首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 703 毫秒
1.
On July 20, 2003, following a short duration of heavy rainfall, a debris-flow disaster occurred in the Minamata–Hougawachi area, Kumamoto Prefecture, Japan. This disaster was triggered by a landslide. In order to assess the landslide and debris-flow hazard potential of this mountainous region, the study of historic landslides is critical. The objective of the study is to couple 3D slope-stability analysis models and 2D numerical simulation of debris flow within a geographical information systems in order to identity the potential landslide-hazard area. Based on field observations, the failure mechanism of the past landslide is analyzed and the mechanical parameters for 3D slope-stability analysis are calculated from the historic landslide. Then, to locate potential new landslides, the studied area is divided into slope units. Based on 3D slope-stability analysis models and on Monte Carlo simulation, the spots of potential landslides are identified. Finally, we propose a depth-averaged 2D numerical model, in which the debris and water mixture is assumed to be a uniform continuous, incompressible, unsteady Newtonian fluid. The method accurately models the historic debris flow. According to the 2D numerical simulation, the results of the debris-flow model, including the potentially inundated areas, are analyzed, and potentially affected houses, river and road are mapped.  相似文献   

2.
针对崩塌、滑坡和泥石流等灾种齐全的高山峡谷区,选取四川省阿坝县为研究区,采用多灾种耦合的评价思路,开展地质灾害危险性精细化评价。崩塌、滑坡等斜坡类灾害危险性评价以栅格为评价单元,泥石流灾害危险性评价以流域为评价单元。基于信息量模型和层次分析法,分别开展危险性评价,进而采用取大值的方法,获取研究区综合地质灾害危险性评价结果。研究表明,工作区综合地质灾害极高危险区、高危险区面积明显大于单灾种评价结果,极高危险区、高危险区主要位于崩塌、滑坡较发育的碎裂岩区域和极度易发的泥石流流域。针对高山峡谷区地质灾害危险性评价,多灾种耦合的评价思路能更合理的反映不同类型灾害在形态及空间上的差异,获取更精确的危险性评价结果。  相似文献   

3.
In this study the factors affecting the retrogressive Yaka Landslide, its mechanism and the hazard of debris flow on the town of Yaka are investigated. In the landslide area, the first landslide was small and occurred in March 2006 on the lower part of the Alaard?ç Slope near the Gelendost District town of Yaka (Isparta, SW Turkey). The second, the Yaka Landslide, was large and occurred on 19 February 2007 in the soil-like marl on the central part of Alaard?ç Slope. The geometry of the failure surface was circular and the depth of the failure surface was about 3 m. Following the landslide, a 85,800 m3 of displaced material transformed to a debris flow. Then, the debris flow moved down the Eglence Valley, traveling a total distance of about 750 m. The town of Yaka is located 1,600 m downstream of Eglence Creek and hence poses a considerable risk of debris flow, should the creek be temporarily dammed as a result of further mass movement. Material from the debris accumulation has been deposited on the base of Eglence Valley and has formed a debris-dam lake behind a debris dam. Trees, agricultural areas, and weirs in the Eglence Creek have seen serious damage resulting from the debris flow. The slope angle, slope aspect and elevation of the area in this study were generated using a GIS-based digital elevation model (DEM). The stability of the Alaard?ç Slope was assessed using limit equilibrium analysis with undrained peak and residual shear strength parameters. In the stability analyses, laboratory test results performed on the soil-like marls were used. It was determined that the Alaard?ç Slope is found to be stable under dry conditions and unstable under completely saturated conditions. The Alaard?ç Slope and its vicinity is a paleolandslide area, and there the factor of safety for sliding was found to be about 1.0 under saturated conditions. The Alaard?ç Slope and the deposited earthen materials in Eglence Creek could easily be triggered into movement by any factors or combination of factors, such as prolonged or heavy rainfall, snowmelt or an earthquake. It was established that the depth of the debris flow initiated on the Yaka Landslide reached up to 8 m in Eglence Creek at the point it is 20 m wide. If this deposited material in Eglence Creek is set into motion, the canal that passes through Yaka, with its respective width and depth of 7 and 1.45 m, could not possibly discharge the flow. The destruction or spillover of this canal in Yaka could bring catastrophic loss to residents which are located within 3–5 m of the bank of the canal. Furthermore, if material present in the landslide source area slides and this displaced material puts pressure on the unstable deposited material in Eglence Creek, even more catastrophic loss would occur to the town of Yaka. In this study, it was determined that debris flows are still a major hazard to Yaka and its population of 3,000. The results provided in this study could help citizens, planners, and engineers to reduce losses caused by existing and future landslides and debris flow in rainfall and snowmelt conditions by means of prevention and mitigation.  相似文献   

