首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
1INTRODUCTIONThesouthwesternregionoftheUnitedStates,includingSoutheastArizona,ischaracterizedbyasemiaridclimatewithhotsummers,mildwinters,andephemeralstreamsdrainingsparselyvegetatedareas.ChannelmorphologyoftheephemeralstreamsinSoutheastArizonaisinfluencedbybothlateralandverticalchannelchangesoccurringduringmajorfloods.Lateralchannelchangesoccurinthreewaysbankerosion,meandermigration,andchannelavulsion.Verticalchannelchangesinclude,beddegradationoraggradation,andmayoccurseparatelyorinco…  相似文献   

2.
This paper uses numerical simulation of flood inundation based on a coupled one‐dimensional–two‐dimensional treatment to explore the impacts upon flood extent of both long‐term climate changes, predicted to the 2050s and 2080s, and short‐term river channel changes in response to sediment delivery, for a temperate upland gravel‐bed river. Results show that 16 months of measured in‐channel sedimentation in an upland gravel‐bed river cause about half of the increase in inundation extent that was simulated to arise from climate change. Consideration of the joint impacts of climate change and sedimentation emphasized the non‐linear nature of system response, and the possibly severe and synergistic effects that come from combined direct effects of climate change and sediment delivery. Such effects are likely to be exacerbated further as a result of the impacts of climate change upon coarse sediment delivery. In generic terms, these processes are commonly overlooked in flood risk mapping exercises and are likely to be important in any river system where there are high rates of sediment delivery and long‐term transfer of sediment to floodplain storage (i.e. alluviation involving active channel aggradation and migration). Similarly, attempts to reduce channel migration through river bank stabilization are likely to exacerbate this process as without bank erosion, channel capacity cannot be maintained. Finally, many flood risk mapping studies rely upon calibration based upon combining contemporary bed surveys with historical flood outlines, and this will lead to underestimation of the magnitude and frequency of floodplain inundation in an aggrading system for a flood of a given magnitude. Copyright © 2006 John Wiley & Sons, Ltd.  相似文献   

3.
Recent research into flood modelling has primarily concentrated on the simulation of inundation flow without considering the influences of channel morphology. River channels are often represented by a simplified geometry that is implicitly assumed to remain unchanged during flood simulations. However, field evidence demonstrates that significant morphological changes can occur during floods to mobilize the boundary sediments. Despite this, the effect of channel morphology on model results has been largely unexplored. To address this issue, the impact of channel cross‐section geometry and channel long‐profile variability on flood dynamics is examined using an ensemble of a 1D–2D hydraulic model (LISFLOOD‐FP) of the ~1 : 2000 year recurrence interval floods in Cockermouth, UK, within an uncertainty framework. A series of simulated scenarios of channel erosional changes were constructed on the basis of a simple velocity‐based model of critical entrainment. A Monte‐Carlo simulation framework was used to quantify the effects of this channel morphology together with variations in the channel and floodplain roughness coefficients, grain size characteristics and critical shear stress on measures of flood inundation. The results showed that the bed elevation modifications generated by the simplistic equations reflected an approximation of the observed patterns of spatial erosion that enveloped observed erosion depths. The effect of uncertainty on channel long‐profile variability only affected the local flood dynamics and did not significantly affect the friction sensitivity and flood inundation mapping. The results imply that hydraulic models generally do not need to account for within event morphodynamic changes of the type and magnitude of event modelled, as these have a negligible impact that is smaller than other uncertainties, e.g. boundary conditions. Instead, morphodynamic change needs to happen over a series of events to become large enough to change the hydrodynamics of floods in supply limited gravel‐bed rivers such as the one used in this research. Copyright © 2014 John Wiley & Sons, Ltd.  相似文献   

