无传统换撑条件下的深基坑支护工程
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU473.2

基金项目:


Deep Excavation Supporting Engineering without Traditional Support Replacement Condition
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    通过工程实例,介绍了在无传统换撑(即地下一层楼板)条件下的一种换撑方案,即采用一排钻孔灌注桩作为挡土结构,坑内设置2道钢筋混凝土内支撑,钻孔灌注桩外侧设置2排深层水泥搅拌桩作止水帷幕,同时可防止淤泥挤入。实际开挖证明该换撑做法是安全、可靠的。

    Abstract:

    With an engineering case, the paper introduced a new support replacement plan when there is no condition for traditional support replacement construction. A row of bored cast-in-place piles are taken as retaining structure, 2 lines of steel concrete inner support in the excavation, 2 rows of deep cement mixing pile outside the piles as water-stop curtain which can prevent silt to get in. It is proved that this support replacement is safe and reliable.

    参考文献
    相似文献
    引证文献
引用本文

潘德来,陈跃.无传统换撑条件下的深基坑支护工程[J].钻探工程,2009,36(12):43-46.
PAN De-lai, CHEN Yue. Deep Excavation Supporting Engineering without Traditional Support Replacement Condition[J]. Drilling Engineering, 2009,36(12):43-46.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2009-07-06
  • 最后修改日期:2009-07-06
  • 录用日期:2009-11-12
  • 在线发布日期: 2010-01-11
  • 出版日期: 2009-12-25
×
《钻探工程》期刊采编系统正在进行升级改版,部分功能正在逐步完善,在此期间给大家的使用带来不便,敬请谅解。