4.
Landslide hazard and risk assessment on the northern slope of Mt. Changbai, a well-known tourist attraction near the North Korean-Chinese border, are assessed. This study is divided into two parts, namely, landslide hazard zonation and risk assessment. The 1992 Anbalagan and Singh method of landslide hazard zonation (LHZ) was modified and used in this area. In this way, an Associative Analysis Method was used in representative areas to get a measure for controlling factors (slope gradient, relative relief, vegetation, geology, discontinuity development, weak layer thickness and ground water). For the membership degree of factor to slope failure, the middle range of limited values was used to calculate LHZ. Based on an estimation of the potential damage from slope failure, a reasonable risk assessment map was obtained using the relationship of potential damage and probable hazard to aid future planning and prediction and to avert loss of life.  相似文献   

5.
侯敏  贾韶辉  郭兆成 《现代地质》2006,20(4):668-672
基于遥感(RS)和地理信息系统(GIS)技术,采用多层次分析(AHP)法,以四川宣汉天台乡为研究区,根据该区实际情况,选取线性构造、道路、土地利用、坡度、坡向5种影响滑坡灾害发生的因素作为评价因子,进行区域滑坡危险性评估。在ArcGIS的空间分析环境中运行权重叠加,把研究区划分成滑坡极易发生区、易发生区、一般发生区、可能发生区、难发生区和极难发生区。通过实地调查和与研究区的滑坡灾害实证研究结果进行比较,发现评估结果与实际状况较为吻合,研究方法能够准确地评估区域滑坡灾害危险性的程度。  相似文献   

6.
地震扰动区存在大量震裂松散坡体,在持续或者密集的降雨条件下极易转化为滑坡灾害。同时,滑坡又会给泥石流提供大量松散固体物质,增加泥石流的危险性。因此,在震区,灾害通常以"链"的形式出现,比单一灾种危害性大。为了更有效地对地质灾害危险性进行评价,笔者将滑坡、泥石流作为灾害链,综合地加以分析和研究。选择5·12汶川大地震中受灾严重的都江堰市白沙河流域的17条泥石流沟作为研究区,建立滑坡-泥石流危险性评价耦合模型,研究24 h不同降雨量条件下小流域滑坡泥石流危险性的变化。耦合模型包括了坡体稳定性评价模型,水文模型及以泥石流规模、发生频率、流域面积、主沟长度、流域高差、切割密度、不稳定斜坡比为评价因子的泥石流危险性评价统计模型。研究结果表明:随着降雨量的增大,参与泥石流活动的松散物质方量持续增加,但当24 h降雨量超过200 mm后,泥石流沟的危险度等级不再发生变化;17条泥石流沟中4条为中危险度,12条为高危险度,1条为极高危险度。这说明研究区地质灾害问题相当严峻,在多雨季节存在泥石流群发的可能性,直接威胁到居住在泥石流沟附近的人民群众生命财产安全;因此,对于有直接危害对象的高危险度及其以上的泥石流沟,应该按照高等级设防标准进行工程治理及发布预警报。同时也说明,将滑坡、泥石流作为灾害链研究具必要性和可行性。  相似文献   

7.
危险性评价是滑坡灾害预防与减灾工作首要解决的重要内容.在地理信息系统技术支持下, 以山地灾害频发区——小江流域作为研究对象, 选取坡度、土体粘聚力和内摩擦角这3个评价指标构建滑坡危险性分级评价指标体系, 将投影寻踪技术运用到滑坡危险性等级评价中, 对评价样本的各指标因素进行线性投影, 以最优投影方向所对应的投影特征值作为评价依据, 建立了滑坡危险性等级综合评价模型, 绘制了滑坡危险性等级分布图.结果表明: 研究区极高危险区、高危险区、中等危险区、低危险区和极低危险区的面积比例为14.28∶9.41∶69.12∶7.00∶0.19;根据所建立的5级评价指标体系对研究区60个土质滑坡点资料进行了验证, 在占研究区总面积23.69%的高、极高危险区的小范围内, 实际发生土质滑坡数量45个, 占总土质滑坡数量的75.00%;中等危险性级别以上区域拥有的土质滑坡数量占全部土质滑坡的96.67%;不同危险性级别的滑坡体积方量统计结果表明, 滑坡体积方量密度随危险性级别的提高而迅速增加.对比评价结果及实测结果可知, 投影寻踪分级结果符合实际情况, 证实了该方法的正确性, 为滑坡危险性评价提供了一条新思路.   相似文献   