4.
The effects of large floods on river morphology are variable and poorly understood. In this study, we apply multi‐temporal datasets collected with small unmanned aircraft systems (UASs) to analyze three‐dimensional morphodynamic changes associated with an extreme flood event that occurred from 19 to 23 June 2013 on the Elbow River, Alberta. We documented reach‐scale spatial patterns of erosion and deposition using high‐resolution (4–5 cm/pixel) orthoimagery and digital elevation models (DEMs) produced from photogrammetry. Significant bank erosion and channel widening occurred, with an average elevation change of ?0.24 m. The channel pattern was reorganized and overall elevation variation increased as the channel adjusted to full mobilization of most of the bed surface sediments. To test the extent to which geomorphic changes can be predicted from initial conditions, we compared shear stresses from a two‐dimensional hydrodynamic model of peak discharge to critical shear stresses for bed surface sediment sizes. We found no relation between modeled normalized shear stresses and patterns of scour and fill, confirming the complex nature of sediment mobilization and flux in high‐magnitude events. However, comparing modeled peak flows through the pre‐ and post‐flood topography showed that the flood resulted in an adjustment that contributes to overall stability, with lower percentages of bed area below thresholds for full mobility in the post‐flood geomorphic configuration. Overall, this work highlights the potential of UAS‐based remote sensing for measuring three‐dimensional changes in fluvial settings and provides a detailed analysis of potential relationships between flood forces and geomorphic change. Copyright © 2015 John Wiley & Sons, Ltd.  相似文献   

5.
1 INTRODUCTION A headcut, which is an abrupt break in the slope of a channel bed, is often called a “knickpoint” or “scarp” in the study of rivers and waterways. A headcut tends to retreat upstream as water flows over it. As a headcut passes a cross s…  相似文献   

6.
The Afon Trannon, a gravel-bed river in mid-Wales with a catchment area of 72 km2, has recently been the subject of an engineering flood protection scheme. Following the enlargement and grading of the channel, lateral instability has produced considerable problems of maintenance. Geomorphological investigations are described which attempt to pinpoint the lessons of the scheme. Historical studies of floodplain sediments and channel change indicate firstly, an initially rather stable channel, but secondly a considerable, early history of channelization which may still have repercussions for system stability. This early channelization has now been modified in the recent scheme. Contemporary field study by survey and sediment tracing using the magnetic technique indicates the present instability of the sediments in a meandering channel given a trapezoidal cross-section and varied banks. Low-flow adjustments are as important as flood adjustments in the lower, straightened reach. Lessons for engineering schemes include the desirability of assessing erosion risk by rapid, cheap field techniques and historical investigations, and the consideration of more ecologically acceptable channel designs.  相似文献   

7.
This paper presents an approach to incorporate time‐dependent dune evolution in the determination of bed roughness coefficients applied in hydraulic models. Dune roughness is calculated by using the process‐based dune evolution model of Paarlberg et al. ( 2009 ) and the empirical dune roughness predictor of Van Rijn ( 1984 ). The approach is illustrated by applying it to a river of simple geometry in the 1‐D hydraulic model SOBEK for two different flood wave shapes. Calculated dune heights clearly show a dependency on rate of change in discharge with time: dunes grow to larger heights for a flood wave with a smaller rate of change. Bed roughness coefficients computed using the new approach can be up to 10% higher than roughness coefficients based on calibration, with the largest differences at low flows. As a result of this larger bed roughness, computed water depths can be up to 15% larger at low flow. The new approach helps to reduce uncertainties in bed roughness coefficients of flow models, especially for river systems with strong variations in discharge with time. Copyright © 2010 John Wiley & Sons, Ltd.  相似文献   

8.
在冲积河流上,各类河道整治工程的实施一定程度上会影响河床的演变过程.本文通过改进现有的一维水沙数学模型,重点研究护岸及护滩(底)这类限制河床进一步冲刷的整治工程对水沙输移及河床冲淤变形的影响.首先对固定断面的各节点采用特定的代码进行标记,以此区分河漫滩、有或无整治工程的主槽区域.然后对悬沙输移及河床冲淤变形模块进行改进:当断面发生淤积时,其形态调整不受整治工程的影响,淤积量将在整个断面上进行分配;当发生冲刷时,断面形态调整仅发生在未实施工程的位置或者受工程限制但形成了一定厚度淤积层的区域;在实施了整治工程且无法提供沙源的区域,河床冲刷则不会发生.最后长江中游荆江段2016年的模拟结果表明:考虑整治工程情况时,改进模型计算的河道冲刷量偏小且与实测值更为接近;河槽断面形态与实测结果也更为吻合.  相似文献   

