile-soil interaction. The displacement relationship between pile heads and the surrounding soil is in good agreement with the field data. The physical model test shows that the deformation process of pile-reinforced landslides can be divided into two stages: firstly, when the piles head movement exceeds soil movement, the soil arching is mainly affected by the deflection of the piles, the arches between and behind piles bent upwards;but when the soil movement exceeds piles head movement, the arches near the upslope and downslope bent downwards and upwards, respectively. Furthermore, the different deformation of two adjacent piles and the pile stiffness influenced the arch’s shape and formation;the flexible piles exhibit great coordinated deformation with the landslide, and caused the soil arch on the downslope.  相似文献   

4.
针对矩形顶管上竖向土压力计算模型研究较少的现状,借助Terzaghi土压力计算理论,结合矩形顶管工程特点建立了考虑注浆作用的矩形顶管竖向土压力计算模型,提出了改进的竖向土压力计算公式;依托苏州某矩形顶管工程中竖向土压力实时监测数据,探究了其变化规律并验证了该计算公式的准确性。研究结果表明:土体中的剪切带从管道外壁两侧产生并沿竖直方向发展,且可贯穿至地表;临界状态下剪切带上的膨胀角完全发挥,以临界内摩擦角及其正弦值计算剪切带上的摩擦系数;不同的注浆压力下,管道上方可能出现“主动土拱”和“被动土拱”。计算值与实测值的对比分析表明,改进后的计算方法能够较好地包络矩形顶管竖向土压力范围。   相似文献   

5.
矩形顶管施工过程中管周摩阻力是引起周围土体扰动的重要影响因素。为了更加准确地预测矩形顶管施工对地层位移的影响,结合管节受力分析和泥浆运动规律,假定“U”字形泥浆套状态,基于弹性力学Mindlin解建立土体水平位移计算公式,对正面附加应力、管周摩阻力等因素引起的地层纵向水平位移进行计算,最后与苏州某矩形顶管工程实测值进行对比分析。结果表明:在顶管机头顶进穿过某一断面前,正面附加应力对周围土体的影响大于管周差异摩阻力,而在穿过该断面后,由于管节数量的增多以及已穿过部分的管节管周摩阻力产生的“拉力”作用,后者的累计影响占比逐渐大于前者;管周差异摩阻力情况下比管周均一摩阻力情况下的计算值更贴近实测值,预测效果更好。   相似文献   

6.
《山地科学学报》2020,17(1):230-243
This paper describes model tests of single piles subjected to vertical cyclic compressive loading for three kinds of topography: sloping ground, level ground, and inclined bedrock. Comprehensive dynamic responses involving cyclic effects and vibration behaviours are studied under various load combinations of dynamic amplitude, mean load,frequency and number of cycles. Test results show that permanent settlement can generally be predicted with a quadratic function or power function of cycles.Sloping ground topography produces more pronounced settlement than level ground under the same load condition. For vibration behaviour,displacement amplitude is weakly affected by the number of cycles, while load amplitude significantly influences dynamic responses. Test results also reveal that increasing load amplitude intensifies nonlinearity and topography effects. The strain distribution in a pile and soil stress at the pile tip are displayed to investigate the vibration mechanism accounting for sloping ground effects. Furthermore, the dynamic characteristics among three kinds of topography in the elastic stage are studied using a three-dimensional finite method. Numerical results are validated by comparing with experimental results for base inclination topography. An inclined soil profile boundary causes non-axisymmetric resultant deformation, though a small difference in vertical displacement is observed.  相似文献   

7.
城市地下空间开发和交通的发展促使大断面顶管技术在城市隧道建设中得到了广泛推广应用,其中并行顶管隧道的功能要求不同,因此其断面形状和尺寸也各有差异。基于城市下穿主干道的双线并行差异大断面顶管隧道工程,建立有限元三维计算模型进行系统分析,同时结合现场顶管项目的实测成果,研究并行顶管差异断面及不同工序情况下地表变形的特性及其影响因素。研究结果表明并行差异断面顶管施工引起的地表变形曲线呈"Ⅴ"形,地表变形曲线的峰值点由大断面矩形顶管轴线逐渐转移至两管中心;小断面矩形顶管轴线左侧的地表沉降值较轴线右侧大;先施工大断面矩形顶管更有利于地表变形的控制;断面尺寸的变化对地表变形的影响幅度为30%,工序差异对地表变形的影响幅度为8%,断面尺寸差异对地表变形的影响比工序差异的影响大。并行差异断面顶管施工对地表变形影响研究可为今后相关并行大断面顶管工程提供理论基础和经验借鉴。   相似文献   