8.
基于GIS的巴东新县城滑坡灾害风险系统   总被引:3,自引:0,他引:3  
本文提出了基于GIS的滑坡灾害风险预测系统流程。并将滑坡灾害风险评价模型与GIS技术先进的图形处理和空间分析功能相结合,建立了巴东县新县城区滑坡灾害风险预测系统。系统由信息管理子系统、危险性预测子系统、易损性预测子系统、风险预测子系统四大子系统构成。系统在对相关信息进行采集、存贮、检索和管理的基础上,结合物元模型、BP模型等专业预测模型,实现了滑坡灾害危险性、易损性评价,最终取得了滑坡灾害风险分布图,为三峡库区内各县的滑坡灾害信息管理和风险预测提供了新途径。预测成果可为研究区的国土规划和移民工程的顺利实施提供依据和保障。  相似文献   

9.
山区地质灾害易发性评价对城镇地质灾害风险管理具有重要意义。本文以康定市为例,以斜坡单元为最小评价单元,选取高程、坡度、坡向、曲率、工程地质岩组、距道路距离、距断裂距离、距水系距离和斜坡结构等9个滑坡影响因子,根据各因子滑坡面积比曲线与证据权值曲线的突变点,划分滑坡影响因子二级状态,并对各影响因子进行相关性分析,剔除相关性较高的距道路距离因子,在此基础上,采用证据权模型进行滑坡易发性评价。对已有治理工程的斜坡单元,本文尝试利用折减系数法对其易发性进行进一步评价。结合现场调查,将研究区滑坡易发性程度划分为:极高易发、高易发、中等易发、低易发。评价结果表明,自然工况下极高易发区主要位于康定市炉城镇以及研究区北侧二道桥村一带,高易发区主要位于雅拉河、折多河与瓦斯沟河谷两侧,对治理工程所在的斜坡单元进行折减后,极高易发区面积由11.21%降至8.42%,滑坡比率由4.03降低至2.3,研究结果符合实际情况,模型精度达77.8%。评价结果较好地反映了康定市区的滑坡易发性分布情况,可为城镇精细化评价提供一定的参考依据。  相似文献   

10.

Debris flow has caused severe human casualties and economic losses in landslide-prone areas around the globe. A comprehensive understanding of the morphology and deposition mechanisms of debris flows is crucial to delineate the extent of a debris flow hazard. However, due to inherent complex field topography and varying compositions of the flowing debris, coupled with a lack of fundamental understanding about the factors controlling the geomaterial flow, interparticle interactions and its final settlement resulted in a limited understanding of the flow behaviour of the landslide debris. In this study, a physical model was set up in the laboratory to simulate and calibrate the debris flow using PFC, a distinct element modelling-based software. After calibration, a case study of the Varunavat landslide was taken to validate the developed numerical model. Following validation with an acceptable level of confidence, several models were generated to evaluate the effect of slope height, slope angle, slope profile, and grain size distribution of the dislodged geomaterial in the rheological properties of debris flow. Both qualitative and quantitative analysis of the landslide debris flow was performed. Finally, the utility of retaining wall and their effect on debris flow is also studied with different retaining wall positions along the slope surface.

  相似文献   

11.
大陆边缘深水区海底滑坡及其不稳定性风险评估   总被引:6,自引:1,他引:5  
海底滑坡是大陆坡一种常见的沉积作用过程。这种沉积作用包括滑塌和碎屑流等重力流作用过程,它能将沉积物运移数百公里,严重危害深水油气开发平台、油气管线、海底电缆等设施;同时,还可能导致巨大破坏性的海啸。虽然导致海底滑坡的因素很多,但近年来发现海底滑坡的触发机制可能与地震作用和海底天然气水合物的分解关系密切。随着深水油田的开发和深海工程的日益增多,这种地质作用越来越引起学术界和工业界的重视。在介绍大陆边缘深水区海底滑坡的构成、识别和触发机制的基础上,提出海底滑坡的地质风险评估方法。  相似文献   

12.
The Dereköy landslide threatening the town of Dereköy, Konya, Turkey is investigated in order to assess and manage the associated risk. Dereköy town, located 12 km west of Konya city center, which is the second largest city in central Anatolia, has been extending due to the demand for new settlement places in Konya for the last decade. As most of the town is situated on the slopes of Meram river valley, on which the slope movements are observed, the risk of landslide has been increasing due to these new settlements. In this study, the landslide risk in Dereköy is assessed by following the so-called decision analytical procedure. The risk is defined by multiplication of hazard and consequences of the hazard. The hazard, which is the probability of slope failure, is computed by using the first-order second-moment (FOSM) method. The possible consequences of a landslide in Dereköy are analyzed and their costs are assessed relative to each other. A decision tree for choosing among the possible alternatives for reducing the risk is constructed in order to manage the risk.  相似文献   