9.
The 1999 jökulhlaup at Sólheimajökull was the first major flood to be routed through the proglacial system in over 600 years. This study reconstructed the flood using hydrodynamic, sediment transport and morphodynamic numerical modelling informed by field surveys, aerial photograph and digital elevation model analysis. Total modelled sediment transport was 469 800 m3 (+/‐ 20%). Maximum erosion of 8.2 m occurred along the ice margin. Modelled net landscape change was –86 400 m3 (+/‐ 40%) resulting from –275 400 m3 (+/‐ 20%) proglacial erosion and 194 400 m3 (+/‐ 20%) proglacial deposition. Peak erosion rate and peak deposition rate were 650 m3 s‐1 (+/‐ 20%) and 595 m3 s‐1 (+/‐ 20%), respectively, and coincided with peak discharge of water at 1.5 h after flood initiation. The pattern of bed elevation change during the rising limb suggested widespread activation of the bed, whereas more organisation, perhaps primitive bedform development, occurred during the falling limb. Contrary to simplistic conceptual models, deposition occurred on the rising stage and erosion occurred on the falling limb. Comparison of the morphodynamic results with a hydrodynamic simulation illustrated effects of sediment transport and bed elevation change on flow conveyance. The morphodynamic model advanced flood arrival and peak discharge timings by 100% and 19%, respectively. However, peak flow depth and peak flow velocity were not significantly affected. We suggest that morphodynamic processes not only increase flow mass and momentum but that they also introduce a feedback process whereby flood conveyance becomes more efficient via erosion of minor bed protrusions and deposition that infills or subdues minor bed hollows. A major implication of this study is that reconstructions of outburst floods that ignore sediment transport, such as those used in interpretation of long‐term hydrological record and flood risk assessments, may need considerable refinement. Copyright © 2015 John Wiley & Sons, Ltd.  相似文献   

10.
Reservoir release wave routing during 33 controlled reservoir releases, along 15 upland boulder bed river channel reaches, on five different regulated rivers were monitored to assess the importance of river channel roughness and reservoir release magnitude on reservoir release wave speeds. Wave speeds varied between 0.52 and 3.01 m s?1. Reservoir release wave translation, steepening, and attenuation occurred. With high channel roughness values reservoir release wave arrival speed is retarded in comparison to peak stage and wave steepening occurs, but with a reduction in channel roughness reservoir release wave front arrival is accelerated producing attentuation. The threshold between reservoir release wave front attenuation and steepening occurs at a pre-release discharge/channel width of approximately 0.1, an index of channel roughness. The paper also demonstrates, via comparison of observed and calculated reservoir release wave speeds on the River Washburn, Yorkshire, the difficulty of accurately predicting flood wave movement in upland boulder bed channels using existing prediction equations. The calculated values, however, revealed systematic error with pre-release discharge and reservoir release magnitude. Apparently the equations fail to account for the effects of high channel roughness together with pressure gradient forces, induced by rapid rates of stage change on the rising limb of reservoir releases. In order to accurately predict reservoir release wave movement in regulated rivers, this paper demonstrates that hydraulic studies need to be undertaken and pre-release discharges prescribed to determine desired reservoir release wave routing behaviour. Manipulation of the reservoir release pattern at the dam alone, cannot dictate reservoir release wave front form downstream or wave speed.  相似文献   

11.
MODELINGOFRIVERMORPHOLOGICCHANGESCharlesC.S.SONG;YifanZHENG;andChihTedYANG(Professor,St.AnthonyFallsHydraulicLaboratory,Depar...  相似文献   

12.
We exploit a natural experiment caused by an extreme flood (~500 year recurrence interval) and sediment pulse derived from more than 2500 concurrent landslides to explore the influence of valley‐scale geomorphic controls on sediment slug evolution and the impact of sediment pulse passage and slug deposition and dispersion on channel stability and channel form. Sediment slug movement is a crucial process that shapes gravel‐bed rivers and alluvial valleys and is an important mechanism of downstream bed material transport. Further, increased bed material transport rates during slug deposition can trigger channel responses including increases in lateral mobility, channel width, and alluvial bar dominance. Pre‐ and post‐flood LiDAR and aerial photographs bracketing the 2007 flood on the Chehalis River in south‐western Washington State, USA, document the channel response with high spatial and temporal definition. The sediment slug behaved as a Gilbert Wave, with both channel aggradation and sequestration of large volumes of material in floodplains of headwaters' reaches and reaches where confined valleys enter into broad alluvial valleys. Differences between the valley form of two separate sub‐basins impacted by the pulse highlight the important role channel and channel‐floodplain connectivity play in governing downstream movement of sediment slug material. Finally, channel response to the extreme flood and sediment pulse illustrate the connection between bed material transport and channel form. Specifically, the channel widened, lateral channel mobility increased, and the proportion of the active channel covered by bars increased in all reaches in the study area. The response scaled tightly with the relative amount of bed material sediment transport through individual reaches, indicating that the amount of morphological change caused by the flood was conditioned by the simultaneous introduction of a sediment pulse to the channel network. Copyright © 2015 John Wiley & Sons, Ltd.  相似文献   