8.
随着我国公路建设不断向山区深入, 在地质构造复杂区公路边坡遇到断层破碎带的情况日渐增多, 亟需开展阻滑能力强的抗滑桩结构加固边坡研究。传统的人工挖孔桩施工模式存在高风险、低效率等缺点, 而组合式圆截面抗滑桩具有施工效率高、安全便捷等特点, 为此, 探究其对含断层破碎带边坡的加固效果具有现实意义。采用自主设计的边坡物理试验系统, 设计了5种不同破碎带厚度与组合式圆截面抗滑桩组合的物理模型, 采用坡顶逐级加载的方式模拟加载, 监测桩身应变、桩顶位移和桩后土压力, 采用高速相机捕捉滑体变形破坏图像, 并使用粒子图像测速(PIV)技术对图像进行处理。研究结果表明: 组合式圆截面抗滑桩通过限制桩后滑体水平位移, 并将滑体限制在前、后排桩间来达到加固边坡的效果; 滑体演化分为变形压密、加速变形和破坏滑移3个阶段; 前、后排桩桩后土压力比值介于1/3~1/2之间; 随断层破碎带厚度增加, 滑体水平滑移速率增大, 组合式圆截面抗滑桩的桩顶位移增大, 桩身最大正弯矩减小。模型试验与数值模拟计算的弯矩及桩顶位移较为吻合, 研究成果可为边坡工程组合式圆截面抗滑桩设计提供一定借鉴与参考。   相似文献   

9.
2011年日本东北MW9.0大地震不仅造成日本境内地表产生超过5 m的同震位移和显著的震后变形,在中国大陆东部地区也引起明显的远场同震及震后变形。本文利用1999~2017年GPS连续站和流动站观测资料,计算高空间分辨率的远场同震和震后变形位移场。结果表明,2011年日本东北MW9.0地震对中国105°E以东区域产生了E向运动的同震变形,对中国东北和山东半岛产生了可观的震后变形,且GPS震后变形的累积量已超过相应台站的同震位移量。利用日本大地震在中国东部地区产生的远场同震和震后变形位移场,可为维护区域大地参考基准和反演岩石圈及上地幔的流变性质提供定量约束。  相似文献   

10.
Centrifugal model tests are playing an increasingly important role in investigating slope characteristics under rainfall conditions. However, conventional electronic transducers usually fail during centrifugal model tests because of the impacts of limited test space, high centrifugal force, and presence of water, with the result that limited valid data is obtained. In this study, Fiber Bragg Grating (FBG) sensing technology is employed in the design and development of displacement gauge, an anchor force gauge and an anti-slide pile moment gauge for use on centrifugal model slopes with and without a retaining structure. The two model slopes were installed and monitored at a centrifugal acceleration of 100 g. The test results show that the sensors developed succeed in capturing the deformation and retaining structure mechanical response of the model slopes during and after rainfall. The deformation curve for the slope without retaining structure shows a steep response that turns gradual for the slope with retaining structure. Importantly, for the slope with the retaining structure, results suggest that more attention be paid to increase of anchor force and anti-slide pile moment during rainfall. This study verifies the effectiveness of FBG sensing technology in centrifuge research and presents a new and innovative method for slope model testing under rainfall conditions.  相似文献   

11.
锚索抗滑桩系统内力变形研究   总被引:1,自引:0,他引:1  
在对锚索抗滑桩系统内锚索与抗滑桩受力状态综合分析的基础上,认为锚索的拉伸变形对锚索抗滑桩系统的内力及变形存在一定影响,基于锚索与抗滑桩的变形协调原理,提出了锚索拉力及其变形的计算方法,推导了抗滑桩桩身位移和内力的计算公式,并将该方法用于工程实例分析。通过与其他方法比较,说明使用该方法计算锚索抗滑桩的合理性和经济价值,并分析了锚索变形以及拉力大小对锚索抗滑桩系统内力变形的影响,所得结果已得到后期模型试验的数据支持。  相似文献   