13.
2019年6月20日晚九寨沟普降大到暴雨,导致九寨沟景区内卓追沟、下季节海子沟、则查洼沟等多处发生泥石流。3条泥石流沟分别冲出固体物质2.79×104m3、3.7×104m3,2.67×104m3,造成多处停淤挡墙及拦砂坝损坏,并淤埋了景区内的部分道路,造成了交通的短时间中断。根据灾后地面调查和遥感解译,初步查明了本次泥石流灾害的成因和致灾过程机制。灾害成因:地震引发的崩塌滑坡产生大量的新增松散固体物源与原有的沟坡堆积物(包括老泥石流堆积物)在强降水的作用下形成泥石流,因此本次泥石流是地震和降雨共同作用的结果。通过泥石流发生前后各流域沟道纵剖面和典型横断面调查分析,发现泥石流致灾过程机制主要包括:(1)泥石流冲刷沟道使老泥石流堆积物参与泥石流运动、同时诱发沟岸失稳崩塌,因而增强泥石流规模和冲击力等动力学参数;(2)沟道卡口和崩滑体滑入沟道后导致泥石流堵塞,在后续泥石流的作用下发生级联溃决,进而增大泥石流峰值流量和冲击力等动力学参数。在两种机制的共同作用下,泥石流规模和冲击力等参数可能超出防治工程规划设计指标,进而导致防治工程损毁并淤埋道路。因此,建议充分考虑地震与强降雨复合作用下九寨沟景区泥石流风险评估、防治工程规划设计的合理性和可靠性等关键问题,以保障景区安全。  相似文献   

14.
白龙江中上游泥石流发育极为严重,危害、威胁巨大,研究该区泥石流的成灾模式和致灾模式对泥石流灾害防治、国土空间规划、生态文明建设具有重要的科学意义和实践指导价值。文中在分析白龙江流域中上游241条泥石流形成条件的基础上,对泥石流的成灾模式、致灾模式及泥石流防治进行了分析。研究结果表明:(1)泥石流受地形地貌影响显著,高差...  相似文献   

15.
基于聚类分析的滑坡灾害危险性区划研究   总被引:1,自引:1,他引:0       下载免费PDF全文
滑坡灾害危险性区划研究在城市规划决策方面具有重要的现实意义。聚类分析以统计学的形式将具有相似特征的数据进行归类,能够实现滑坡灾害危险性空间分布情况的定量评价。根据湖北省巴东县滑坡灾害统计资料,选择具有代表性的滑坡灾害影响因素作为危险性区划评价指标,采用熵权法和层次分析法相结合,综合评判各指标权重。并在此基础上,以MapGIS为操作平台,以C#语言编程实现了快速聚类算法,对研究区86216个单元进行了滑坡灾害属性分类及危险性等级自动识别,预测结果较好。本研究将综合权重评判方法与聚类模型结合,同时克服了聚类结果不能自动排序的困难,对处理大批量,多属性数据具有一定的创新性和实用价值。  相似文献   

16.
Landslide at Su-Hua Highway 115.9k triggered by Typhoon Megi in Taiwan   总被引:2,自引:2,他引:0  
This study focused on the landslide case at Su-Hua Highway 115.9k, Taiwan. A preliminary investigation was conducted on geomorphologic features change and landslide mechanisms using digital elevation models, geographical maps, and remote sensing images at different times in conjunction with geological surveys and analysis results. Using the results of geological surveys and physical model experiments, we constructed a discrete element method to simulate the process of landslide movement. The results revealed deformation in the metamorphic rock slopes upstream of 115.9k. The slopes around the erosion gully upstream presented visible slope toes cutting and tension cracks at the crest as well as unstable rock masses. According to the results of numerical simulation for typhoon Megi event, intense rains could induce slippage in the rock debris/masses in the source area, initially at a speed of 5–20 m/s. Subsequently, steeper terrain could cause the rock debris/masses to accelerate to form a high-speed (>30 m/s) debris slide quickly moving downstream to form an alluvial fan downstream by the sea.  相似文献   