13.
The peak of river floods usually decreases in the downstream direction unless it is compensated by freshwater inflow from tributaries. In the Yellow River (China) the opposite is regularly observed, where the peak discharge of river floods increases in the downstream direction (at a rate far exceeding the contribution from tributaries). This flood peak discharge increase is probably related to rapid morphological changes, to a modified bed friction, or to a combination of both. Yet the relative role of these processes is still poorly understood. This paper aims to analyze the relative contribution of bed erosion and friction change to the peak discharge increase, based on available data and a recently developed numerical model. Using this high-resolution, fully coupled morphodynamic model of non-capacity sediment transport, two hyperconcentrated floods characterized by downstream peak discharge increase are numerically reproduced and analyzed in detail. The results reveal that although erosion effects may contribute to the downstream discharge increase (especially in case of extreme erosion), for most cases the increase must be mainly due to a reduction in bed friction during peak discharge conditions. Additionally, based on the concept of channel storage reduction, the effects of decreasing bed friction and (very strong) bed erosion can be integrated in explaining the peak discharge increase.  相似文献   

14.
The process of dam removal establishes the channel morphology that is later adjusted by high-flow events. Generalities about process responses have been hypothesized, but broad applicability and details remain a research need. We completed laboratory experiments focused on understanding how processes occurring immediately after a sediment release upon dam removal or failure affect the downstream channel bed. Flume experiments tested three sediment mixtures at high and low flow rates. We measured changes in impounded sediment volume, downstream bed surface, and rates of deposition and erosion as the downstream bed adjusted. Results quantified the process responses and connected changes in downstream channel morphology to sediment composition, temporal variability in impounded sediment erosion, and spatial and temporal rates of bedload transport. Within gravel and sand sediments, the process response depended on sediment mobility. Dam removals at low flows created partial mobility with sands transporting as ripples over the gravel bed. In total, 37% of the reservoir eroded, and half the eroded sediment remained in the downstream reach. High flows generated full bed mobility, eroding sands and gravels into and through the downstream reach as 38% of the reservoir eroded. Although some sediment deposited, there was net erosion from the reach as a new, narrower channel eroded through the deposit. When silt was part of the sediment, the process response depended on how the flow rate influenced reservoir erosion rates. At low flows, reservoir erosion rates were initially low and the sediment partially exposed. The reduced sediment supply led to downstream bed erosion. Once reservoir erosion rates increased, sediment deposited downstream and a new channel eroded into the deposits. At high flows, eroded sediment temporarily deposited evenly over the downstream channel before eroding both the deposits and channel bed. At low flows, reservoir erosion was 17–18%, while at the high flow it was 31–41%.  相似文献   

15.
Severe bank erosion at lowland rivers in Bangladesh devours vast tract of lands and renders thousands of people homeless at high flood; also,rapid deposition changes bed topographies and seriously redu...  相似文献   

16.
Riverbank erosion is a major contributor to catchment sediment budgets. At large spatial scales data is often restricted to planform channel change, with little information on process distributions and their sediment contribution. This study demonstrates how multi‐temporal LiDAR and high resolution aerial imagery can be used to determine processes and volumes of riverbank erosion at a catchment scale. Remotely sensed data captured before and after an extreme flood event, enabled a digital elevation model of difference (DoD) to be constructed for the channel and floodplain. This meant that: the spatial area that could be assessed was extensive; three‐dimensional forms of bank failures could be mapped at a resolution that enabled process inference; and the volume and rates of different bank erosion processes over time could be assessed. A classification of riverbank mass failures, integrating form and process, identified a total of 437 mass failure polygons throughout the study area. These were interpreted as wet flow mass failures based on the presence of a well defined scarp wall and the absence of failed blocks on the failure floor. The failures appeared to be the result of: bank exfiltration, antecedent moisture conditions preceding the event, and the historic development of the channel. Using one‐dimensional hydraulic modelling to delineate geomorphic features within the main boundary of the macrochannel, an estimated 1 466 322 m2 of erosion was interpreted as fluvial entrainment, occurring across catchment areas from 30 to 1668 km2. Only 8% of the whole riverbank planform area was occupied by mass failures, whilst fluvial entrainment covered 33%. A third of the volume of material eroded came from mass failures, even though they occupied 19% of the eroded bank area. The availability of repeat LiDAR surveys, combined with high‐resolution aerial photography, was very effective in erosion process determination and quantification at a large spatial scale. Copyright © 2013 John Wiley & Sons, Ltd.  相似文献   