12.
组合式抗滑桩是加固大型滑坡的有效防护措施, 但上硬下软等复合地层中h型抗滑桩的加固机理仍有待深入研究。基于一套自主研发的上硬下软地层滑坡-h型抗滑桩物理模型试验装置, 综合应力应变监测、激光测距仪、高速相机与粒子图像测速(PIV)技术研究了上硬下软地层滑坡中h型桩的位移、内力响应规律与滑体变形破坏特征, 揭示了上硬下软地层条件下h型桩与滑坡相互作用机理。研究结果表明, 在坡顶荷载逐渐增加的条件下, h型桩加固的上硬下软地层滑坡的演化阶段可划分为蠕变阶段、匀速变形阶段、加速变形阶段和破坏阶段4个阶段。受连系梁影响, 前排桩与后排桩桩顶位移较小, 应变最大值出现在靠近滑面深度处; 后排桩弯矩呈"S"型分布, 前排桩弯矩呈三角形分布, 负弯矩最大值位于连系梁下方20 cm处。随着硬岩体积分数(φβ)增加, 桩顶位移逐渐减小, 前、后排桩最大弯矩值也逐渐减小, 但硬岩体积分数超过60%后最大弯矩值变化幅度较小。当φβ=20%和40%时, 后排桩土压力总体呈抛物线形式; 当φβ=60%和80%时, 土压力总体呈反"S"型, 且滑面附近出现第二个土压力峰值; 前排桩土压力分布形式均为抛物线型。试验结果可为组合式抗滑桩加固机理研究和设计提供理论支撑。   相似文献   

13.
??????????????,???????????????????????????????λ??????λ????????????????????????????????????????????????????????λ??????λ?????????????????????λ??????????????????ж????????????1????????????????????λ?????λ????????????????????λ??????????????????2????????????????λ??????????????????????????λ?????????????????????????С??????????????????????λ?????????????3???????????????????λ???????????????λ??????????С???????????????????  相似文献   

14.
顶管施工因非开挖或少开挖而在城市建设中应用广泛, 但顶管施工引起的地表沉降不容忽视。依托佛山市某电力隧道顶管工程, 通过现场实测、数值模拟及Peck经验公式的方法研究了顶管施工引起的地表沉降规律, 探讨了管-土摩擦、注浆压力及支护压力对地表沉降的影响。结果表明: 顶管施工引起的横向地表沉降在距轴线约4倍管径范围内变化较大, 管-土摩擦的改变对横向地表距轴线约3倍管径范围内的地表沉降影响较大, 对纵向地表距开挖面约1倍管径范围内的地表沉降影响较小; 注浆压力的增大能够抑制地表沉降; 支护压力的改变对横向地表距轴线约2倍管径范围内的地表沉降影响较大。研究结果可为控制顶管施工引起地表沉降措施的制定提供参考; 同时, 实测值、模拟值及Peck经验公式所得到的地表沉降变化趋势和大小相近, 验证了数值模拟及Peck经验公式在实际工程中预测地表沉降的可行性。   相似文献   

15.
采空区地表山体侧向变动,不同于一般天然山坡,也与采空区一般上覆岩层的变形破坏有异;它是二者复合机理的效应。本文在分析考察了毗邻电厂的横山顺倾构造山体、剖析了地下采空情况认为:山体侧向变动中,软弱夹层有决定性作用,变动范围、速率和规模与地下采空有关;并利用地质力学模型试验和数值模拟,探索了采动引起山体应力场及变动规律。结果表明,山体岩层的变形、位移、破坏、由直接顶板向地表发展,采空坍陷诱发了软弱夹层的蠕滑,则产生山体侧向滑移;电厂区地表隆起变形是山体侧向滑移挤压地基土的反映。通过现场实际调研、变形观测资料分析与数值模拟和模型试验的对比研究,提出了“坍落拱梁”的成生效应、挤压蠕滑效应、失稳效应;揭露了顺倾构造山体在采空影响下,具有地表、地下的“复合临空面”的“复合应力场”中“复合变动”的“复合机理”;并提出这种山体侧向变动机理的典型地质模式,借以论证山体稳定性。  相似文献   

16.
利用高频GPS数据长基线双差精密定位技术,获取2011年3月日本Mw9.0强震近场和远场GPS连续参考站的瞬时动态形变。分析表明:距震源较近的IGS站(USUD)的同震动态形变水平方向幅度超过60 cm,震后水平形变达到30 cm;位于远场的GPS连续参考站(JLYJ)的动态形变,清晰地给出了地震面波引起的地表形变波形。对JLYJ站的谱分析表明,地震面波引起的动态形变周期为10~17 s,并出现了两次峰值,东西向和垂向上的动态位移量远大于北南向,说明JLYJ站的形变主要由Rayleigh波及其谐波所主导,Rayleigh波的传播速度为3.5 km/s,波长约50 km。  相似文献   