17.
Landslide risk assessment and management: an overview   总被引:29,自引:0,他引:29  
Landslides can result in enormous casualties and huge economic losses in mountainous regions. In order to mitigate landslide hazard effectively, new methodologies are required to develop a better understanding of landslide hazard and to make rational decisions on the allocation of funds for management of landslide risk. Recent advances in risk analysis and risk assessment are beginning to provide systematic and rigorous processes to enhance slope management. In recent years, risk analysis and assessment has become an important tool in addressing uncertainty inherent in landslide hazards.This article reviews recent advances in landslide risk assessment and management, and discusses the applicability of a variety of approaches to assessing landslide risk. Firstly, a framework for landslide risk assessment and management by which landslide risk can be reduced is proposed. This is followed by a critical review of the current state of research on assessing the probability of landsliding, runout behavior, and vulnerability. Effective management strategies for reducing economic and social losses due to landslides are described. Problems in landslide risk assessment and management are also examined.  相似文献   

18.
秦岭中部太白县地质灾害发育特征及危险性评估   总被引:2,自引:0,他引:2  
王涛  吴树仁  石菊松  李滨  辛鹏 《地质通报》2013,32(12):1976-1983
以陕西省太白县为例,分析了秦岭中部山区地质灾害形成的地质环境条件,重点指出在植被茂密山区,异常强降雨及农耕、建房、修路和矿山开采4种人类工程活动对地质灾害的关键诱发作用。对崩塌、滑坡、泥石流和不稳定斜坡4类典型地质灾害进行了亚类细分和发育特征分析,并总结指出了地质灾害区域宏观分布特征。筛选了9种关键的地质灾害影响和诱发因素,基于将集中调查区指示的地质灾害发育规律,外推应用于全区地质灾害评估的思路,利用信息量模型对太白县全区进行了地质灾害危险性定量评估,结果显示高危险区主要集中分布在县域北部人口聚居的盆地区,以及南部河流与公路沿线地段。定量检验显示,危险性评估结果与地质灾害的实际分布十分吻合,表明基于信息量模型的地质灾害危险性评估方法能够很好地适用于秦岭腹地山区。  相似文献   

19.
基于有效降雨强度的滑坡灾害危险性预警   总被引:1,自引:0,他引:1       下载免费PDF全文
选取湖北省恩施地区1 000 km2区域作为典型研究区, 在全面分析该区域历史滑坡资料的基础上, 根据该区滑坡生成与地层岩性之间的关系, 将研究区地层划分为高、中、低3类易发性岩组.分岩组统计降雨监测数据与历史滑坡信息, 得出有效降雨强度与关键降雨持续时间的散点图, 由此确定不同滑坡发生概率的有效降雨强度阈值, 提出该区的滑坡灾害危险性预警判别模型.基于样本区统计数据建立滑坡预测指标体系, 运用GIS得出研究区域的滑坡空间易发性区划结果, 并根据不同易发岩组-有效降雨强度模型, 叠加滑坡灾害易发性分区结果与降雨危险性预警等级分级结果, 对研究区的滑坡灾害危险性进行了预测预警.结果表明: 不同易发岩组-有效降雨强度模型所得预警结果与实际情况吻合, 预警模型具有考虑全面和预警精度高的特点, 在实际预警中切实可用.   相似文献   

20.
For the socio-economic development of a country, the highway network plays a pivotal role. It has therefore become an imperative to have landslide hazard assessment along these roads to provide safety. The current study presents landslide hazard zonation maps, based on the information value method and frequency ratio method using GIS on 1:50,000 scale by generating the information about the landslide influencing factors. The study was carried out in the year 2017 on a part of Ravi river catchment along one of the landslide-prone Chamba to Bharmour road corridor of NH-154A in Himachal Pradesh, India. A number of landslide triggering geo-environmental factors like “slope, aspect, relative relief, soil, curvature, Land Use and Land Cover (LULC), lithology, drainage density, and lineament density” were selected for landslide hazard mapping based on landslide inventory. The landslide inventory has been developed using satellite imagery, Google earth and by doing exhaustive field surveys. A digital elevation model was used to generate slope gradient, slope aspect, curvature, and relative relief map of the study area. The other information, i.e., soil maps, geological maps, and toposheets, have been collected from various departments. The landslide hazard zonation map was categorized namely “very high hazard, high hazard, medium hazard, low hazard, and very low hazard.” The results from these two methods have been validated using area under curve (AUC) method. It has been found that hazard zonation map prepared using frequency ratio model had a prediction rate of 75.37% while map prepared using information value method had prediction rate of 78.87%. Hence, on the basis of prediction rate, the landslide hazard zonation map, obtained using information value method, was experienced to be more suitable for the study area.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号