17.
We use field measurements and airborne LiDAR data to quantify the potential effects of valley geometry and large wood on channel erosional and depositional response to a large flood (estimated 150-year recurrence interval) in 2011 along a mountain stream. Topographic data along 3 km of Biscuit Brook in the Catskill Mountains, New York, USA reveal repeated downstream alternations between steep, narrow bedrock reaches and alluvial reaches that retain large wood, with wood loads as high as 1261 m3 ha−1. We hypothesized that, within alluvial reaches, geomorphic response to the flood, in the form of changes in bed elevation, net volume of sediment eroded or aggraded, and grain size, correlates with wood load. We hypothesized that greater wood load corresponds to lower modelled average velocity and less channel-bed erosion during the flood, and finer median bed grain size and a lower gradation coefficient of bed sediment. The results partly support this hypothesis. Wood results in lower reach-average modelled velocity for the 2011 flood, but the magnitude of change in channel-bed elevation after the 2011 flood among alluvial and bedrock reaches does not correlate with wood load. Wood load does correlate with changes in sediment volume and bed substrate, with finer grain size and smaller sediment gradation in reaches with more wood. The proportion of wood in jams is a stronger predictor of bed grain-size characteristics than is total wood load. We also see evidence of a threshold: greater wood load correlates with channel aggradation at wood loads exceeding approximately 200 m3 ha−1. In this mountain stream, abundant large wood in channel reaches with alluvial substrate creates lower velocity that results in finer bed material and, when wood load exceeds a threshold, reach scale increases in aggradation. This suggests that reintroducing small amounts of wood or one logjam for river restoration will have limited geomorphic effects. © 2020 John Wiley & Sons, Ltd.  相似文献   

18.
Observation of the operation of the Sanmenxia Reservoir on the Yellow River has led to the conclusion that to preserve a certain effective storage volume for reservoirs built on heavily silt-laden rivers is feasible if the reservoir is operated according to the principle known as "storing the clear water and discharging the muddy flow". The relative stability of the bed elevation at the end of the backwater and the reservoir's erosion and deposition equilibrium depend on the compatibility of the pool level maintained in non-flood seasons with the conditions of flow and sediment load during flood seasons. Operating the reservoir to regulate the flood and sediment load during flood seasons can reduce the rate of aggradation in the Lower Yellow River. The basic condition for applying the operation mode of "storing the clear water and discharging the muddy flow" is that a sufficient amount of water should be used for discharging sediment during flood seasons. Under the condition of extremely low flow years, reservoir sedimentation cannot be avoided even if this operation mode is adopted.  相似文献   

19.
1 INTRODUCTION Local scour at bridge piers and abutments has long concerned engineers. Scour depth estimation has attracted considerable research interest and activity, and a number of prediction methods exist at present (see, e.g., comprehensive lists of predictors given by Melville and Colleman, 2000). Several studies have been completed since the 1950s for the particular case of scour at bridge abutments. Since the beginning of the 1980s, the University of Auckland, New Zealand, …  相似文献   

20.
The main objective of this study was to quantify the error associated with input data, including various resolutions of elevation datasets and Manning’s roughness for travel time computation and floodplain mapping. This was accomplished on the test bed, the Grand River (Ohio, USA) using the HEC-RAS model. LiDAR data integrated with survey data provided conservative predictions, whereas coarser elevation datasets provided a positive difference in the travel time (11.03–15.01%) and inundation area (32.56–44.52%). The minimum differences in travel time and inundation area were 0.50–4.33% and 3.55–7.16%, respectively, when the result from LiDAR integrated with survey data was compared with a 10-m DEM integrated with survey data. The results suggest that a 10-m DEM in the channel and LiDAR data in the floodplain combined with survey data would be appropriate for a flood warning system. Additionally, Manning’s roughness of the channel section was found to be more sensitive than that of the floodplain. The decrease in inundation area was highest (8.97%) for the lower value of Manning’s roughness.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号