17.
Xigeda formation is a type of hundred-meter-thick lacustrine sediments of being prone to triggering landslides along the trunk channel and tributaries of the upper Yangtze River in China. The Yonglang landslide located near Yonglang Town of Dechang County in Sichuan Province of China, which was a typical Xigeda formation landslide, was stabilized by anti-slide piles. Loading tests on a loading-test pile were conducted to measure the displacements and moments. The uncertainty of the tested geomechanical parameters of the Yonglang landslide over certain ranges would be problematic during the evaluation of the landslide. Thus, uniform design was introduced in the experimental design, and by which, numerical analyses of the loading-test pile were performed using Fast Lagrangian Analysis of Continua (FLAC3D) to acquire a database of the geomechanical parameters of the Yonglang landslide and the corresponding displacements of the loading-test pile. A three-layer back-propagation neural network was established and trained with the database, and then tested and verified for its accuracy and reliability in numerical simulations. Displacement back analysis was conducted by substituting the displacements of the loading-test pile to the well-trained three-layer back-propagation neural network so as to identify the geomechanical parameters of the Yonglang landslide. The neural-network-based displacement back analysis method with the proposed methodology is verified to be accurate and reliable for the identification of the uncertain geomechanical parameters of landslides.  相似文献   

18.
锚索抗滑桩是滑坡的主要支护结构之一。目前, 软硬相间地层条件下锚索抗滑桩的受力与变形特征尚缺乏系统研究。以软硬相间地层为地质背景, 基于自主研发的柔性测斜仪和自动加载系统, 构建了锚索抗滑桩加固滑坡物理模型试验系统, 开展了锚索抗滑桩加固滑坡的物理模型试验, 揭示了推力不断增加过程中抗滑桩、锚索和滑体的变形与受力特征, 对比研究了布锚方式对桩-锚受力与变形的影响规律, 通过数值模拟的方法分析了软硬相间地层对锚索抗滑桩的影响机理, 并以双锚点抗滑桩为例进行了理论分析。研究结果表明: ①在滑坡-锚索抗滑桩体系中, 桩身各点位移和滑体深部位移均随桩身深度的增加而减小, 滑体后部位移速率大于中部, 且滑体位移速率大于桩身位移速率; ②单锚点抗滑桩的桩-锚推力分担比经历了4个阶段的变化, 趋于稳定时桩-锚推力分担比约为9∶1, 锚索拉力作用下桩身弯矩呈"S"型分布, 正负弯矩非对称; ③锚固角度越大, 锚索拉力的增速越大, 不同锚固角度对桩身内力值的影响主要体现在受荷段; ④多锚点抗滑桩结构的锚索分担更多的推力, 与单锚点抗滑桩相比, 双锚点与三锚点抗滑桩的最大桩身弯矩分别减小了22.41%和40.55%;⑤与均质地层相比, 软硬相间地层中软、硬岩交界面处基岩应力发生突变, 不同软岩厚度比和桩底是否嵌入硬岩, 均对锚索拉力和桩-岩之间的相互作用有不同程度的影响; 其次, 双锚点抗滑桩内力的理论值与试验结果较为接近。本研究成果可为软硬相间地层中锚索抗滑桩加固滑坡工程的优化设计提供依据。   相似文献   

19.
为探测汶川Ms8.0地震引起的地表形变,用ALOS卫星PALSAR L波段SAR数据与GPS观测数据,采用两轨雷达差分干涉方法,计算出了地震影响区约83 194 km 2 范围内的同震干涉图与形变场。此外,以16个GPS点的形变数据为参考,对干涉形变的精度进行分析,结果表明:除近断层区域两类数据存在较大差异外,整体吻合程度较高。  相似文献   

20.
为了研究软岩地基桥桩的荷载传递性状、破坏机理,并获取在该地质条件下更为可靠的桩基计算参数,对秦巴山区软岩地基3根钻孔灌注试桩进行竖向静载试验.结果表明:秦巴山区软岩地基桥桩试桩荷载沉降曲线呈陡降型,实测竖向极限承载力为20500kN,桩的破坏方式为桩身材料强度破坏;淤泥质亚黏土地层中的碎石起到一定的骨架作用,增强了此地层桩极限侧阻力,发挥极限侧阻力所需的桩土(岩)相对位移为4~8mm;强风化砾岩表现为加工软化型,发挥极限侧阻力所需的桩土(岩)相对位移为3~8mm;中风化砂砾岩表现为明显的加工硬化型,所需的桩岩相对位移大,且桩极限侧阻力的特征点不明显;淤泥质亚黏土地层桩侧阻力占总荷载的60%~70%,随着桩顶荷载的逐步加大,该地层桩侧阻力所占比例不断下降,而嵌岩段桩侧阻力所占比例逐渐上升,达到55%~65%,嵌岩段桩侧阻力沿桩深的分布曲线表现出非线性的特征;试桩为端承摩擦桩,桩端阻力约占桩顶荷载的20%左右,且未充分发挥,在上部结构允许的沉降范围内,适当增加桩端的沉降有利于端阻力的发挥;桩侧阻力先于端阻力发挥,建议单桩承载力设计时分别采用不同的端阻力和侧阻力安全系数.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号